IR 05000416/1985032

From kanterella
Revision as of 17:56, 5 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Insp Repts 50-416/85-32 & 50-417/85-06 on 850819-23.No Violation or Deviation Noted.Major Areas Inspected:Maint Welding,Nde & ASME Code Welding
ML20132C207
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 09/12/1985
From: Blake J, Crowley B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20132C193 List:
References
50-416-85-32, 50-417-85-06, 50-417-85-6, NUDOCS 8509260485
Download: ML20132C207 (13)


Text

-, , ~ . ~ . . . . - . . .. . - _ . . .~ .- . ~ . . _ - - . - _

- . - . . - . . _ _ _ ,. . - . . .-

'

@ Ofc UNITED STATES

,

o NUCLEAR REGULATORV COMMISSIOM

' ,r

o REGION 11 I

'

g j 101 MARIETTA STREET. *

't ATLANTA. GEORGI A 30323

)1 k..v ,/ ...

'

l

i Report Nos.: 50-416/85-32 and 50-417/85-06 II Licensee: Mississippi Power and Light Company j Jackson, MS 39205

!

'

Docket Nos.: 50-416 and 50-417 License Nos.: NPF-29 and CPPR-119 i

l Facility Name: Grand Gulf Inspection C a -te - August 19 - 23, 1985 l Inspecto : 9 t-  !

4 y Date Si ned Approved by:

'

/& 8f j J//.' Blake, Section Chief Date Signed 4 Engineering Branch

, Division of Reactor Safety l SUMMARY

i Scope: This routine, unannounced inspection entailed 36 inspector-hours on site

'

in the areas of maintenance welding and nondestructive examination (NDE) (Unit 1)  ;

and ASME Ccde Welding (Unit 2).

j Results: No violations or deviations were identified.

i f

i  !

!,

.

I.

i

.

i

} $

I

l 8509260485 850913

,

'

PDR ADOCK 05000416 O PDR

!

- - - . , ,- . . - - . . - . , . . - - . . - , . , - . , - , - - _ , , - _ . , - _ . _ . - . , - , , , . - . . . . . - . . . _ , , . , . - , - , - - - . - _ , , . - , , - - - .

. - = . _ . . .- . . .-

. .

REPORT DETAILS Persons Contacted Licensee Employees J. E. Cross, Grand Gulf Nuclear Station, General Manager C. R. Hutchinson, Manager, Plant Maintenance

  • R. F. Rogers, Technical Assistant to Station General Manager J. W. Yelverton, Manager, Plant Support S. F. Tanner, Manager, Nuclear Site Quality Assurance (QA)
  • L. F. Daughtery, Compliance Superintendent B. C. Lee, QA Supervisor - Audits J. M. Feil, Materials Science Supervisor - Nuclear Plant Engineering (NPE)

J. M. Kelley, Principal Quality Engineer - NPE R. S. Lewis, Material Science Engineer - NPE

K. R. Baker, Land Welding Engineer, Field Engineering R. A. Courtney, Senior Quality Representative A. J. Malone, Inservice Inspection (ISI) Coordinator

  • B. F. Oglesby, Maintenance Engineer
  • D. Little, QA Representative J. D. Bailey, Compliance Coordinator R. Scott, Licensing Other licensee employees contacted included construction craftsmen, engineers,
QC personnel, technicians, security force members, and office personne Other Organizations
  • J. F. Hudson, Project QA Manager, Bechtel i D. Watt, Lead Field Welding QC Engineer, Bechtel M. Shows, Lead Field Welding Engineer, Bechtel P. Collins, QA Engineer, Bechtel T. D. Kinnebrew, Assistant Lead Piping QC Engineer, Bechtel R. E. Green, Project Manager, Unitech Testing, In NRC Resident Inspectors R. C. Butcher, Senior Resident Inspector J. L. Caldwell, Resident Inspector
  • Attended exit interview i Exit Interview i

The inspection scope and findings were summarized on August 23, 1985, with those persons indicated in paragraph 1 above. The inspector described the areas inspected and discussed in detail the inspection findings. No dis-senting comments were received from the license _ _ _ _ _ - -

, , -_ . - _ _ .

. .

(0 pen) Inspector Folicwup Item 416/85-32-01, Issue of WPS Qualification Procedure, Paragraph S.b.(2).

