Forwards Safety Insp Rept 50-440/90-19 on 900905-21.No Violations Noted
ML20062A863
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/15/1990
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Lyster M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20062A867 List:
References
NUDOCS 9010230178
Download: ML20062A863 (2)


See also: IR 05000440/1990019

Text

i

,

zi -:

. k.

(C,h

n

8;

.

'.S

E

1:

.

.-

'

'

b

OCT 151930

h

.

.

Docket No. 50-440

-

g

The Cleveland Electric 111uminating

,

F

Company

.

.

ATTN: Mr. Michael D. Lyster

!

Vice President

i

Nuclear - Perry

r

-10 Center Road.

'

- Perry, OH. 44081

The Cleveland Electric illuminating

..

Company

Gentlemen:

4-

This-refers'to'.ths routine safety inspection conducted by Messrs.

M. A. Kunowski and N. Shah of this office on September 5-21, 1990, of

activities.at the Perry Nuclear Power Plant, Unit 1, authorized by NRC

.

Facility Operating License No. NPF-58, and to the discussion of our

'

findings with Mr. R. A. Stratman and other; of your staff on

' September 21, 1990.

The enclosed copy of our inspection report identifies areas examined

<

during the inspection.

Within these areae,, the inspection consisted

of.a selective examination of procedures'and representative records,

'<

observations, independent measurements, and interviews with personnel.

No viol'ations'of NRC requirements were identified by the inspectors

during the inspection; however, one violation was identified by your .

,

'

staff, as discussed in Section 3 of this report. Because this violation

satisfied the criteria of 10 CFR 2, Appendix C, Section V.G.1., a Notice

of: Violation was not. issued.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

.

of this letter and -the enclosed inspection report will be placed in the

NRC Public Document Room.

.

1

gob

i

q

L

C30117

d

s8A 18&M E8h8h

g

PDC

. . i

, - _

_.

-

_

.

,

L,

,

,

f,

.

'

>

.

o

.,; .

  • TheblevelandElectricIlluminating

2

OCT 151990-

Company

<

We will gladly discuss any questions you have concerning this inspection.

Sincerely

~

L. Robert reger, Chief

r

Reactor Programs Branch

'

Enclosure:

Inspection Report

No. 50-440/90019(DRSS)

'

cc w/ enclosure:

,

F. R. Stead, Director, Nuclear

F

Support Department

R. A. Stratman, General Manager,

Perry Nuclear Power f>1 ant

R. A. Newkirk, Manager;.

Licensing and Compliance Section

-

S. F. Kensicki, Director, Perry

Nuclear Engineering Dept.

H. Ray Caldwell, General

Superintendent Nuclear Operations

DCD/DCB(RIDS)

L

Licensing. Fee & Debt Collection

Branch

Resident Inspector, RIII

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert E. Owen, Ohio

,

j;

Department of Health

'

A. Grandjean, State of Ohio,

Public Utilities Commission

Clinton SRI

!

s

w

RIII

RII

RIII

_

_:y n

'.

@

Kunowski/jp

Schumacher

Lan bury

@Greger

'

10/p /90

tolstqo

,g

.

.

. -

m .