IR 05000416/1987037

From kanterella
Jump to navigation Jump to search
Insp Rept 50-416/87-37 on 871207-11.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/ Prevention & Followup on Previously Identified Insp Items
ML20149E308
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/13/1988
From: Conlon T, Harris J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20149E298 List:
References
50-416-87-37, NUDOCS 8802110005
Download: ML20149E308 (11)


Text

- - - --

-+ ~ > , .

'

' *

natio . ~ UNITED STATES M ~

o. . ' NUCLEAR REGULATORY COMMISSION

$ REGION il

~

p~

' j' 101 MARIETTA STREET, ,j 2 ATLANTA, O EORGI A 30323.- '

V...../ I I

l Report No.: 50-416/87-37  ;

.)

Licensee: System Energy Resources,_In :

Jackson, MS 39205 i i

Docket No.: 50-416 License No.: NPF-29 l Facility Name: Grand Gulf I i

Inspection Conducted: December 7-11, 1987 l Inspecto_r: c Wl #9L / - /3 - 99 '

J. R. Harris '

Date Signed Approved b c>? ?z/ / - / 3-Ff I T. E. Conlon, Section Chief Date Signed- l Engineering Branch l Division of Reactor Safety l

)

SUMMARY Scope: This routine, announced inspection was in the areas of Fire Protection / -

Prevention and follow-up on previously identified inspection item Results: No violations or deviations were identifie i i

i l

,

i I  !

l l I

!

I

!

I i

i 8802110005 000115

'

PDR ADOCK 05000416 O PDR

!

.

,

J l \

l l

u

.

n

'

x-

C

, _ ,

,. , , s, , o %

g : + ,i' ': p_

o 4~

y g- 4 y

-

f ( ,p' o-

'

.4 q w ,,

w '

- 4 REPORT DETAILS =

.a  ;. , -

cy '!

,

a ,

-(~ ' License ~e Persons Contacted ,, #

-

%' '

Brown, Assistant Fire Protection Coordinator

~

  • * Cumbest,= Supervisor, Fire Protection '

s y,;^. ;4N l 3.,

^' '"4 y

' '

~

  • L. Daughtcry, Compliance Supervisor
  • B. Hicks, Assistant Fire Protection Coordinator

$;' (s j

-

  • V. Holmberg, Fire' Protection Coordinator - 4 V4

, .*W.~Hughey, Licensing ~ Engineer , 4

- ~

  • C. Hutchinson, General Manager- A, {
  • L. Moulder, Operaticos, Superintendent

"S. Tanner, Manager, Quality Services J , -

"G. Vining, Technical Syge'rintence,1t

'

p ,

.

, q t

w i

'.i / - f, 0ther licensee emplofees corttacted included engineers,wtechniciansg '

operators, mechanics, gec,urity force methews, and office ptersonne .?*

,

'

s

"

8 J u a * Attended exit-interview + $ 3 4 n - 4 Exit Interview .-

' ^ 4 ~ t

  1. 't

,

>

The inspection scope and' findings were summarized on D6cember 11,,2987( ' ' , i with those persons indicated in Parpgraph 1 abov The inspectdro "

-

described the areas inspected" and discus 5e/ in Ata114 tN inspection findings. No dissenting comments were rewived frtm the' licensee. The licensee did not identify as proprietary any of t% materials provided to . 7 or reviewed by the inspector during this insyct Rh"n ( ,-

m + .-

fy '  ; Licensee Action on Previous Enforcement Mattlers a 1'# , ; l a ; ;y , (Closed) Violation (416/86-24-01), Failure cc Repjrt Inoperative Hr3 ,

Hydrant. A surveillance conducted on 06cmbdr.26, 1985, found Valve F053 closed. This closed valve' resu'tiil in"FirF kydrant 00[4 #

being inoperative since no water was availaM e to 7.:.e hydran '