The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio . Licensee Action on Previous Enforcement Matters This subject was not addressed in the insoectio . Unresolved Items Unresolved items were not identified during this inspectio i 5. Independent Inspection Effort (Unit 2)

l Housekeeping (548348), Material Identification and Control (429028) and Material Control (429408)

The inspector conducted a general inspection of the reactor and auxiliary buildings to observe activities such as housekeeping, material identifica-tion and control; material control, and storage. The inspector noted a number of motor operated valves in the auxiliary building where the protec-tive covering had been damaged or removed. The licensee took immediate action to inspect the protect'on and repair or replace coverings as necessar Within the areas examined,no violations or deviations were identified, f

6. Nuclear Welding (55050)(Unit 2)

The inspector examined the licensee's program for ASME Code welding as indicated below to determine whether applicable code and regulatory requirements were being me The applicable code is the ASME Boiler and Pressure Vessel Code,Section III,1974 Edition including Addenda through the Summer of 1974 Welder Performance Qualification i The inspector reviewed the qualification records and status records for the below listed welders relative to the field welds listed in

'

paragraph b., belo ,

P-154 P-636 Production Welding The inspector observed the below listed welds at the indicated stage of completion:

,

, - , ., - - r-

. . . - _ _ _ . .

. .

3 ISO . Weld Size Status M-23550 42 6" x .280" Observed intermediate layers and final weld l M-2558V 79,80,81 3" x .216" Observed root, interme-diate and final layer welding The welding was observed to determine whether:

-

Work was being conducted in accordance with a document which coordinates and sequences operations, references procedures, establishes hold points, and provides for production and inspec-tion approva j

-

Weld identification and location were as specified  ;

-

procedures, drawings, and other instructions were at the work station and readily available.

,

'

-

Welding procedures specification (WPS) assignment was in accordance with applicable code requirement Welding technique and sequence were specified and adhered t Welding filler materials were the. specified type and traceable to certification Weld joint geometry was in accordance with applicable procedure and was inspected.

'

-

Alignment of parts was as specifie Preheat and interpass temperatures were in accordance with procedure Electrodes were used in positions and with electrical charac-teristics specifie Shielding gas was in accordance with the welding procedur Welding equipment was in good conditio Interpass cleaning was in accordance with applicable procedures.

,

-

Temporary attachments were removed in accordance with applicable

!

procedures.

i

-

Gas purging, if specified, was in accordance with applicable

procedures.

! __ _

.- . _

.- . _ . .

_ - .. . . .-

I

,

. .

i i 4

'

i

I -

Process control system had provisions for repair I

-

Welders were qualifie )

i

-

No peening was performed on root and surface layer Inspection personnel were qualifie ,

Within the areas inspected, no violations or deviations were identified.

.

7. Radiographic Examination (57090)(Unit 2) '

The inspector examined the radiographic (RT) examination activities described below to determine whether applicable code and regulatory requirements were being met. See paragraph 5 above for the applicable code.

i

' The inspector observed in process RT inspection of weld 42 on drawing M-23550 to verify that:

-

Applicable instructions or travelers clearly specified the l procedure to be used and that a copy of the procedure was available for the inspection, j

-

Personnel performing the examinations were qualifie ! -

Required equipment and materials were available at the work i statio Specific areas, locations and extent of examination were clearly define .

'

!

.

-

Test attributes were specified and consistent with applicable

] procedures.

-

RT film was being processed in accordance with the applicable l procedure requirement '

) Completed RT film for weld 42 on drawing M-2355D was reviewed for

compliance with cede and procedure requirements in the areas of

]

-

Penetrameter type, size, placement, and sensitivity

,

-

Film density and density variation

, ,

-

Film identification

-

Film quality

-

Weld coverage

-

Defects

__ _ _ _ _ _ .

.__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ - - _ _ _ _ _ _ - _ _ _ _ _ _ _ - - - _ _ _ - _ _ _ - _ - _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ - - - - - _ _

o 1

. .

