MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
'
- t AVERAGE DAILY UNir POWER LEVEL
_=
- v DOCKET NO. 50-250 UNIT Turkey Point #3 DATE 6- 15-84 COMPLETED sy _ N.W. Grant TELEPilONE (305) 552-3675' MONTH May, 1984 .
DAY AVERAGE DAILY POWER LEVEL DAY IMWe Net)
' AVERAGE DAILY POWER LEVEL
-(MWe-Neil 1
If 62 2' 684 18
~
3 g9 688 4 -
683 20
'S 680 6
22 674 7
23 672 s 667 24 9 666 23 I 670 26 _
~
83 676 3, ,
l'~
28 679 .
575 682 13 ,,
g4 673 679 30 668 672 Is 3' 666 ,
16 9
INSTRUCTIONS h[,i
$'8 d'ilY unit Pwer lesel in MWe.Nei for each day in the repiiriing in.inth. Ciinipuie to he n are . 3sy3 jeF288FOgggggo PDR I& d b
- ,--,e.- - . , - __ _ _
i~
w OPERATING DATA REPORT DOCKET NO. 50-250 DATE _6-15-84 COMPLETED BY .N U TELEPHONE (305) Gra"h675 bbz-OPERATING STATUS Turkey Point Unit #3 Notes
- 1. Unit Name:
May _1984
- 2. Reportins Period: Unit #3 operated at full
- 3. Liesased Thermal Power (MWt): 2.200 power except as indicated in
- 4. Nameplate Rating (Gross MWe): 760 the " unit shutdowns and power
- 5. Design Electrical Rating (Net MWe): 693 reductions" report.
- 6. Maximum Dependable Capacity (Gross MWe): 700
- 7. Maximum Dependable Capacity (Net MWe): 696
- 8. If Changes Occu:in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr to Date Cmnulatise
- 11. Hours in Reporting Period 744 1.647 inn;719 A
- 12. Number Of Hours Reactor Was Critical 460.9 2.814.5 69.120.7
- 13. Resetor Reserve Shutdown Hours 0 0 844.4
- 14. Hows Generator On-Line 4bb.5 2,728.5 68,650.5 0 0 121.8
- 15. Unit Reserve Shutdown 1(ours
- 16. Gross Thermal Energy Generated (MWH) 9945815 5,807.169 141:295.761 -
- 17. Gross Electrical Energy Genersted (MWH) 320,610 1.877.7/0 45.088.335 303,554_ ,_, 1,775,974 42,688,991
- 18. Net Electrical Energy Generated (MWH)'
- 19. Unit Service Factor 61.2 _ 74.8 68.2
- 20. Unit Availability Factor 61.2 74.8 68.3
- 21. Unit Capacity Factor (Using MDC Net) -
61.3 73.1 6L4
- 22. Unit Capacity Factor (Using DER Net) 58.9 70.3 61.2
- 23. Unit Forced Outage Rate 38.8 19.0 6.0
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test Status (Prior to Comrr.ercial Operation): Forecast Aci ined INITIAL CRITICALITY ._ _
INITIAL ELECTRICITY COMMERCIAL OPER ATION _
. (9/77)
DOCKET NO.
50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point #3 DATE 6-15-84 REPORT MONTH !!ay, 1984 N DW N1 Gmnt TELEPHONE (305) 552-3675
,- !? 3 Ik Licensee [*, *L Cause & Corrective
. No. Date i 3g F, .g s & Event p mO Acthe to
$. E j gji.g Report
12 840426 S 288.5 B 1 ZZ ZZZZZZ Unit #3 taken off line for Unit #4 safeguards test, snubber inspection and steam generator.feedwater nozzle inspections.
4 4
e i
i I 2 3 4 1 F: Forced Reason: Method: Exhibit G-Instructions .
S. Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data
- B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-i D-Regulatory Restriction 9-Other (Explain) 0161) ,
- E. Operator Training & Ucense Examination ,
F-Administrative 5 G Ope.atismal Frror (F xplain) x _ /. 4o Asewca..e# Eshibit I - Same Souree l't/77) Ilother (Euplain) i 1
, .- ~ - --. - - . . . . - - - - - - - . -. , . - - - -
i.
f- .
SUMMARY
OF OPERATING XPERIENCE DOCKET.NO. _ 50-250 UNIT Turkey Point Unit #3 DATE June 15, 1984 COMPLETED BY N.W. Grant
~
TELEPHONE REPORT HONTH Ma y. 1984 Unit #3 operated at essentially full power except as indicated in the
."Unit Shutdowns and Power, Reduction" Report.