Incident Report No. 85-12-11, reviewed this diseJleaancy and found that  ;

the system met the provisions of Tecnaical Specification 3.7.6.1, Fire Suppression Water System with the valve closed, and thus, this, discrepancy was not ' reported to the NP.L. However, the licensae failed to consider Technical Spect',1 cation 3.7.6, Yard Fir,e Hydra ~nts ,

anti Hydrant Hose Houses, 9Mch required 3this hydrant to be in servic The failure to report this 111tt:nsee identified * item wai. ,

identifiedasviolation(416/86-24-01),'F}iluretoReportInoperative~

Fire Hydran "

a ~

,

During this inspection, the inspector verified that procedures have been revised to reflect proper methods for verifying valves open' and -

that instructions are in place to alers operators when valves are not i

'

operabl The inspector also verifiec.4 that valves were oparable r

/ f6 ,

2 ,-

,,

. _ - , ,

_ _ - _ _ _ _ _

'

"

..

.,

'

[

t

.

during an inspection of outside yard valves and reviewed recent

'

surveillances on valves. _ These. inspections verified that all-valves were operable. This item is closed, (Closed) Violation (416/86-24-02), Inadequate Fire Watch Progra Technical Specification.3.7.7 requires that all_ fire rated assemblies ,

(walls, . f.loor/ ceiling s , cable tray-enclosures and other _ fire #

barriers) - separating safety-related _ portions of redundant systems

,

important to fsafe shutdown within a fire area, and _ all sealing devices in~ fire rated assembly penetrations (fire dampers, cable and piping _ penetration seals and ventilation seals) shall be operabl If one or more of the above fire rated _ assemblies and/or sealing devices are inoperable, an hourly fire watch patrol is ~to be

-

established. During the. inspection conducted August 11-15, 1986, the inspector selected six rooms, OC214, OC215, OC302, OC402, OC702, and ,

1D302 which~were included in the fire watch program. The times'that

~

the roving fire watch entered these rooms on August 8 and 13 on the night shift were reviewe This review . disclosed that the watch missed two hours for OC214, four hours for OC215, three hours for OC302, and two hours for 0C702. On August 13, the watch entered room

.i OC402 each hour, but missed one hour for 0C214, one hour for DC215, three hours for GC302, two hours for OC702, and four hours for 1030 This was identified as Violation (416/86-24-02), Inadequate Fire Watch Program,  !

Corrective action taken for this item included specific verbal instructions to fire watch personnel, written instructions issued to

,

' fire watch personnel, and fire watch check sheets have been revised to include documentation of the time the fire watch was conducte During this inspection, the inspector reviewed fire watch

,

surveillance records to verify that fire watch requirements are being met. This item is close , Fire Protection Prevention Program (64704) Fire Prevention / Administrative Control Procedures

'

l The inspector reviewed the following Fire Prevention / Administrative l

,

Procedures:

Procedure N Title 06-OP-SP64-A-004 Fire Protection Systems Valve Stroke Test I

06-0P-SP64-A-005 Diesel Driven Fire Pump A Functional Test

,

06-OP-SP04-A-006 Diesel Driven Fire Pump B Functions 1 Test

!

06-0P-SP64-A-007 Motor Driven Fire Pump Functional Test 06-OP-SP64-W-0001 Fire Pump Weekly Operability Test c

i

!

- - . - - __ .

.. _

t

'

.-

,; [

I (cont'd) Procedure N Title 06-OP-SP64-W-0045- Weekly Fire Door Check-06-0P-SP64-R-0022 Computer and Control Room Halon' System'

Functional Test 06-0P-SP64-A-0010- Fire Suporession Water System Loop Flow Test 06-0P-SP64-M-011 Fire Protection System Monthly Valve Lineup ;

Verification .

!

06-ME-SP64-R-0047-01 Fire Penetration Seal Visual Test 01-S-07-9 Housekeeping I 10-S-03-03 Fire Prevention Control of Ignition Sources 10-S-03-04 Fire Prevention Control of Combustible Materials ,

t 10-S-03-05 Fire Protection Procedure Fire Investigation 10-S-03-06 Salvage Operations f

The above surveillance procedures were reviewed to determine if the various test outlines and inspection instructions adequately implement the surveillance requirement of the plant's Fire Protection l Technical Specification In addition, these procedures were i reviewed to determine if the inspection and test instructions: 6

