ML20129D405

From kanterella
Revision as of 19:25, 6 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-271/85-09 on 850225-0301.No Violation Noted
ML20129D405
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/07/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20129D409 List:
References
NUDOCS 8506060136
Download: ML20129D405 (2)


See also: IR 05000225/2003001

Text

(

a.

P.

MAY 0 71985

Docket No. 50-271 License No. DPR-28

Vermont Yankee Nuclear Power Corporation ,

ATTN: Mr.- Warren P. Murphy

V1ce President and Manager t

of Operations

RD 5, Box 169

Ferry Road-

Brattleboro', Vermont 05301

Gentlemen:

Subject: Inspection No. 50-271/85-09

' This refers to the safety inspection conducted by Mr. J. Hawxhurst of this

office on February 25 - March 1,1985 at your Vermont Yankee Plant of activities

authorized by NRC License No. DPR-28 and to the discussions of our findings

held by Mr. Hawxhurst with Mr. R. -J. Wanczyk of your staff at the conclusion of -

the inspection. '

Areas examined during this_ inspection are described in the NRC Region I

Inspection Report which is inclosed _with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were identified. '

"

In accordance with 10 CFR 2.790(a), a copy of this letter and.the enclosure '

will be. placed in the NRC Public Document Room unless you notify this office,-

by telephone,-within ten-days of the date of this. letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. . Such application must be consistent with-the requirements

of 10 CFR 2.790(b)(1). The telephone notification of your intent to request ,

withholdin;;, or any request for an extension of the 10-day period which you

_

believe necessary', should be made to the Supervisor, Files, Mail and Records,

.USNRC Region I, at (215) 337-5223.

The responses directed by this letter are not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork

Reduction Act-of 1980, PL 96-511.  ;

I

i-

.

-4

7

'

0FFICIAL RECORD COPY VERMONT YANKEE 85-09 - 0001.0.0

05,02,e5

44

--

g.

.

.

Vermont Yankee Nuclear Power 2

Corporation

-Your cooperation with us in this matter is appreciated.

Sincerely,

Original St". nod R7I

h- M C2

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Inspection Report.No. 50-271/85-09

cc w/ encl:

Mr. R. W. Caps, tick, Licensing Engineer

=Mr. W. F. Conway, President and_ Chief Executive Officer

Mr. J. P. Pelletier, Plant Manager

Mr. Donald Hunter, Vice President

Mr. Cort Richardson, Vermont Public

Interest Research Group, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

' State of New Hampshire

' State of Vermont

bcc w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encl)

Section Chief, DRP

RI:DR II RI

Haw t/ms R.Smitk er Bellany

5/v SG/85 5/)/85

5/J/85

0FFICIAL RECORD COPY VERMONT YANKEE 85-09 - 0002.0.0

05/02/85