Text

PRXORXTY 1, (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 P 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION I for j

for Turkey Point Units

SUBJECT:

Monthly 'ng repts Sept 1995 0 3 & 4. 9510 2 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR I ENCL SIZE:

'TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTE 01 1 1 NRR/DRPM/PECB 1 1 RGN 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RZDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWPN 5D8 (415-2083) TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

I I IGCT12 1ggg L-95-281 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the September 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

ry ly yours, I?e; T. F. Plunke Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant PDR R .

')n n 9510200055'50930

.,PDR,..

ADOCK an FPL Group company 05000250

/ g

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/95 654 9/02/95 645 9/03/95 316 9/04/95 0 9/05/95 0 9/06/95 0 9/07/95 0 9/08/95 0 9/09/95 0 9/10/95 0 9/11/95 0 9/12/95 0 9/13/95 0 9/14/95 0 9/15/95 0 9/16/95 0 9/17/95 0 9/18/95 0 9/19/95 0 9/20/95 0 9/21/95 0 9/22/95 0 9/23/95 0 9/24/95 0 9/25/95 0 9/26/95 0 9/27/95 0 9/28/95 0 9/29/95 0 9/30/95 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No Date Type Duration (Hours)

Reason Yethod of Reactor'icensee Shutting Event Reports Code'omponent System code'ause 4 Corrective Action co Prevent Recurrence Down 05 950904 647 ' N/A N/A N/A Refueling F Forced Reason Yethod Exhibit G Instructions Exhibit 1 - Same Source S Scheduled A - Equipment Failure 1 - Nanual for Preparation of Data B - )4aintenance or Test 2 - Nanual Scram Entry Sheets Licensee C - Refueling 3 - Auto~tie Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 4 5 << Load Reduction License Examination 9 Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 10/ 9/95 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD:SEPTEMBER 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET  : 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHL~ 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 6551 200048.6
12. NUMBER OF HOURS REACTOR 72.5 5868.2 134846.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 72.2 5863.2 132911. 8
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121.8
17. GROSS ELECTRICAL ENERGY GENERATED (MWHJ

~283 ~7Y2794 YKE88728 40977 4113062 88874526

18. NET ELECTRICAL ENERGY GENERATED (MWH) 37690 3918024 84112451
19. UNIT SERVZCE FACTOR 10.0 89.5 66.4
20. UNIT AVAILABILITYFA 10.0 89.5 66.5
21. CAPACITY FACTOR (USING MD 7.9 89.8 64.1
22. CAPACITY FACTOR (USING DER NET) 7.6 86.3 60.7
23. UNIT FORCED OUTAGE RATE 0.0 0.7 10.9
24. SHUTDOWNS SCHEDULED OVER CONTINUED REFUELING OUTAGE UNTIL EARLY OCTOBER
25. ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: OCT. 8, 95

~ ~

DOCKET NO.

UNXT:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 operated at essentially 100% reactor power until shut down for the Cycle 15 refueling on September 4. The unit remained shut down for the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 9/01/95 669 9/02/95 672 9/03/95 674 9/04/95 671 9/05/95 671 9/06/95 675 9/07/95 674 9/08/95 675 9/09/95 677 9/10/95 676 9/11/95 676 9/12/95 676 9/13/95 674 9/14/95 674 9/15/95 675 9/16/95 676 9/17/95 673 9/18/95 670 9/19/95 672 9/20/95 673 9/21/95 673 9/22/95 675 9/23/95 675 9/24/95 673 9/25/95 671 9/26/95 673 9/27/95 671 9/28/95 675 9/29/95 679 9/30/95 677

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Types Duration (Hours)

Reason Yethod of shutting Licensee Event Reports code'omponent System Code'ause s Corrective Action to Prevent Recurrence Down Reactor N/A 3

F - Forced Reason Yethod Exhibit G - Instructions Exhibit 1 - Same Source S Scheduled A - Equipment Failure 1 - Yanual for preparation of Data B - Naintenance or Test 2 Nanual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 Continued (NUREG-0161)

E - Operator Training 4 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/ 9/95 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD:SEPTEMBER 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITE~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 6551 193780.0
12. NUMBER OF HOURS REACTOR 720.0 6429. 1 131276.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 720.0 6420.6 127184.2
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2 I~s287 T3AE252 2EFE72961
17. GROSS ELECTRICAL ENERGY GENERATED (MWH7 509174 4518750 85967400
18. NET ELECTRICAL ENERGY GENERATED (MWH) 485159 4305824 81385410
19. UNIT SERVICE FACTOR 100.0 98.0 65.6
20. UNIT AVAILABILITYFA 100.0 98.0 65.9
21. CAPACITY FACTOR (USING MD 101.2 98.7 64.1
22. CAPACITY FACTOR (USING DER NET) 97.2 94.8 60.6
23. UNIT FORCED OUTAGE RATE 0.0 2.0 10.5
24. SHUTDOWNS SCHEDULED OVER MARCH 1996

)5. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

~ lw h ~

~ DOCKET NO.

UNIT:

DATE:

COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100% reactor power for the month of September.

4 ~,

~ P