ML20137S456

From kanterella
Revision as of 09:31, 16 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls
ML20137S456
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/11/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
References
NUDOCS 8602180054
Download: ML20137S456 (2)


Text

-

l f .X.

. .a FEB 11199G Docket No. 50-461 Illinois Power Company ATTN: Mr. W. C. Gerstner Executive Vice President -

500 South 27th Street Decatur, IL 62525 Gentlemen:

Enclosed is a copy of the revised (IRC Form 398. This revised form requires that all information be completed in total with each new, renewal, upgrade, multi-unit, and reapplication license submittal. Applicants requesting a renewal and reapplication will also need to indicate the additional training received since the last application under Item 15.. Please note that the training section will no longer be cumulative. Other changes are detailed in Enclosure 2. Enclosure '3 is a set of instructions for the completion of all items on the NRC Form 398.

Please ensure that all applications for licenses received after April 1,1986, are submitted on this revised form. On that date, the NRC Operator Licensing Tracking System will be modified to reflect these changes, and submittals using the previous form will not be accepted.

Additional copies of the form can be obtained from Vivian Miller, U. S. Nuclear Regulatory Conunission, Document Management Branch, Mail Stop W-548, Washington, DC 20555.

A meeting will be held with all Region III licensees in late March or early April to discuss this and other operator licensing matters. You will be notified of the details of this meeting at a later date.

If you have any questions regarding these changes, please call our office.

" ORIGINAL SIGNED BY LUIS A. REYES 8602180054 B60211 PDR ADOCK 05000461 Luis A. Reyes, Chief V PDR Operations Branch

Enclosures:

As stated See Attached Distribution RIII RIII RII Roxworthy/mab illen eye 02/11/86 ct l, gf MA

NY Illinois Power Company 2 eg

' ~g y ~, ,,c,a u

' Distribution

~

cc w/ enclosures:

R. Schaller,-Training Department-cc w/o enclosures:

1DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Richard Hubbard Gary N.'-Wright, Manager Nuclear Facility Safety Jean Foy, Prairie Alliance Mark Jason, Assistant-

. Attorney General, Environmental. Control Division H. S. Taylor, Quality Assurance

' Division l

..