5 Personnel qualification / certification records for NDE personnel performing the RT of paragraph a. above and reviewing the RT film of paragraph b. were reviewe Within the areas inspected, no violations or deviations were identifie . Maintenance (Including Repairs and Replacements) Welding and Nondestructive Examination (NDE) (Unit 1)

The inspector examined the welding and NDE activities described below relative to maintenance (including repairs and replacements) to determine whether applicable code and regulatory requirements were being me In ge'eral, the governing code is ASME Boiler and Pressure Vessel Code (B&PV),

S2ction XI, 1977 Edition, 579 Addend In addition the following codes are applicable:

ASME B&PV Section III, 1974 Edition, S74 Addenda ASME B&PV Section V, 1974 Edition, S74 Addenda AWS Structural Welding Code 01.1, 1972 Edition l ANSI Standard B31.1, 1973 Edition Welding and NDE Program - General The inspector reviewed the welding and NDE program in general as defined by the following:

-

Operational QA Manual MPL-Topical-1, Revision 4 accepted by RII letter dated July 29, 1985

-

MP&L Mechanical Standard (MP&L-MS) - 118, Revision 0, " Welding, Inspection, and Nondestructive Examination Requirements for Pipe Supporting Components"

-

MP&L-MS-11A, Revision 0, " Welding, Inspection and Nondestructive Examination Requirements for Site Erected Piping"

-

MP&L-MS-11C, Revision 0, " Welding Inspection, Nondestructive Examination Requirements for Site Erected Structures"

-

MP&L Specification MP&L-M-183.1, Revision 5, "The Control of Special Processes Welding, Heat Treating, and Nondestructive Examination (Safety-Related)"

-

MP&L Specification MP&L-C-333 0, " Erection of Miscellaneous Steel"

-

Administrative Procedure 01-5-07-5, Revision 6, " Control of Specia. Processes"

_ . _- _ - _ - - _ _ - - _-

. .

b. Welding (55050 and 55100)

(1) Welding Material Control

(a) The inspector verified that the filler materials used for the i

welds observed (see paragraph (4) below) were the correct materials specified by the welding Procedure Specification j (WPS) and that in general filler materials specified on WPSs

'

were compatible with specified base material i

! (b) The inspector performed the following verifications related l to control and handling of welding material:

.

-

That the contractor has established procedures for i purchasing, receiving, storing, disbursing, and handling

'

of welding materials. The applicable procedures are:

MP&L Specification 183.1, Appendix 601, Revision 1,

"'4 eld Filler Material Control" Maintenance Section (MS) procedure 07-5-07-25, Revision 0, " Subcontractor Welding Filler Material Control" MS Procedure 07-5-06-701, Revision 1, " Procurement and Receipt of Welding Filler Material" MS Procedure 07-5-07-20, Revision 1, " Welding Filler Material Control - Safety-Related"

! -

That purchasing and receiving operations are conducted in accordance with applicable procedures. Purchasing

'

1 and receiving records for the welding materials listed below were reviewe That welding material storage and handling procedures contain requirements for environmental control and that actual practice follows these requirements. The weld material issue station was inspected and weld material control observed during observation of welding (see paragraph (4) below).

-

That there are effective procedures for maintaining identification of welding materials and that procedures are enforced. Identification contrcl was inspected during observation of welding (see paragraph (4) below).

-

That the welding material control system meets the

'

requirements for the most restrictive application and personnel involved were knowledgeable of the syste ,

j

..

-. - - .. _ _- - . - - - . _ _ _ . _ - -

1 .

.

i 7

-

That the method of disbursement of welding materials is effective and controlled in accordance with approved procedure That required ASME Code tests were performed on each lot

of welding materia The procurement, receiving inspection and material certification documentation were reviewed for the following welding materials used for the welds listed is paragraph (4) belo /32" ER705-2, Ht.432N0591 1/8" ER705-2, Ht.401K0151

'

3/32" E7018, Ht.41156181 1/8" E7018, Ht.10334 (Reviewed only CMTR and Receiving Records)

1/8" E7018. Ht.421W3141 3/32" E7018, Ht.402E5311 (Reviewed only CMTR and Receiving Records)

3/32" E7018, Ht.11174 (Reviewed only CMTR and Receiving Records)

(2) Welding Procedures The inspector reviewed procedures to verify that the licensee had established procedures for preparation, qualification, approval, certification and issue of welding procedure specifications (WPSs).

Although administrative procedures were available for issue and

.

