PY-CEI-NRR-2408, Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval
ML20195H905
ML20195G674
ML20212H584
PY-CEI-NRR-2405, Informs NRC That PNPP Staff Has Implemented Formal Industry Position on Severe Accident Mgt
PY-CEI-NRR-2377, Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1
PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999
ML20211A399
PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706
PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant
PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant
ML20196H964
ML20211A388
ML20209D593
ML20209E595
ML20210A644
PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates
PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to PNPP Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld
ML20210E066
ML17191B403
ML20210G841
PY-CEI-NRR-2417, Forwards NP0059-007, PNPP - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000
ML20210K633
ML20210Q798
PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for PNPP Covering Period of 990101-990630
PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826
ML20210Q583
PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready
ML20210S396
ML20210R786
ML20210Q842
PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl
PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2
ML20211Q691
ML20217A897
PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages
ML20212A837
ML20212D015
PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions
PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams
ML20212G581
ML20212G416
ML20212K927
ML20212J145
ML20217E711
ML18023A070
PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect
ML20217G920
PY-CEI-NRR-2438, Informs That DBNPS & PNPP Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl
PY-CEI-NRR-2378, Submits Withdrawal of Inservice Exam Relief Request PT-008
PY-CEI-NRR-2380, Requests Approval of Attached Repair Plan for Feedwater Nozzle to safe-end Weld N4C-KB.Proposed Weld Overlay Design & Installation Plan Details Included in Attachment 1. Attachment 2 Provides Applicable Preliminary Weld Procedure
ML20205H617
PY-CEI-NRR-2384, Provides Supplemental Info Re 990325 Request for Approval of Repair Plan for Feedwater Nozzle to safe-end Weld. Clarification Provided on Listed Three Items,Per 990329 Telcon with NRC
PY-CEI-NRR-2383, Withdraws Inservice Exam Relief Requests IR-036 & IR-041, Submitted in Licensee to Nrc.Relief Request IR-041 Is Being Clarified with Respect to Alternative Proposed
ML20206N336
PY-CEI-NRR-2386, Forwards Copy of Application Submitted to FERC Proposing Transfer of Jurisdictional Transmission Facilities of Firstenergy Corp Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing
PY-CEI-NRR-2387, Documents Telcon Held Between NRC Staff & Members of Perry Nuclear Power Plant Staff on 990406,re Safety Evaluation for License Amend 105
PY-CEI-NRR-2392, Forwards Diskette Containing PNPP Thermoluminescent Dosimeter Doses in Format Requested by Reg Guide 8.7.Without Diskette
PY-CEI-NRR-2371, Provides Suppl Response to Violations Noted in Insp Rept 50-440/98-18.Corrective Actions:Two Condition Rept Investigations Were Performed to Evaluate Issues Re Fire Protection Program & Addl Training Was Conducted
PY-CEI-NRR-2382, Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl
PY-CEI-NRR-2388, Forwards Annual Environ & Effluent Release Rept for Pnnp Unit 1 for 1998. PNPP Had No Liquid Effluent Discharges in 1998 & All Other Release Points Were Well Below Applicable Limits
05000440/LER-1999-002, Forwards LER 99-002-00, LCO 3.0.3 Entered Due to TS Bases Statement Interpretation. Action Occurred After RHR Pump Failed to Start.Plant at No Time Was in Condition Where Required Decay Heat Removal System Were Not Available
PY-CEI-NRR-2396, Provides post-examination Results of Weld Overlay Repair for FW Nozzle to safe-end Weld at Pnpp.Info Supplements Licensee 990325 & 0401 Ltrs Submitted to NRC That Requested Approval of Repair Plan for 1B13-N1C-KB FW Nozzle to safe-en
PY-CEI-NRR-2394, Forwards Application for Order & Conforming License Amend for Transfer of Interest in OL NPF-58 for Pnpp.Authorization of Ceic to Possess Dl 13.74% Undivided Ownership in PNPP, Requested
PY-CEI-NRR-2402, Notifies of Completion of Plant Core Shroud Insp in Accordance with GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs,
PY-CEI-NRR-2401, Forwards Changes to ERDS Data Point Library & Communication Survey for Perry Nuclear Power Plant.Changes Are Identified by Margin Rev Bars
ML20195E456
PY-CEI-NRR-2404, Submits Rept of Reduction in PCT Greater than 50 F Due to Implementation of Ge,Safr/Gestr LOCA Methodology for Fuel Cycle 8.Methodology Replaces Original LOCA Methodology
PY-CEI-NRR-2407, Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records
ML20195H905
ML20212H584
PY-CEI-NRR-2408, Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval
PY-CEI-NRR-2405, Informs NRC That PNPP Staff Has Implemented Formal Industry Position on Severe Accident Mgt
PY-CEI-NRR-2377, Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1
ML20211A399
PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999
PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant
PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant
PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706
ML20211A388
ML20210A644
PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates
PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to PNPP Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld
PY-CEI-NRR-2417, Forwards NP0059-007, PNPP - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000
PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready
PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for PNPP Covering Period of 990101-990630
PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826
ML20210S396
PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl
PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2
PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages
ML20212D015
PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions
PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams
ML20212G581
PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect
PY-CEI-NRR-2438, Informs That DBNPS & PNPP Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl
Please let this letter serve as a response to the Notice of Level III Violation received by Kenneth Wierman. As I believe you are aware, Mr. Wierman has admitted to the misconduct set -
forth and can'only suggest that the misconduct was precipitated by poorjudgment and inappropriate " corner-cutting". As you are aware, the situation has been corrected by Mr.
Wierman's dismissal from his position at the Perry Nuclear Power Plant and that therefore no further steps ne' d to be taken by Mr. Wierman to avoid further violations, and that, to the best of e
Mr. Wierman's knowledge, the Pe:Ty Nuclear Power Plant is now in compliance with training instruction procedures.
. I trust this response answers your inquiry.
Very truly yours, COOPER & FORBES
((
/
Glenn E. Forbes
)
GEF:kf:
i i
'cc:
Regional Administrator, Region III i
[.
NRC Resident Inspector, Perry Nuclear Power Plant L