Forwards Insp Rept 50-440/99-07 on 990412-16.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observation of Activities in Progress
ML20206S538
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/12/1999
From: Shear G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20206S546 List:
References
50-440-99-07, 50-440-99-7, NUDOCS 9905210152
Download: ML20206S538 (3)


See also: IR 05000440/1999007

Text

!

.

.

May 12, 1999

Mr. Lew W. Myers

Vice President - Nuclear

I

FirstEnergy Nuclear Operating Company

P. O. Box 97, A200

Perry, OH 44081

SUBJECT:

NRC ROUTINE RADIATION PROTECTION INSPECTION REPORT

50-440/99007(DRS)

Dear Mr. Myers:

l

On April 16,1999, the NRC completed an inspection at your Perry Nuclear Power Plant.

a

The enclosed report presents the results of that inspection.

I

The inspection was an examination of activities conducted under your license as they relate to

radiation safety and to compliance with the Commission's rules and regulations and with the

i

conditions of your license. Within these areas, the inspection consisted of selective

l

'

I

examinations of procedures and representative records, interviews with personnel, and

observation of activities in progress. Specifically, the inspection focused on radiation protection

performance and oversight of refueling outage activities. In addition, we reviewed your

,

respiratory protection, internal dosimetry, and contract radiation protection technician training

)

,

'

and qualification programs and the circumstances surrounding a radiological waste transfer

'

which resulted in high radiation areas, that were not adequately posted.

'

l

We observed strong radiological oversight of work activities during the ongoing refueling outage.

)

Your staff effectively implemented radiological work plans and controls and monitored outage

j

dose. The radiation protection staff also performed thorough training and screening of contract

j

l

personnel, who were supplementing the station staff. In addition, we noted effective

j

implementation of the respiratory protection and internal dosimetry programs.

]

'

l

Based on the results of this inspection, the NRC has determined that one violation of NRC

g

requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),

i

consistent with Appendix C of the Enforcement Policy. This NCV is described in the subject

inspection report. if you contest the violation or severity level of this NCV, you should provide

a response within 30 days of the date of this inspection report, with the basis for your denial, to

i

the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington,

i

DC 20555-0001, with copies to the Regional Administrator, Region 3, and the Director, Office

of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

l

l

9905210152 990512

'

PDR

ADOCK 05000440

G

PDR

l

I


_

.

L. Myers

-2-

In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter, its

enclosure, and your response to this letter, if you should choose to respond, will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by Gary L. Shear

Gary L. Shear, Chief

Plant Support Branch

Docket N- 50-440

License No. NPF-58

Enclosure:

Inspection Report 50-440/99007(DRS)

cc w/ encl:

H. Hegrat, Manager, Regulatory Affairs

R. Schrauder, Director, Nuclear

Engineering Department

W. Kanda, General Manager

Nuclear Power Plant Department

N. Bonner, Director, Nuclear

Maintenance Department

H. Bergendahl, Director

Nuclear Services Department

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, State of Ohio Public

Utilities Commission

DOCUMENT NAME: G:\\DRS\\PER99007.WPD

To receive a copy of this document, indicate in the bor: "C* = Copy without attachrnent/ enclosure

  • E* = Cooy with attachment /pnclosure *N* = No copy

OFFICE

Rill

E Rlli

l6

Rlll

, , ld

l

NAME

SOrth:tb &G &

GShear (#3

TKozak 4/s

DATE

05////99

05/// /99

05/gJ99

OFFICIAL RECORD COPY

_

.

_ _ - _ _ _ _ _ .

e

J

L. Myers

3-

Distribution:

RPC (E-Mail)

c

Project Mgr., NRR w/encI

J. Caldwell, Rlli w/enci

B. Clayton, Rill w/enct

SRI Perry w/enci

DRP w/ enc!

DRS w/enci

Rlli PRR w/enci

-

PUBLIC eof'w/ encl

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

i

i

2100%

,

4