ML17354A435

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr
ML17354A435
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/28/1997
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-062, L-97-62, NUDOCS 9703190187
Download: ML17354A435 (14)


Text

CATEGORY j.

REGULATO INFORMATION DISTRIBUTION TEM <RIDS)

ACCESSION NBR 9703190187 DOC. DATE: 97/02/28 NOTARIZED: NO DOCKET 4 FACIL: 50-250 T ur k e!3 P o i n t P 1 t Unit an i 3 i F 1 o r i d a Power a n d L i g h t C 05000250 50~25 1 Turkey Point Planti Unit 4i Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORRi J. E. Florida Power 5 Light Co.

HOVEYz R. J. Florida Power Kc Light Co.

RECIP. NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1997 %or Turkey Pointi Units 3 5 4. W/970311 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAUs R 1 INTERNAL: AEOD/SPD/RRAB 1 1 LE CENTER 0 NRR/DRPM/PECB 1 1 OC An"A RGN2 1 1 EXTERNAL: LITCO BRYCE. J H 1 1 NOAC NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

~ PP'L MAR 11 1997 L-97-062 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of .Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the February 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hove Vice Presi ent Turkey Point Plant JEK Attachments cc: L. A. Reyes, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9703l90187 970228 05000250 ADGCK 'DR R PDR an FPL Group company

I I V

L M

~f:'a

AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50 - 250 UNIT Turkey Point I/3 DATE Mar 03, 1997 COMPLETED BY J. E. Knorr TELEPHONE I305) 246 - 6757 MONTH February, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/97 724 02/02/97 724 02/03/97 723 02/04/97 720 02/05/97 717 02/06/97 712 02/07/97 709 02/08/97 710 02/09/97 711 02/10/97 7'I 2 02/11/97 713 02/12/97 721 02/13/97 712 02/14/97 712 02/15/97 713 02/16/97 712 02/17/97 716 02/18/97 724 02/19/97 721 02/20/97 717 02/21/97 715 02/22/97 716 02/23/97 712 02/24/97 710 02/25/97 711 02/26/97 712 02/27/97 691 02/28/97 657

OPE NG DATA REPORT DOCKET NO 50 - 250 DATE 03/03/97 PREPARED BY J. E. Knorr TELEPHONE (305) 246-6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: February, 1997
3. LICENSED THERMAL POWER (MWT): 2300
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 720
6. MAXIMUMDEPENDABLE CAPACITY (GROSS MWE): 726
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 693
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 672.0 1416.0 212457.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1393.7 145622.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON. LINE 672.0 1386.4 143574.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1536751 3118149 300219352
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 500952 1019126 96476575
18. NET ELECTRICAL ENERGY GENERATED (MWH) 478689 972714 91364088
19. UNIT SERVICE FACTOR 100.0 97.9 67.6
20. UNIT AVAILABILITYFACTOR 100.0 97.9 67.6
21. CAPACITY FACTOR ( USING MDC NET ) 102.8 99.1 64.9
22. CAPACITY FACTOR ( USING DER NET ) 98.9 95.4 62.4
23. UNIT FORCED OUTAGE RATE 0.0 2.4 10.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

Refueling Outage Scheduled for March

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50- 250 UNIT NAME: Turkey Point 4 3 DATE: Mar 10, 1997 COMPLETED BY: J. E. Knorr REPORT MONTH FEBRUARY 1997 TELEPHONE: (305) 2466757 No. Date Duration Reason Method of Licensee System Component Cause and Corrective Type Action to (Hours) Shutting Event Code Code 2 Down Report If 4 Prevent Recurrence:

5 Reactor 00001038 02/27/97 S 0.0 N/A HH VALVEX Procedural response to feedwater heater bypass valve opening

1. F Forced 2. A - Equipment Failure (Explain) 3. 1- Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preperation of Data Entry C - Refueling 3- Automatic Scram Sheets Licensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREGZ161)

E - Operator Training JJcense Examination 5- Load Reduction 5.

