Text
(
- a.
P.
MAY 0 71985
Docket No. 50-271
License No. DPR-28
Vermont Yankee Nuclear Power Corporation
,
ATTN:
Mr.- Warren P. Murphy
V1ce President and Manager
t
of Operations
RD 5, Box 169
Ferry Road-
Brattleboro', Vermont 05301
Gentlemen:
Subject:
Inspection No. 50-271/85-09
' This refers to the safety inspection conducted by Mr. J. Hawxhurst of this
office on February 25 - March 1,1985 at your Vermont Yankee Plant of activities
authorized by NRC License No. DPR-28 and to the discussions of our findings
held by Mr. Hawxhurst with Mr. R. -J. Wanczyk of your staff at the conclusion of -
the inspection.
'
Areas examined during this_ inspection are described in the NRC Region I
Inspection Report which is inclosed _with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were identified.
'
In accordance with 10 CFR 2.790(a), a copy of this letter and.the enclosure
"
will be. placed in the NRC Public Document Room unless you notify this office,-
'
by telephone,-within ten-days of the date of this. letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. . Such application must be consistent with-the requirements
of 10 CFR 2.790(b)(1). The telephone notification of your intent to request
_
,
withholdin;;, or any request for an extension of the 10-day period which you
believe necessary', should be made to the Supervisor, Files, Mail and Records,
.USNRC Region I, at (215) 337-5223.
The responses directed by this letter are not subject to the clearance
procedures of the Office of Management and Budget as required by the Paperwork
Reduction Act-of 1980, PL 96-511.
I
i-
.
-47
0FFICIAL RECORD COPY
VERMONT YANKEE 85-09 - 0001.0.0
'
44
05,02,e5
g.
--
.
.
Vermont Yankee Nuclear Power
2
Corporation
-Your cooperation with us in this matter is appreciated.
Sincerely,
Original St". nod R7I
h-
M C2
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
Enclosure: NRC Region I Inspection Report.No. 50-271/85-09
cc w/ encl:
Mr. R. W. Caps, tick, Licensing Engineer
=Mr. W. F. Conway, President and_ Chief Executive Officer
Mr. J. P. Pelletier, Plant Manager
Mr. Donald Hunter, Vice President
Mr. Cort Richardson, Vermont Public
Interest Research Group, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
' State of New Hampshire
' State of Vermont
bcc w/ encl:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encl)
Section Chief, DRP
RI:DR
II
RI
Haw
t/ms
R.Smitk
er
Bellany
5/v
SG/85
5/J/85
5/)/85
0FFICIAL RECORD COPY
VERMONT YANKEE 85-09 - 0002.0.0
05/02/85