I control of WPSs, and general special processes control procedures specified WPS qualification in accordance with ASME Section IX, a procedure covering details of WPS qualification had not been issued. The licensee stated that a procedure was in draf t form

'

and would be issued in the near future. Pending review of the procedure after issue Inspector Followup Item 416/85-32-01, Issue of WPS Qualification Procedure, is opene ! (3) Welder Performance Qualification I (a) The inspector verified that the licensee had established procedures for qualification of welders and welding eperator ; The applicable procedures are:

'

_

-

MS Procedure 07-5-07-15 Revision 0, " Welder Qualifica-tions and Instructions"

-

MP&L Specification 183.1, Appendix 201 Revision 0,

" Welding Standard Performance Specification" J -

MP&L Specification 183.1, Appendix 202, Revision 0,

" Welding Standard Performance Specification "

,

f

.-. , - _ . _ _ _ , . _ _ _ _ - . , , _ . - . . _ . . . , _ , . - - , , . -

. - - . . .

_ . _ _ . , _ _ , - _ . .

. _ . . . .- _ _ _ . _ - . _ _ _ _ _ _ - _ . . .___ ._ _ _ ._ . . _ _ _ _ _

'

i

,

.

8  !'

4 i i i

l (b) The inspector reviewed the system for maintaining welder l

qualification statu This process is covered in the t
procedures of paragraph (a) abov (c) The inspector reviewed the qualification records and status
records for the below listed welders relative to the field

welds listed in paragraph (4) belo M-58 M-19

, M-86 M-29

! M-85 M-24 i M-136 i

,

M-100 I j (4) Production Welding

The inspector observed in process welding'and/or completed welds I
on the following HVAC supports being installed by Design Change

] Package (DCP) 84/4063 and Maintenance Work Order (MWO) F52305:

-

!

1 Hanger AQ1X77G001H-29 j Hanger AQ1X77G001H-28 (Completed)

j Hanger AQ1X77G001H-30 (Completed)

i In addition, in process and completed weld records for the hanger j were reviewed.

l  !

! Since only a limited number of welds were in process to observe,

the inspector reviewed weld records for the following completed i j welds: '

i

'

Dwg/DCP/MWO Type Weld / Code Weld S_i,z e .

Dwg. M-B1348E Pipe-ASME 503 6" dia, i DCP 84/4069 Class 2 ~!

t i Dwg. M-B1348E Pipe-ASME

! DCP 84/4069 Class 2 504,505 3" dia.

and 506 l l l Dwg. M-A1346A Pipe-ASME 502C 6" di I DCP 84/0091 Class 1 505,506c MWO F 44387 Support-AWS Hanger AQ1ESIG001R20

,

!

Welds 501C, 502C, 504C, 506C, 503, 514, 505, 507,

,

.

508, 509, 510, j

.

511, and 512

-- .- ---- .. .- - - - ---

.__ _ _ _ . __ _ . . .

. .

1

!

The welding was observed and the records reviewed to determine

,

,

whether:

-

Work was conducted in accordance with a document which I

'

coordinates and sequences operations, references procedures, establishes hold points, and provides for production and inspection approval.

-

Weld identification and location were as specifie i

'

-

Procedures, drawings, and other instructions were at the work station and readily available.

) -

WPS assignment was in accordance with applicable code

,

requirement ,

?

-

Welding technique and sequence were specified and adhered t l

-

Welding filler materials were the specified type and traceable l

!

to certification Weld joint geometry was in accordance with applicable proce- i dure and was inspecte Alignment of parts was as specified.

,

-

Preheat and interpass temperatures were in accordance with procedure Electrodes were used in positions and with electrical characteristics specifie Shielding gas was in accordance with the welding procedur !

i -

Welding equipment was.in good conditio Interpass cleaning was in accordance with applicable procedures.

i -

Temporary attachments were removed in accordance with applicable procedures.

1 -

Gas purging, if speci fied, was used in accordance with applicable procedure Process control system had provisions for repairs.

!

-

Welders were qualified.

-

No peening performed on root and surface layers.

i i

- _ - - _ - _ _ _ _ _ _ _ - _ _ _ _ - - . _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ - _ _ _ _

< . .

