Forwards Insp Rept 50-440/99-02 on 990225-0406.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy
ML20206G690
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/03/1999
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20206G694 List:
References
50-440-99-02, 50-440-99-2, NUDOCS 9905100114
Download: ML20206G690 (3)


See also: IR 05000440/1999002

Text

p

,

natoo UNITED STATES

  • '

/o

3 y'

'o NUCLEAR REGULATORY COMMISSION

REGION lli

-/o

S 801 WARRENVILLE ROAD

  • \ I

$

  1. LISLE. ILLINOIS 60532-4351

.

          • May 3, 1999

Mr. Lew W. Myers -

Vice President - Nuclear

FirstEnergy Nuclear Operating Company

P.O. Box 97, A200

Perry, OH 44081

SUBJECT: PERRY INSPECTION REPORT 50-440/99002(DRP)

Dear Mr. Myers:

- On April 6,1999, the NRC completed a routine safety inspection at the Perry Nuclear Power

Plant. The enclosed report presents the results of that inspection.

During this 6-week inspection period, the conduct of activities at the Perry facility was

characterized by generally safe and conservative plant operations. A procedural violation by an

operator during a response to a hydraulic control unit trouble alarm was immediately entered

into your corrective action program after which corrective actions were promptly implemented.

Operators were well-prepared for the refueling outage 7 plant shutdown and, while the

inspectors noted that operator three-way communication expectations were not consistently

- implemented, the minor equipment challenges encountered during the shutdown were

effectively handled. .

Based on the results of this inspection, the NRC has determined that two violations of NRC

. requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

- subject inspection report. -If you contest the violation or severity level of these NCVs, you should

provide a response within 30 days of the date cf this inspection report, with the basis for your

denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC

-

20555-0001, with copies to the Regional Administrator, Region Ill, and the Director, Office of

Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

.

9905100114 990503

PDR ADOCK 05000440

G. PDR _

i

'

. ..

-.._-_-___--_____-D

.

.

L. Myers -2-

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ T. J. Kozak

Thomas J. Kozak, Chief

Reactor Projects Branch 4

Docket No. 50-440

License No. NPF-58

Enclosure: Inspection Report 50-440/99002(DRP)

cc w/ encl: H. Hegrat, Manager, Regulatory Affairs

R. Schrauder,' Director, Nuclear

Engineering Department

W. Kanda, General Manager

Nuclear Power Plant Department

N. Bonner, Director, Nuclear

Maintenance Department

H. Bergendahl, Director

Nuclear Services Department

- State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, State of Ohio Public

Utilities Commission

DOCUMENT NAME: G:\PERR\PER99002.DRP  !

v. c.c.4. . c.y ., tai. ec nt. 4.eie.t. in in, w c - c., etw .et.cv.aci e - e., ein .et.cu.aci r . = c.,

OFFICE - Rlli d

NAME

'Kozak/mi%b

DATE t5/03/99

OFFICIAL RECORD COPY

l

_

r.

-

.

..

L. Myers -3

Distribution:

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rlll w/enci

B. Clayton, Rlll w/ enc!

SRI Perry w/ enc!

DRP w/enci'

DRS w/enci

Rlli PRR w/ encl

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

/

!/

3nono

L-