ML20204E779
| ML20204E779 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/17/1999 |
| From: | Kozak T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Myers L CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML20204E784 | List: |
| References | |
| 50-440-99-01, 50-440-99-1, NUDOCS 9903250129 | |
| Download: ML20204E779 (2) | |
See also: IR 05000440/1999001
Text
- .
_.
__
__
_ . - _ _ . _ . _ . _
_
_ _ . . . _ _ _ . _
9
, .
i
March 17, 1999
Mr. Lew W. Myers
Vice President - Nuclear
FirstEnergy Nuclear Operating Company
P. O. Box 97, A200
Perry, OH 44081
SUBJECT:
PERRY INSPECTION REPORT 50-440/99001(DRP)
Dear Mr. Myers:
On February 24,1999, the NRC completed a routine safety inspection at your Perry Nuclear
Power Plant. The enclosed report presents the results of that inspection.
During this 6-week inspection period, your conduct of activities at the Perry facility was
generally characterized by safety-conscious operations, with continued effective suppression of
three minor fuel leaks. However, procedural adherence concerns continued to be identified.
Based on the results of this inspection, the NRC has determined that three violations of NRC
requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. If you contest the violation or severity level of these NCVs, you
should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington DC 20555-0001, with copies to the Regional Administrator, Region lil, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
l
DC 20555-0001.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
l
enclosure will be placed in the NRC Public Document Room.
Sincerely,
/s/ T. Kozak
9903250129 990317
Thomas J. Kozak, Chief
[
Am o
p
Reactor Projects Branch 4
l
Docket No. 50-440'
l
License No. NPF-58
Enclosure:
Inspection Report 50-440/99001(DRP)
DOCUMENT NAME: G:\\PERR\\PER99001.DRP
To receive a co py of this document, Indicate in the box: 'C' = Copy w/o attach /enci "E" = Copy w/ attach /enci "N' = No copy
l
l OFFICE
Rill:DRP
A/
Rlil:DRP
lA/
l
l
'
NAME
SDuPont/co7Eyb TKozak 7f_.-
DATE
03//7/99
03//7/99
i
OFFICIAL RECORD COPY
__
,
_
_ . . _ . .
._
._ __
_ _ .
_ . . _ .
_ _. . _.
__ __ _ . . _ _ .
<
.
.
L. Myers
-2-
cc w/ encl:
H. Hegrat, Manager, Regulatory Affairs
R. Schrauder, Director, Nuclear
Engineering Department
,
W. Kanda, General Manager
Nuclear Power Plant Department
N. Bonner, Director, Nuclear
Maintenance Department
H. Bergendahl, Director
' Nuclear Services Departmei t
Ohio State Liaison Office
R. Owen, Ohio Department of Health
.
C. Glazer, State of Ohio Public
Utilities Commission
Distribution:
RPC (E-Mail)
Project Mgr., NRR w/er.cl
J. Caldwell, Rlll w/enct
B. Clayton, Rlll w/enci
SRI Perry w/ encl
DRP w/ encl
DRS (2) w/encI
Alli PRR w/enci
PUBLIC IE-01 w/ enc!
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
\\
240160
,\\
l
l
l
l
'
,