F - Administraitive 9- Other (Explain) Exibit I - Same Source G - Operational Error (Explain)

H - Other (Explain)

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 operated at essentially 100% reactor power for the month of February. Power was reduced to 85% for a short period on February 27 to respond to a feedwater fluctuation. Late on February 28, the unit was reduced in power to approximately 60%

in anticipation of the beginning of a refueling outage.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50- 251 UNIT NAME: Turkey Point // 4 DATE: Mar 05, 1997 COMPLETED BY: J. E. Knorr REPORT MONTH FEBRUARY 1997 TELEPHONE: (305) 2466757 Method of Licensee Cause and Corrective Date Type Duration (Hours)

Reason Shutting Event 0'ystemCode Component Code Action to 2 Down Report Prevent Recurrence:

4 5 Reactor 00001034 , 02/02/97 S 0.0 NIA HB VALVEX Turbine Valve Test 00001035 02/03I97 2.4 NIA VALVEX Reduced power to repair turbine valve controls 00001036 02/04/97 S 0.0 N/A HF PIP EXX Water Box Cleaning 00001037 02/03/97 F 60 NIA EA INSTRU Synch Switch Repair

1. F Forced 2. A - Equipment Failure (Explain) 3. 1- Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preperation of Data Entry C - Refueling 3- Automatic Scram Sheets Licensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161)

E - Operator Training .License Examination 5- Load Reduction F - Administraitive 9- Other (Explain) Exibit I - Same Source G - Operational Error (Explain)

H - Other (Explain)

AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50 - 251 UNIT Turkey Point //4 DATE Mar 03, 1997 COMPLETED BY J. E. Knorr TELEPHONE {305) 246 - 6757 MONTH February, 1997 DAY AVERAGE DAILY POWER LEVEL

{MWe-Net) 02/01/97 726 02/02/97 726 02/03/97 164 02/04/97 458 02/05/97 718 02/06/97 716 02/07/97 713 02/08/97 714 02/09/97 714 02/10/97 715 02/11/97 722 02/12/97 727 02/13/97 722 02/14/97 715 02/15/97 714 02/16/97 715 02/17/97 720 02/18/97 725 02/19/97 722 02/20/97 719 02/21/97 719 02/22/97 718 02/23/97 714 02/24/97

'13 02/25/97 714 02/26/97 715 02/27/97 716 02/28/97 715

OPE NG DATA REPORT DOCKET NO 50 - 251 DATE 03/05/97 PREPARED BY J. E. Knorr TELEPHONE (305) 246.6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: February, 1997
3. LICENSED THERMAL POWER (MWT): 2300
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 720
6. MAXIMUMDEPENDABLE CAPACITY (GROSS MWE): 726
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 693 B. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD - CUMULATIVE

11. HOURS IN REPORT PERIOD: 672.0 1416.0 206189.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 141 6.0 141501.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 663.6 1407.6 137205.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1485945 3194275 290734551
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 484900 1048155 93017056
18. NET ELECTRICAL ENERGY GENERATED (MWH) 462944 1001660 88104011
19. UNIT SERVICE FACTOR 98.8 99.4 66.5
20. UNIT AVAILABILITYFACTOR 98.8 99.4 66.8
21. CAPACITY FACTOR ( USING MDC NET ) 99.4 102.1 64.5
22. CAPACITY FACTOR ( USING DER NET ) 95.7 98.2 62.0
23. UNIT FORCED OUTAGE RATE 1.2 0.6 9.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT:

DATE:

COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 began the month of February operating at essentially 100% reactor power. On February 2, power was reduced to approximately 40% in anticipation of a turbine valve test. Part of the test was unsuccessful due to a servo malfunction and the decision was made to take the unit to Mode 2 on February 3. The unit was returned to the line later on February 3 reaching 100 0 power late on February 4. The unit operated at essentially 100% power for the remainder of the month.