Submits Response to Requests for Addl Info to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, for Perry Nuclear Plant,Unit 1
ML20210K633
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/04/1999
From: Pickett D
NRC (Affiliation Not Assigned)
To: Jeffery Wood
ENTERGY OPERATIONS, INC.
References
GL-92-01, TAC-M92714, TAC-MA1205, NUDOCS 9908060184
Download: ML20210K633 (3)


Text

'

\

, p@"%

3o 4 UNITED STATES lo j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 August 4, 1999 k*sse [ s Mr. John K. Wood Vice President - Nuclear, Perry -

FirstEnergy Nuclear Operating Company P.O. Box 97, A200 Perry, OH 44081

SUBJECT:

CLOSURE OF TAC NOS. M92714 AND MA1205 - RESPONSE TO THE REQUESTS FOR ADDITIONAL INFORMATION TO GENERIC LETTER 92-01, REVISION 1, SUPPLEMENT 1, " REACTOR VESSEL STRUCTURAL INTEGRITY," FOR THE PERRY NUCLEAR POWER PLANT, UNIT NO.1 i

Dear Mr. Wood:

l On May 19,1995, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter 92-01, Revision 1, Supplement 1 (GL 92-01, Rev.1, Supp.1), " Reactor Vessel Structural integrity," to l holders of nuclear operating licenses. In issuing the GL, the staff required addressees of the GL to:

(1) ~ identify, collect and report any new data pertinent to the analysis of structuralintegrity of the reactor pressure vessels (RPVs) at their nuclear plants, and (2) to assess the in1 pact of that data on their RPV integrity analyses relative to the requirements of Sections 50.60 and 50.61 to Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.60 and 10 CFR 50.61), and to the requirements of Appendices G and H to Part 30 of Title 10 of the Code of FederalRegulations (Appendices G and H to 10 CFR Part 50).

On August 17,1995 (PY-CEl/NRR-1977L), you submitted your initial response to GL 92-01, Rev.1, Supp.1, and provided the requested information relative to the structural integrity assessments for the Perry Nuclear Power Plant, Unit No.1 (PNPP). The staff evaluated your response to GL 92-01, Rev.1, Supp.1, and provided its conclusion relative to your response on August 19,1996. However, since the time of the staffs closure letter, the Combustion Engineering (CE) Owners Group and the Babcock and Wilcox (B&W) Owners Group have each

)

submitted additional data regarding the alloying chemistries of beltline welds in CE and B&W fabricated vessels. The additional alloying data were submitted in Topical Reports CE NPSD- {

1039, Revision 2, CE NPSD-1119, Revision 1, for CE fabricated RPV welds, and BAW-2325, @

Revision 1, for B&W fabricated RPV welds. In addition, Chicago Bridge and Iron (CB&l) BWR  ;

data were submitted in Topical Report BWR\/IP-46. As a result of the efforts by CE and B&W, the staff determined that additional information was necessary relative to the structural integrity i

assessments for your plant. On May 4,1998, the staff issued a request for additional 60 i

information (RAl) in regard to the alloying chemistries of beltline welds, your assessment of surveillance data for your facility, and pressure-temperature (P-T) limits for PNPP. In general, v h

with respect to the contents of the RAI, the staff requested that you reassess the alloying cenom MPS R .F g g g s CDPi 9908060184 990004 PDR ADOCK 05000440 P PDR l

b J. Wood chemistries for the beltline welds and RPV surveillance welds relative to the chemistries provided in the applicable topical report, and provide the impact of any changes to the best estimate chemistries for your beltline RPV welds on the structural integrity assessments for your facility relative to the requirements of 10 CFR 50.60,_10 CFR 50.61, and Appendices G and H to 10 CFR Part 50, as applicable to the licensing basis for your plant.

~

You provided your response to the staff's RAI for PNPP on August 4,1998 (PY-CEl/NRR-2312L). As a result of the staff's review of your responses to GL 92-01, Revision 1, GL 92-01, Rev.1, Supp.1, and the Supp.1 RAI, the staff has revised the information in the Reactor Vessel Integrity Database (RVID) and is releasing it as RVID Version 2.

The new database diskettes are posted on the world-wide-web at a location which is linked to 4 the NRC home page (http://www.nrc. gov /NRR/RVID/index.html). We recommend that you review this information. If the staff does not receive comments by September 1,1999, we will assume that the data entered into the RVID are acceptable for your plant. No additional information is necessary with regard to the structural integrity assessments. Future submittals ,

on P-T limits, or upper shelf energy (USE) should reference the most current information.

This closes the staffs efforts in regard to TAC Nos. M92714 and MA1205. The staff appreciates your efforts in regard to this matter.

Sincerely, Original Signed By Douglas V. Pickett, Senior Project Manager, Section 2 Project Directorate lil Division of Licensing and Project Management Office of Nuclear Reactor Regulation Docket No. 50-440 cc: sse next page Distribution:

PUBLIC - DOCKET FILE KWichman PDlli R/F Alee, EMCB OGC JZwolinski/SBlack GGrant, R3 CThomas/AMendiola DOCUMENT NAME: G:\PDill-2\ PERRY \A1205LTR.WPD j To RECEIVE A COPY OF THis DOCUMENT, INDICATE IN THE box: "C" = COPY WITHouT ENCLOSURES "E" = COPY wlTH ENCLOSURES "N" h

l OFFICE PM:LPD4 LA:LPD3 SC:EMCB SC:LPJjl3 NAME DPicYett EBarnhill (( KWichman* [,7, DATE 7/ 2.1 /99 7/ M /99 06/20/99 [7} Y/99 OFFICIAL RECORD COPY

'See KWichman memo to Section Chiefs dated 6/20/99 f L

i J. Wood ' Perry Nuclear Power Plant, Units 1 and 2 FirstEnergy Nuclear Operating Company cc:

James R. Williams Mary E. O'Reilly Chief of Staff >

FirstEnergy Corporation Ohio Emergency Management Agency ,

76 South Main St. 2855 West Dublin Granville Road 1 Akron, OH 44308 Columbus, OH 43235-7150 Resident inspector's Office Mayor, Village of Perry U.S. Nuclear Regulatory Commission P.O. Box 100 P.O. Box 331 Perry, OH 44081-0100 Perry, OH 44081-0331 Radiological Health Program Regional Administrator, Region lll Ohio Department of Health U.S. Nuclear Regulatory Commission P O. Box 118 801 Warrenville Road Columbus, OH 4326fr0118 l Lisle, IL 60532-4531 Ohio Environmental Protection Sue Hiatt Agency l

OCRE Interim Representative DERR--Comphance Unit l 8275 Munson ATTN: Mr. Zack A. Clayton Mentor, OH 44060 P.O. Box 1049 Columbus, OH 43266-0149 l Henry L. Hegrat l Regulatory Affairs Manager Chairman  !

FirstEnergy Nuclear Operating Company Perry Township Board of Trustees

Perry Nuclear Power Plant 3750 Center Road, Box 65 P.O. Box 97, A210 Perry, OH 44081 ,

Perry, OH 44081  ;

State of Ohio William R. Kanda, Jr., Plant Manager Public Utilities Commission FirstEnergy Nuclear Operating Company East Broad Street l Perry Nuclear Power Plant Columbus, OH 43266-0573 P.O. Box 97, SB306 Perry, OH 44081 Mayor, Village of North Perry

, North Perry Village Hall 4778 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance l Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009