Inspection and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company conmitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
5
AVERAGE DAILY UNIT POWER LEVEL 50-251 DOCKET NO.
UNIT Turkey Point Unit C DATE 6-15-84 COMPLETED sy N.W. Grant TELEPilONE (305) f,52-3675'
. MONTH May, 1984 DAY AVERACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) -(MWe-Neti I' -
g7 _
~
2 gg
~
3 19 .-
~
~
4 20 5 33
~
~
6 22 7 33
~
8 24
~
9 25
~
~
~
10 -
26 11 37
~~ ~
~
12 28
'13 -
39 _
~
~
14 30 15 _ 3;
~
16 I
INSTRUCTIONS
- On this forenat. list the aserage daily unit power leselin MWeSes for each day in the reporting month. Compute to the nearest whiite omgawatt.
(9/771
---.-n-- ..---
I OPERATING DATA REPORT I I
DOCKET NO.
DATE 6-15-84 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 '
OPERATING STATUS ,
. i Turkey Point Unit d4 Notes
- 1. Unit Name:
May 1984
- 2. Reporting Period: Unit #4 prepared to return !
- 3. Licensed Thermal Power (MWt): 2.200 to power fol. lowing refueling 760
- 4. Nameplate Rating (Gross MWe): and schedaled maintenance.
693 ,
- 5. Design Electrical Rating (Net MWe):
. 6. Maximum Dependable Capacity (Gross MWe): 700 7.~ Maximum Dependable Capacity (Net MWe): 666
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since I.ast Report, Give Reasons: ,
[
- 9. Power Level To Which Restricted,If Any (Net MWe): -
- 10. Reasons For Restrictions.lf Any: l t
This Month Yr to.Date Omnulative l
- 11. Hours in Reporting Period 744 3,647 94;444
- 12. Number Of Hours Reactor Was Critical 52.1 1,368.7 66,00/.3
- 13. Reactor Resem Shutdown Hours 0 0 16i;_6
- 14. Hours Generator On.Line 3.7 1,273 63.741.1 0 0 31.2 ,
- 15. Unit Reserve Shutdown 1(ours
- 16. Gross Thermal Energy Generated (MWH) 240,328 3.002.229 144 7an A7n -
- 17. Gross Electrical Energy Generated (MWH) 530 ,. 898.915 42 820:217
-3,916 843,253 40,547.312
- 18. Net Electrical Energy Generated (MWH)'
- 19. Unit Service Factor .5 34.9 67.5
- 20. Unit Availability Factor .5 34.9 67.5 :
- 21. Unit Capacity Factor (Using MDC Net) .
0 34.7 66.3 }
22.' Unit Capacity Factor (Using DER Net) 0 33.4 62.0 !
- 23. Unit Forced Outage Rate 0 21.1 4.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units la Test Status (Prior ta Commercial Operation): Forecast Achined INITIAL CRITICALITY . _ _ _
INITIAL ELECTRICITY COMMERCIAL OPER ATION ,,_
l
. (9/771 j
DOCRET NO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS ,
Turkey Point #4 UNIT NAME DATE _fi_15-R4 ColWLE1ED BY ' N.W. Grant
. REPORT MONTH MaY, 1984 (305) 552-3675
-TELEPHONE
. "i -
- , - 3? 3f; hYk Licensee . Eg !"L Cause & Corrective
. No. Date g 3g jg5 Event u '2 83 Action to
- cE 0 Preven; Recurrence c5 E jdi.g f' 6
07 840308 S 740.3 C 4 RC FUELXX Unit #4 remained off line for refueling and scheduled maintenance.
I i
I j
t i i 2 3 4
- F: Forced Reason: Method: Exhibit G -Instructions 4
S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee 3-Automatic Scram. Event Report (LE R) File (NUREG-
- C Refueling D-Regulatory Restriction @-O her(Explain) 0161) .
E-Operator Training & Ucense Examination, p ,
F-Administrative 5 G-Operational Error (F splain) 4. Ao4. A.smuc.v..c/ Exhibit I - Same Source (9/77) Il Other (Explain)
SUMMARY
OF~ OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point-Unit #4
.DATE June 15, 1984 COMPLETED BY. N.W. Grant TELEPHONE (305)552-3675 REPORT MONTH May, 1984 Unit 4 prepared to return to power following refueling and scheduled maintenance outage'. ,
Inspections.and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.