'

followed general industry fire protection practices, NRC fire protection program guidelines and the guidelines of the National Fire Protection Association (NFPA) fire codes. Based on this review, it appears that the above procedures are satisfactor ,

I Fire Protection System Surveillance Inspections and Test i The inspector reviewed the following surveillance inspection and test records for the dates indicated:

'

,

(1) Fire Protection System Valve Stroke Test. 06-0P-SP-64-A-0004 Annual test conducted between Septenber 5 and November 26, 1986, [

and September 20, 1987

'

(2) Diesel Driven Fire Pump A Fa ctional Test, 06-0P-SP64-A-005 f j Annual test conducted October 7, 1986, and September 30, 1987 (3) Diesel Driven Fire Pump B Functional Test, 06-0P-SP64-A-006 l

!

i- Annual test conducted October 9, 1986, and September 30, 1987

!

t

' i

, . _ .

.

(4) Weekly Fire Pump Test 06-0P-SP64-W001

Weekly tests conducted August 17, August 24, and August 31, 1987; September 7, September 14, September 21, and September 23, 1987 (retest); September 28, 1987; October 5, October 19, and October 26, 1987; and November 2, 1987 (5) Motor Driven Fire Pump Functional Test, 06-0P-SP64-A-007 Annual test conducted November 16, 1986, and November 15, 1987 (6) Loop Fica Test, 06-0P-SP64-A-0010 Three year test conducted September 28, 1986 (7) Computer Room Halon Check, 06-0P-SP64-R-022 18 test conducted February 2,1987 (8) Monthly Fire Protection System Valve Lineup Test, 06-0P-SP64-M-011 Monthly tests conducted March 6, 1987; May 6, 1987; June 6, 1987; July 8, 1987; August 11, 1987; September 10, 1987; and November 10, 1987 (9) Fire Penetrition Seal Visual Inspection, 06-ME-SP64-R-0047 Eighteen 'aonth inspections conducted September 11, 1985, and Mtrch 11, 1987 (10) Weekly Fire Door Check, 06-0P-SP64-W-0045 Weekly tests conducted September 21, 1987; September 28, 1987; November 5, 1987; November 12, 1987; November 19, 1987; and November 26, 1987 The surveillar.ce test record date and testing frequency associated with the above fire protection system surveillance tests / inspections were found to be satisfactory with regard to meeting the requirements of the plant's Fire Protection Technical Specifications, Fire Protection Audit The most recent audit reports of the fire protection program were reviewe These audits were:

(1) Triennial Fire Protection Audit - TFPA-2, March 10-23,1987 (2) Annual and 24-Month Fire Protection Audit - MFPP-86-01 of March 3-14 and 25, 1986 i

I

'

.

-

(3) QA Audit Report 86-0025 - March 11, 1986, Auxiliary Building Fire Detector Functional Test, March 11, 1986 (4) QA Audit Report 87-003 Unit 1, Fire Detection Instrumentation, January 12 to February 4, 1987 These audits identified several fire protection program discrepancies, and recomended several program improvements. The licensee has either implemented the corrective actions associated with these audit findings or a scheduled date for completion of the corrective actions has been established. The licensee appears to be taking the appropriate corrective actions on these audit finding e. Fire Brigade (1) Organization The fire brigade is composed of approximately 75 personnel from the Operations staff. The brigade leader is normally one of the licensed nuclear operators and the remaining fire brigade members are composed of t.nlicensed nuclear operator Radwaste personnel are not normally part of the brigade unless they are qualifie The inspector reviewed the list of qualified personnel for emergency worker and fire brigade through November 24, 1987, and verified that sufficient qualified personnel were assigned to each shift to meet the provisions of Technical Specification 6. (2) Training The inspector reviewed the training and drill records for eight brigade leaders and twenty brigade members for the four quarters of 1987. These records indicated that each leader and member had received an annual medical review, attended the required training, and participated in the required number of drill The inspector also verified that a fire brigade drill had been conducted for each quarter of 1987 for each shif (3) Fire Brigade Equipment The inspector performed an inspection of the fire brigade equipment, consisting of fire hoses, nozzles, tools, and miscellaneous equipment stored at the fire brigade equipment response locations located on 148 and 189 elevations of the Control Building; 119,139 and 166 elevations of the Auxiliary Building; and 133 elevation of the Diesel Generator Bu4' 'n A total of 22 sets of turnout gear (coats, boots, helmets, etc.)