,

,

c. NDE (57050, 57060 and 57070)

(1) Visual (VT) Examination f

, The inspector examined the VT activities described below relative to repair and replacement activitie (a) The following procedures were reviewed to determine whether the procedures had been approved and issued in accordance with the QA program:

NDE Standard No. M-VE-1, Revision 1, " Visual Inspection Standard"

NDE Standard No. M-VE-2, Revision 1, " Visual"
l i In addition, the procedures were reviewed to determine whether the following parameters were specified and

,

controlled in accordance with applicable requirements:

,

-

Method - direct visual, remote visual or translucent i visual l -

Application - hydrostatic testing, fabrication procedure,

visual examination of welds, leak testing, etc.

1 -

How visual examination is to be performed

-

Type of surface condition available i -

Method of surface preparation, if any

-

Whether direct or remote viewing is used

-

Special illumination, instruments, or equipment to be ,

used, if any

-

Sequence of performing, examination, when applicable

.

-

Data to be tabulated, if any I

! -

Acceptance criteria are specified consistent with the applicable code and specific contract requirement

-

Reporting requirements (b) VT inspection records for the completed welds listed in

i paragraph 8.b.(4) were reviewed for compliance with applicable procedures.

,

(c) VT qualification records for the examiner who inspected the i welds listed in paragraph 8.b.(4) were reviewed.

i

!

!

l . .__ _ _ _ _ _ , _ _ _ _ _ . _ _ __ __ . . _ _ _ , -_

_ _ _ ,

_ _ _ . . _ .

.. .

(2) Liquid Penetrant (PT) Examination The inspector examined the PT activities described below relative to repair and replacement activitie (a) NDE Standard M-PT-SR-1,2, Revision 3, " Liquid Penetrant (Solvent Removable)" was reviewed to determine whether the procedure had been approved and issued in accordance with the QA progra In addition, the procedure was reviewed to determine whether the following parameters were specified and controlled in accordance with applicable requirements:

-

Method consistent with applicable codes

-

Specification of brand names and types of penetrant materials

-

Specification of limits of sulfur and total halogens for materials

-

Pre-examination surface preparation and cleaning

-

Minimum drying time following surface cleaning

-

Penetrant application and penetration time

-

Temperature requirements

-

Solvent removal

-

Method and time of surface drying prior to developing

-

Type of developer and method of application

-

Examination technique

-

Time' interval for interpretation

-

Required lighting

-

Technique for evaluation

-

Acceptance standards

-

Reporting requirements

-

Requalification Requirements (b) Personnel qualification / certification records for NDE personnel who performed the PT inspections of the welds listed in paragraph (c) below were reviewe (c) The inspector reviewed PT inspection records for the welds listed below for compliance with procedure requirement Dwg. M-A1346A Welds 502C, 503, 505 and 506C DCP 84/0091 (d) Certification records for penetrant materials used to PT the welds listed in paragraph (c) above were reviewe (3) Magnetic Particle (MT) Examination The following procedures were reviewed to determine whether the procedures had been approved and issued in accordance with the QA program:

-_. _. _ ,

. . . ,

NDE Standard M-MT P-1, 2, Revision 1, " Magnetic Particle (Prod) Dry Method" NDE Standard M-MT-C-1,2, Revision 0, " Magnetic Particle (Coil) Dry Method" NDE Standard M-MT-Y-1,2, Revision 1, " Magnetic Particle (Yoke) Dry Method"

In addition, the procedures were reviewed to determine whether the following parameters were specified and controlled in accordance with applicable requirements:

I

-

Method - Continuous j -

Surface Preparation

-

Particle Contrast

-

Surface Temperature

-

Light Intensity '

,

-

Coverage

-

Prod Spacing

! -

Magnetizing Current

-

Yoke Pole Spacing

-

Acceptance criteria are specified consistent with the applicable code and specific contract requirement '

Within the areas inspected, no violations or deviations were identifie . Inspector Followup Items (92701)(Unit 1)

-

'

(Closed) Inspector Followup Item 416/84-44-01, Initiation Date of First 120-Month. Program for Inservice Testing of Pumps and Valves. The start of the first 120-month interval has been established as the commercial 1 operation date.

I J

f l

as-

, - ,- - - - - - . - -- -- _ 7m, y _ _ _ >m. w -

y 4-,-m,m-- -

m -