Text
p
,
natoo
UNITED STATES
/o
'o
NUCLEAR REGULATORY COMMISSION
- '
3 y'
-/o
REGION lli
S \\
$
801 WARRENVILLE ROAD
I
LISLE. ILLINOIS 60532-4351
.
May 3, 1999
Mr. Lew W. Myers -
Vice President - Nuclear
FirstEnergy Nuclear Operating Company
P.O. Box 97, A200
- Perry, OH 44081
SUBJECT:
PERRY INSPECTION REPORT 50-440/99002(DRP)
Dear Mr. Myers:
- On April 6,1999, the NRC completed a routine safety inspection at the Perry Nuclear Power
Plant. The enclosed report presents the results of that inspection.
During this 6-week inspection period, the conduct of activities at the Perry facility was
characterized by generally safe and conservative plant operations. A procedural violation by an
operator during a response to a hydraulic control unit trouble alarm was immediately entered
into your corrective action program after which corrective actions were promptly implemented.
Operators were well-prepared for the refueling outage 7 plant shutdown and, while the
inspectors noted that operator three-way communication expectations were not consistently
- implemented, the minor equipment challenges encountered during the shutdown were
effectively handled.
.
Based on the results of this inspection, the NRC has determined that two violations of NRC
. requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
- subject inspection report. -If you contest the violation or severity level of these NCVs, you should
provide a response within 30 days of the date cf this inspection report, with the basis for your
denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC
-
20555-0001, with copies to the Regional Administrator, Region Ill, and the Director, Office of
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
.
9905100114 990503
ADOCK 05000440
G.
_
i
'
-.. - -
--
-D
.
..
.
.
.
L. Myers
-2-
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
/s/ T. J. Kozak
Thomas J. Kozak, Chief
Reactor Projects Branch 4
Docket No. 50-440
License No. NPF-58
Enclosure:
Inspection Report 50-440/99002(DRP)
cc w/ encl:
H. Hegrat, Manager, Regulatory Affairs
R. Schrauder,' Director, Nuclear
Engineering Department
W. Kanda, General Manager
Nuclear Power Plant Department
N. Bonner, Director, Nuclear
Maintenance Department
H. Bergendahl, Director
Nuclear Services Department
- State Liaison Officer, State of Ohio
R. Owen, Ohio Department of Health
C. Glazer, State of Ohio Public
Utilities Commission
DOCUMENT NAME: G:\\PERR\\PER99002.DRP
v. c.c.4. . c.y ., tai. ec
nt. 4.eie.t. in in, w c - c., etw .et.cv.aci e - e., ein .et.cu.aci
r . = c.,
OFFICE -
Rlli
d
'Kozak/mi%b
NAME
DATE
t5/03/99
OFFICIAL RECORD COPY
l
_
r.
-
.
..
L. Myers
-3
Distribution:
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlll w/enci
B. Clayton, Rlll w/ enc!
SRI Perry w/ enc!
DRP w/enci'
DRS w/enci
Rlli PRR w/ encl
PUBLIC IE-01 w/enci
Docket File w/enci
GREENS
IEO (E-Mail)
DOCDESK (E-Mail)
/!/
3nono
L-