and 22 sets of self-contained breathing apparatus, are stored at the fire brigade equipment response location Additional equipment plus a 1,000 gpm Ford / Pierce fire apparatus pumper

.

with 450' of 2 " hose, 500' of 1%" hose, and miscellaneous equipment is stored in the fire equipment building located south of the Auxiliary Buildin Based on this inspection, the designated fire brigade equipment stored at the fire brigade equipment response / locations appeared to be properly maintained and stored in a ready conditio (4) Fire Brigade Drill During this inspection, the inspector witnessed an unannounced fire brigade drill . The drill fire scenario was a simulated fire in electrical penetration room 1A318 of the Auxiliary Building at elevation 13 Fourteen fire brigade members and two health physics personnel responded to the pending fire emergency. The brigade members assembled outside electrical penetration Room 1A318 in full protective fire fighting turnout clothing and self-contained breathing apparatus. An initial size-up of the fire condition was made by the brigade leader. The fire attack utilized halon extinguishers for backup. The fire was placed under control in eight minute The fire brigade utilized adequate manual firefighting methods and reacted to the fire drill scenario in an effective and efficient manner, f. Fire Watch Program The licensee has a hourly roving fire watch program consisting of nine people covering approximately 70 rooms in plant area This program is required to meet the action statement of Technical Specification Section 3. This action statement requires all fire rated assemblies (including walls, floors, ceilings, cable tray enclosures, and other fire barriers) separating safety-related areas or separating portions of redundant systems important to safe shutdown within a fire area, and all sealing devices in fire rated assembly penetrations (fire doors, fire dampers, cable and piping penetration seals and ventilation seals) to be operabl A fire watch check sheet is provided to indicate the rooms or plant 3reas which are required to be included in the fire watch progri Building, room numbers, and plant elevations are added to the list cs inoperative fire barriers are identifie The inspector selected 11 rooms, OC707, 07706, OC614, OC608, OC604, IA447, 1A445, 1A401, 1A222, 1A221, and 1A207, which were included in the fire watch program. The times that the roving fire watch entered these rooms were reviewed. Review of these records indicated that proper fire watch surveillances were being me ._ __ _ -- _ _ - . - - - - - - - - - - _ _--

,

,1

'

-

}; y -

.

'

/

hw ,

-

7=

n

,u- File:Em9rgepcy Plans (Fire Fighting' Strategies)

m The ' inspector. reviewed the following fire ~ fighting strategies (pre-fire plans):

A-01 ; Corridors, and Passages Auxiliary Building, Personne Ha:ards'-. Energized. Equipment A-06 High Pressure Core' Spray _ System, Room 1A109, Area Elevation 903 A-11- RHR C Pump Room 1A118, Auxiliary Building Elevation 93 A-10 Piping Penetration Room 1A116, Auxiliary Building Elevation 93 A-26 'CRD Hydraulic Control Area, Room 1A311 and A1313 Containment Elevation 139 A-30 Main Steam Tunnel Containment Ventilation Equipment Room 1A402 and Containment Exhaust Filter and Vent Room 1A40B A-46 Cable Chase Room 1A539 Auxiliary Building Elevation _185 A-49 HVAC Unit Area, Room 1A606 Auxiliary Building Elevation -243 A-50 Electrical Penetration Room 1A318, Auxiliary Building

' Area 9, Elevation 139 A-52 Electrical Penetration Room 1A320, Area 10, Auxiliary Building Elevation 139 C-05 Remote Shutdown Panel Room OC20A, Area 25, Control Building Elevation 111 C-07 Switchgear and Battery Room, Room OC20A Area 25, Control Building Elevation 111 C-12 Lower Cable Spreading Room Area 25A and 258, Room 1 Hand J, Control Building Elevation 148 C-16 Upper Cable Spreading Room, Area 25A, Room OC702, Control Building Elevation 189 C-18 Motor Generator Room and Electrical Space, Area 25A, Room OC707 and OC709, Control Building Elevation 190 CG-01 Division I Diesel Generator Room, Area 12, Rooms 1D302, ID310, and 10401, Diesel Generator Builoins Elevation 133

- _ _ _ _ _ _ _ _ _ _ _ - _ - - _ _ - - - . ,

sf

~

l

'

.

