ML20140H673

From kanterella
Revision as of 10:49, 27 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-458/86-14 on 860317-20.Insp Reviewed Conditions & Actions Leading to Div II Diesel Generator Operability Failure on 860317.Enforcement Conference Scheduled for 860410
ML20140H673
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/27/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20140H677 List:
References
NUDOCS 8604040165
Download: ML20140H673 (2)


See also: IR 05000458/1986014

Text

, . .

.

r ,

4 , ,

. m c

-

,

. y

.

.

In Reply Refer To: ggR 27 @ <

Docket: 50-458/86-14

>

v

.

Gulf States Utilities

'ATTNi William J. Cahill, Jr. R

, Senior Vice President

. . River Bend Nuclear Group

_

C .

..P.,0. Box 2951

'}' Beaumont, Texas 77704

'

Ge'ntlemen:  ;

I ~

This, refers to tte inspection conducted by Mr. D. D; Chamberlain of this office-

~

A , during the period March 17-20, 1986, of activities authorized by NRC Operating

n- License NPF-47 for River Bend Station, and to the discussion of our findings

, with you and other members of your staff at the conclusion of the inspection.

This' inspection was a special inspection conducted to review the conditions and

actions-which led to a Division II diesel generator operability failure on-

March 17, 1986, and to review the planned corrective actions.

"

Within this area, the inspection consisted of selective examination of procedures

'

-and representative records, interviews with personnel, and observations by the

7

. inspector. .These findings are documented in the enclosed inspection' report.

During this inspection, it was.found that certain of your activities may be in

' violation of NRC requirements. _ Paragraph 2 of the enclosed inspection report

provides details of these potential violations. 'As discussed in a telephonc

.J conversation on March 27, 1986, with you, we have scheduled an enforcement

-conference in our office on April 10, 1986, to discuss these potential violations,

.the reasons for occurrence, and your corrective actions. We shall also discuss

-

.any potential enforcementJoptions available to the NRC, if appropriate.

' Should you have any questions 'concerning this inspection, we will be pleased to

.fdiscuss them with you.

'

"'Ykh,& T:wi r;

-

\U. C. G u :: e

<

J. E. Gagliardo, Chief

-

Reactor Projects Branch

'

f Enclosure:

'E Appendix - NRC Inspection Report

,

. 50-458/86-14 -

cc'w/ enclosure: (cont.onnextpage) ,

.RIV R RPB DRSPk E0

DDCh mb riain/gm - J )Jaudon JEGag ia do EHJohnson DAPowers

3/ 86 3/p/86 ,$ /11/;B6 3/g/86 ,3 /p[/86

8604040165 860327 i >

PDR

G

ADOCK 05000458

PDR

\ i l

i _

.

Gulf States Utilities Company -2-

cc w/ enclosure:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • RPB DRSP
  • Resident Inspector R. D. Martin, RA
  • Section Chief (RPB/A) *D. Weiss, LFlia (AR-2015)
  • MIS System *RSB
  • RSTS Operator D. A. Powers, E0
  • R&SPB *RIV File
  • w/766