ML20210E066
| ML20210E066 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/22/1999 |
| From: | Kozak T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Wood CENTERIOR ENERGY |
| Shared Package | |
| ML20210E071 | List: |
| References | |
| 50-440-99-08, NUDOCS 9907280115 | |
| Download: ML20210E066 (2) | |
See also: IR 05000440/1999008
Text
4
'
July 22,1999
Mr. John K. Wood
Vice President - Nuclear
FirstEnergy Nuclear Operating Company
P.O. Box 97, A200
Perry, OH 44081
SUBJECT:
PERRY INSPECTION REPORT 50-440/99008(DRP)
Dear Mr. Wood:
On July 8,1999, the NRC completed a routine safety inspection at the Perry Nuclear Power
Plant. The enclosed report presents the results of that inspection.
During this inspection period, the overall conduct of activities at the Perry facility was
conservative and professional with a continuing focus on safety. Routine maintenance and
surveillance activities were properly controlled, coordinated, and performed per approved
procedures. Engineering department personnel provided good support to plant operations by
promptly addressing operability questions and emergent equipment issues. While your staff
aggressively pursued identifying and resolving higher than normal steam tunnel temperatures,
this condition was distracting to plant operators.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
Original signed hf
Thomas J. Kozak, Chief
Reactor Projects Branch 4
Docket No. 50-440
License No. NPF-58
Enclosure:
Inspection Report 50-440/99008(DRP)
k
See Attached Distribution
,
9907280115 990722
ADOCK 05000440
0
DOCUMENT NAME: G:\\PERR\\PER99008.DRP
To receive a co py of this document indicate in the box: "C' = Copy w/o attach /end "E" = Copy w/ attach /end "N" = No copy
OFFICE
Rlll:DRP
r/
Rlil:DRP _ lN
l
l
NAME
Lipa/kjc & / Kozak W
i
DATE
07M9 " 'N/
07/9 499
t
OFFICIAL RECORD COPY
~
.
.
J. Wood
-2-
cc w/ encl:
H. Hegrat, Manager, Regulatory Affairs
R. Schrauder, Director, Nuclear
Engineering Department
W. Kanda, General Manager
Nuclear Power Plant Department
N. Bonner, Director, Nuclear
Maintenance Department
H. Bergendahl, Director
Nuclear Services Department
State Liaison Officer, State of Ohio
R. Owen, Ohio Department of Health
C. Glazer, State of Ohio Public
4
Utilities Commission
Distribution:
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlll w/ encl
B. Clayton, Rill w/enci
SRI Perry w/enci
.
DRP w/ encl
DRS w/enct
Rlli PRR w/ encl
PUBLIC IE-01 w/enci
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
)