.

p' ' 1 1g is

DG-03 Diesel Generator- Room, . Area 12, Room 10303, .10308, and

'10402, Diesel Generator Building, Elevation 133 DG-04 HPCS Diesel Generator Room Area 12, Rooms 10304,'10306, and '

.

10401, Diesel Generator Building Elevation 133-SSW-01 SSW Pump House and Valve Room,. Room IM110 - SSW A Pump House Room and Room IM112 - SSW A Valve Room, Elevation 133 SSW-02 SSW Pump House and Valve Room, Room 2M110 - SSW B Pump House Room and Room 2M112 - SSW B Valve Room, Elevation 133 Based on this review, the inspector determined that the above fire fighting strategies adequately addressed' the fire hazards in the .

area, the type of sxtinguishers: to be utilized, the . direction of '

attack, systems in the room / area to be managed in order to reduce fire damage, heat sensitive equipment in the room / area and specific fire brigade duties with regard to smoke control and salvage, Plant Tours (1) Outside Fire Protection The inspector verified that the two water storage tanks contained sufficient water to meet the requirements of the Technical Specifications and that all . three fire pumps were in service. The ten ton CO2 system tank was inspected and found to be 80% full of CO2 at a pressure of 300 ps; and the main supply i valve locked in the open position. Fire hydrants and Equipment House Nos. 0008, 0009, 0010, D019, D020, 0021, 0023, 0024, and 0025 were inspected. Each equipment house was found to contain 250' of 2h" and 100' of ih" fire hose, two 2h" and two lh" nozzles, two hydrant wrenches, four spanners, one fire axe, one pry bar, a handlight and hose gaskets. These fire protection ,

features appeared to be adequately maintaine (2) General Plant Tour l A tour was made by the inspector of general plant area The -

following safe shutdown related plant areas and their related '

fire protection features were inspected:  ;

-

Cable Spreading Room OC402

-

Computer Room 0C403  :

-

Instrument Motor Generator Room OC407

-

Cable Spreading Room OC702

,

-

Division I Switchgear Room OC202 [

_ . - - , _ . , _ _ _

. - _

,4

-

Division II Switchgear Room OC215

-

Division III Switchgear Room OC213

-

Piping Penetration Room 1A220

-

Electric Switchgear Room 1A221

-

Electric Penetration Room 1A308

-

Electric Penetration Room 1A309

-

Containment Ventilation Equipment Room 1A405 The inspector visually inspected the fire / smoke detection capabilities, the manual firefighting equipment (i .e. , portable extinguishers, hose stations, etc.) and the fire barrier walls associated with the above plant area In addition, the inspector visually inspected the sprinkler protection associated with the above referenced room Based on the visual inspection, it appears that the fire protection features associated with the above plant areas were properly maintained and fully functiona The plant tour also verified the licensee's implementation of the Fire Prevention Administrative Procedures. The control of combustibles and flammable materials, liquids and gases and the general housekeeping was found to be good in the areas inspected. A welding operation was observed on Elevation 148 of the computer and control panel room of the Control Roo An approved "Hot Work" perutit had been issued for the welding operation and the operations and Fire Prevention / Protection practices met the licensee's Fire Prevention Procedure requirement Within the areas inspected, no violations or deviations were identifie . Inspector Follow-up Items (IFI) (Closed) Inspector Follow-up Item 416/86-24-03, Installation of Additional Fire Detector During this inspection the inspector reviewed records for the installation of the fire detectors and verified that they were installed during a plant tou This item is close .,

C

b. (Closed) Inspector Followup Item 416/85-16-04, Inadequate Numoer of 8-Hour Emergency Lighting Unit The inspector reviewed records documenting installation of the emergency lighting and verified that the emergency lightirg was installed during a plant tour.

l l

l

_ _ - _ _ _ _ _ _ _ _ _ ~