ML17354A526

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr
ML17354A526
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/31/1997
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-152, NUDOCS 9706180235
Download: ML17354A526 (17)


Text

~

CATEGORY 1 REGULATOiINFORMATION DISTRIBUTION iTEM (RIDE)

ACCESSION NBR:9706180235 DOC.DATE: 97/05/31 NOTARIZED: NO , DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power=and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH,NQNt, AUTHOR AFFILIATION MOWREYFA.L. Florida Florida Power  !'ight Power a Light Co.

Co.

. HOVEY,R.J.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for May 1997 for Turkey Point Units 3  !; 4.W/970612 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL J SIZE:  ! 0 TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 01 1 1 NRR/DRPM/PECB 1 1 AD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EKT. 415-2053) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

-0 JUg ] 21997 L-97-152 10 CFR $ 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the May 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. The cumulative data supplied in this report reflects corrections due to errors discovered in the computer program which generates and maintains the cumulative data. An additional table is supplied, listing the corrected cumulative data for each month of 1997.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: L. A. Reyes, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9706i80235 970531 PDR R

ADOCK 05000250 PDR an FPL Group company

I

."g J

l(

fr I'

AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50-250 UNIT Turkey Point P3 DATE Jun 03, 1997 COMPLETED BY C. I Mowrey TELEPHONE (305) 246-6204 MONTH May, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/97 708 05/02/97 705 05/03/97 703 05/04/97 706 05/05/97 708 05/06/97 723 05/07/97 722 05/08/97 714 05/09/97 712 05/10/97 712 05/11/97 709 05/12/97 711 05/13/97 710 05/14/97 711 05/15/97 705 05/16/97 707 05/17/97 710 05/18/97 709 05/19/97 706 05/20/97 702 05/21/97 ~ 697 05/22/97 696 05/23/97 699 05/24/97 709 05/25/97 710 05/26/97 708 05/27/97 703 05/28/97 701 05/29/97 706 05/30/97 722 05/31/97 713

~ ~

OPERATING DATA REPORT DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE June 9 1997 COMPLETED BY C. L. Mowre TELEPHONE 305 246%204 REPORTING PERIOD ~Ma 1997 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 2573.4 148024.9
4. Number of Hours Generator Was On Une 744.0 2517.1 145904.2
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 526954.0 1704248.0 92864454.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turke Point 53 DATE: June 4, 1997 COMPLETED BY:

TELEPHONE: (305) 246-6204 REPORT MONTH MAY 1997 Ho. Date Duration Reason~ Method Licensee Code'omponent System Cause 6 Corrective Action to (Hours) of Event Codes Prevent Recurrence Shutting Reports Down Reactor~

F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (HVREG-0161)

E - Operator Training & 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DMI'.'ki DOCKET NO. 50-250 June 4 1997, I'ATE:

CDMPLETIIDBY. ~CL PELEPEDEB:

REPORT MONTH MAY 1997 Unit 3 operated at essentially 100% power for the month.

AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point rir4 DATE Jun 03, 1997 COMPLETED BY C. L Mowrey TfLEPHONE (305) 246- 6204 MONTH May, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe.Net) 05/01/97 705 05/02/97 701 05/03/97 700 05/04/97 702 05/05/97 708 05/06/97 715 05/07/97 716 05/08/97 716 05/09/97 713 05/10/97 708 05/11/97 705 05/12/97 707 05/13/97 708 05/14/97 709 05/15/97 705 05/16/97 704 05/17/97 708 05/18/97 708 05/19/97 703 05/20/97 700 05/21/97 697 05/22/97 694 05/23/97 696 05/24/97 704 05/25/97 706 05/26/97 704 05/27/97 699 05/28/97 698 05/29/97 715 05/30/97 722 05/31/97 722

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE June 9 1997 COMPLETED BY C. L. Mowre TELEPHONE 305 246%204 REPORTING PERIOD ~Me 1997 (Month/Year)

,1. Design Electrical Rating (MWe-Net) 720

2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 3549.0 145002.0
4. Number of Hours Generator Was On Line 744.0 3535.8 140701.8
5. Unit Reserve Shutdown Hours 0.0 0.0 , 577.2 I
6. Net Electrical Energy (MWH) 525556.0 2506278.0 90555356.0

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turke Point 84 DATE: June 4, 1997 TELEPHONE'0-251 COMPLETED BY:

(305) 246-6204 REPORT MONTH MAY 1997 No. Date Type Duration (Hours)

Reason~ Method of Event Code'omponent System Code'ause & Corrective Action to prevent Recurrence Reactor'icensee Shutting Reports Dawn N/A P - Porced Reason Method Exhibit G - instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Pailure 1 - Manual for preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) Pile D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training & 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point P4 DATE: June 4 1997 COMPLETE BY: C, L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH MAY 1997 Unit 4 operated at essentially 100% power for the month.

~ .

Operating Data Report Errata

~

0 eratin Data Re ort for1997

- Line"3.-¹ of Hours Rx Critical Corrected Corrected Unit 3 Cumulative Unit 4 Cumulative December, 1996 145451.5 December, 1996 141453.0 Janua 146173.2 Janua 142197.0 Februa 146845.2 Februa 142869.0 March 146893.9 March 143613.0 A ril 147280.9 A ril- 144258.0 Ma 148024.9 145002.0 Line 4 - ¹ Hours Generator On-Line Corrected Corrected Unit 3 Cumulative Unit 4 Cumulative December, 1996 143387.1 December, 1996 137166.0 Janua 144101.5 Janua 137910.0, Februa 144773.5 Februa 138573.6 March 144821.5 March 139317.6 A ril 145160.2 A ril 139957.8 145904.2 140701.8 Line 6- Net MWH Generated Corrected Corrected Unit 3 Cumulative Unit 4 Cumulative December, 1996 91160206.0 December, 1996 88049078.0 Janua 91654231.0 Janua 88587794.0 Februa 92132920.0 Februa 89050738.0 March 92145350.0 March 89582965.0 A ril 92337500.0 A ril 90029800.0 92864454.0 Ma 90555356.0

II IH

'I Il