March 17, 1999
i
-
Mr. Lew W. Myers
Vice President - Nuclear
FirstEnergy Nuclear Operating Company
i
P. O. Box 97, A200
Perry, OH 44081
SUBJECT:
NRC ROUTINE RADIATION PROTECTION INSPECTION REPORT
50-440/99004(DRS)
- Dear Mr. Myers:
On February 26,1999, the NRC completed an inspection at your Perry Nuclear Power Plant.
The enclosed report presents the results of that inspection. No violations of NRC requirements
were identified.
The inspection was an examination of activities conducted under your license as they relate to
radiation safety and to compliance with the Commission's rules and regulations and with the
conditions of yourlicense. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with personnel, and
. observation of activities in progress. Specifically, the inspection focused on radiological
planning for your Spring _1999 refueling outage, on the assessments of the radiation protection
program, and on radiological training for general employees. During this inspection, the
radiological controls for maintenance associated with the inclined fuel transfer system and two
previous inspection items were also reviewed.
We observed effective radiological planning for the 1999 refueling outage. The radiation
,
prctection staff was properly evaluating radiological hazards associated with planned outage
evolutions and actions to reduce outage dose. In particular, we observed strong management
commitment to dose reduction initiatives, which included scheduled system flushes and the
use of the Unit 2 facility for training. During the inclined fuel transfer system maintenance, the
radiation protection staff provided effective oversight of the diving evolution, which was
consistent with the controls contained in the radiological planning. Your staff also performed
comprehensive self assessments of radiation protection performance and provided appropriate
radiological training to radiation workers.
in accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter and its
enclosure will be placed in the NRC Public Document Room'.
9903240303 990317
7
ADOCK 05000440
G
.
. .-
- . - . . - . - - ..
- . . -
. ..
_ . . - . . . . - . . - . - - . . . . - - - .
- - . ~ .
!
?
-
l
l
l.
.
l
L. Myers -
-2-
l
I
We will gladly discuss any questions you have conceming this inspection.
l.
Sincerely,
I
l
Original Signed by Gary L. Shear
I-
!
Gary L. Shear, Chief
Plant Support Branch
i
Docket No.:
50-440
License No.: NPF-58
I
!
~ Enclosure:
Inspection Report 50-440/99004(DRS)
l-
cc w/ancl:
H. Hegrat, Manager, Regulatory Affairs
l
R. Schrauder, Director, Nuclear
-
l
Engineering Department
W. Kanda, General Manager
Nuclear Power Plant Department
l
N. Bonner, Director, Nuclear
Maintenance Department
H. Bergendahl, Director
Nuclear Services Department
Ohio State Liaison Officer
,
!
R. Owen,- Ohio Department of Health
C. Glazer, State of Ohio Pubi;c
Utilities Commission
1
1
.
l
DOCUMENT NAME: G:\\DRS\\PER99004.WPD
/
r.
. - .esi
,tme
. we v .c- - es
oeio.o
v .cm . .=c~o
, 6 ,. .c. =em
l
OFFICE
Rill
-lC
Rlli
.l6
Rill
, l/./
l
NAME
Orth:jp SeO
Shear (446
Kozak '7M
'
(
DATE
03/u /99
03/4/99
03//@9 '
OFFICIAL RECORD COPY
.
.,.-,.
.
- . . ,
,.
-
_-
-
-.
-
- - .
.
. . . - .
- . . - _
. . . .
. -
- - . .
. .
.
.
'q'4r
!k
l
.
L. Myers
-3-
Distribution:
RPC (E-Mail)
Project Mgr., NRR w/ enc!
J. Caldwell, Rlll w/ encl
B. Clayton, Rlli w/enci
SRI Perry w/enct
.
DRP w/enct
TSS w/enci
DRS (2) w/ encl
Rlli PRR w/enct
PUBLICJE-Ofwlenci
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
,
i
i
l
240200
-
i
I-
l
,
t
_
_