Informs That on 990428,FirstEnergy Submitted Post Exam Results of Weld Overlay Repair for Feedwater Nozzle to safe-end Weld at Perry Nuclear Power Plant,Unit 1 (PNPP)
PY-CEI-NRR-2408, Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval
ML20195H905
ML20195G674
ML20212H584
PY-CEI-NRR-2405, Informs NRC That PNPP Staff Has Implemented Formal Industry Position on Severe Accident Mgt
PY-CEI-NRR-2377, Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1
PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999
ML20211A399
PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706
PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant
PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant
ML20196H964
ML20211A388
ML20209D593
ML20209E595
ML20210A644
PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates
PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to PNPP Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld
ML20210E066
ML17191B403
ML20210G841
PY-CEI-NRR-2417, Forwards NP0059-007, PNPP - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000
ML20210K633
ML20210Q798
PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for PNPP Covering Period of 990101-990630
PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826
ML20210Q583
PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready
ML20210S396
ML20210R786
ML20210Q842
PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl
PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2
ML20211Q691
ML20217A897
PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages
ML20212A837
ML20212D015
PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions
PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams
ML20212G581
ML20212G416
ML20212K927
ML20212J145
ML20217E711
ML18023A070
PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect
ML20217G920
PY-CEI-NRR-2438, Informs That DBNPS & PNPP Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl
WBat man RHermann Mr. Lew W. Myers JZwolinski/SBlack OGC Vice President - Nuclear, Perry ACRS GGrant, R3 FirstEnergy Nuclear Operating Company CThomas/AMendiola DPickett P.O. Box 97, A200 EBarnhill Perry, OH 44081
SUBJECT:
ASSESSMENT OF FEEDWATER NOZZLE POST REPAIR FLAW EVALUATION-PERRY NUCLEAR POWER PLANT, UNIT 1 (TAC NO. MA5061)
Dear Mr. Myers:
By FW Nozzle to safe-en|letter dated April 28,1999]] (PY-CEl/NRR-2396L), FirstEnergy submitted the post examination results of a weld overlay repair for a feedwater nozzle to safe-end weld at the Perry Nuclear Power Plant, Unit 1 (PNPP). During the final weld acceptance examinations, ultrasonic examination results indicated several areas of the weld overlay centained a Lack of Fusion (LOF) within the weld metal and Lack of Bonding (LOB) to the base metal.
Your letter contained an engineering evaluation to evaluate the weld overlay LOB and LOF areas for acceptance under the stress requirements contained in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section ill, NB 3200 and ASME Code Case N-504. The evaluation also determined whether ASME Code,Section XI, Appendix C, safety margins are still maintained with the presence of the flaws in the overlay. Your evaluation concluded that the weld overlay repair maintains ASME Code,Section XI, Appendix C, safety margins and ASME Code Case N-504 stress limits thereby demonstrating the adequacy of the existing weld repair for continued operation.
Based on the staff's initial review of the submittal, no technical issues related to the weld repair have been identified that should prevent the restart of PNPP from the current refueling outage.
The results of the staff's completed evaluation will be provided to you at a later date. Any concems that arise during the staff's review will be promptly communicated.
Sincerely, Original signed by Anthony J. Mendiola, Chief, Section 2 Project Directorate Ill Division of Licensing Project Management O
Office of Nuclear Reactor Regulation Docket No. 50-440 M
cc: See next page 040076 DOCUMENT NAME: G:\\PD3-3\\ PERRY \\A5061LT2.WPD To receive a copy of this document,indic(tgin the@ox: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy 0FFICE PM:LPQ,p
4AWh, 0>
BC:EMCB SC:LPD3 /
NAME DPicke't't' h@rnh$
WBateman*
/#endfo1 V/
DATE 04/3099 04/9'/99 04/30/99 645399 0FFICIAL RECORD COPY
See previous concurrence 9905040124 990430 PDR ADOCK 05000440 P
Akron, OH 44308 2855 West Dublin Granville Road Columbus, OH 43235-7150 l
Resident inspector's Office U.S. Nuclear Regulatory Commission Mayor, Village of Perry P.O. Box 331
- P.O. Box 100 Perry, OH 44081-0331 Perry, OH 44081-0100 Regional Administrator, Region 111 Radiological Health Program U.S. Nuclear Regulatory Commission Ohio Department of Health j
801 Warrenville Road P.O. Box 118 I
Lisle,IL~ 60532-4531 Columbus, OH 43266-0118 l
Sue Hiatt Ohio Environmental Protection OCRE Interim Representative Agency i
8275 Munson DERR-Compliance Unit Mentor, OH 44060 ATTN: Mr. Zack A. Clayton P.O. Box 1049 Henry L. Hegrat Columbus, OH 43266-0149 i
Regulatory Affairs Manager i
l FirstEnergy Nuclear Operating Company Chairman Perry Nuclear Power Plant Perry Township Board of Trustees P.O. Box 97, A210 3750 Center Road, Box 65 Perry, OH 44081 Perry,OH 44081 l
William R. Kanda, Jr., Plant Manager State of Ohio FirstEnergy Nuclear Operating Company Public Utilities Commission Perry Nuclear Power Plant East Broad Street P.O. Box 97, SB306 Columbus, OH 43266-0573 l
Perry, OH 44081 Mayor, Village of North Perry
~ North Perry Village Hall 4778 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division ofIndustrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009