Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr
ML17353A444
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/1995
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO., PENNSYLVANIA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-302, NUDOCS 9511210122
Download: ML17353A444 (15)


Text

P R.IC3 RIDS PROCESSING)

R.IMY'CCELERATED REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME. AUTHOR AFFILIATION KNORR,J.E. Florida Power & Light Co.

HOVEY,R.J. Pennsylvania Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o ing repts for Oct 1995 for Turkey Point Units 3 & 4 95111 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

JENCL Q SIZE: 0 NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 E CE 1 1 NRR/DRPM/PECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM PI -37 (EXT. 504-2083 ) TO ELI NlI NATE YOUR NAME P ROil DISTRIBUTION LISTS I'OR DOCI 'MENTS YOU DON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

L-95-302 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey'oint Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the October 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, Robert J. Hove Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9511210122 '751031 PDR ADOCK 05000250 R PDR an FPL Group company

1 I t N

I oM i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/95 0 10/02/95 0 10/03/95 0 10/04/95 0 10/05/95 0 10/06/95 0 10/07/95 0 10/08/95 98 10/09/95 105 10/10/95 239 10/11/95 284 10/12/95 283 10/13/95 5 10/14/95 279 10/15/95 574 10/16/95 690 10/17/95 139 10/18/95 236 10/19/95 653 10/20/95 688 10/21/95 686 10/22/95 691 10/23/95 695 10/24/95 691 10/25/95 692 10/26/95 690 10/27/95 688 10/28/95 687 10/29/95 689 10/30/95 697 10/31/95 696

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 1 1/15/95 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: OCTOBER 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9- POWER LEVEL TO WHICH RESTRICTED'F ANY (NET MWE)

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 745 7296 200793.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 595.4 6463.6 135441. 9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0' 844.4
14. HOURS GENERATOR ON-LINE 519.9 6383.1 133431.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 932764 13655559 277821493
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 297967 441 1029 89172493
18. NET ELECTRICAL ENERGY GENERATED (MWH) 284623 4202647 84397074
19. UNIT SERVICE FACTOR 69.8 87.5 66.5
20. UNIT AVAILABILITYFACTOR 69.8 87.5 66.5
21. CAPACITY FACTOR (USING MDC NET) 57.4 86.5 64. 1
22. CAPACITY FACTOR (USING DER NET) 55.1 83.1 60.7
23. UNIT FORCED OUTAGE RATE 0.0 0.6 10.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No Date Type Duration (Hours)

Reason* Nethod of shutting Licensee Event Reportf System Code Code'ause Component 4 corrective Action to Prevent Recurrence Down Reactor 05 950904 172. 5 N/A N/A N/A Refueling 06 951008 0.0 N/A CC HTEXCH secondary Chemistry power level hold 07 951009 1.8 N/A H/A VALVEX Turbine valve test 08 951010 0.0 N/A CC HTEXCH Secondary Che~istry power level hold 09 951010 0.0 N/A N/A N/A Physics testing 10 951012 25.4 N/A HA TURBIN Install turbine balance shot 951014 0.0 CC HTEXCH Secondary Che~istry power level hold 12 951014 0.0 N/A N/A N/A Delta T calculations

13 951017 25.4 95-007 CRD RYE Nanual Trip due to dropped control rods F forced Reason Yethod Exhibit G Instructions Exhibit - Sa"e Source S Scheduled A - Equipnent Failure 1 - manual for preparation of Data 1

B Ymintenance or Test 2 - Ymnuai Scran Entry Sheets Licensee c - Refueling 3 - Autonatic scran Event Report (LER) Pile D - Regulatory restriction 4 - continued (NUREG-0161)

E Operator Training 4 5 - Load Reduction License Exanination 9 - Other (Explain)

F - Adninistrative G Operational Error (Explain)

H Other (Explain)

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 began the month shut down for a refueling. The unit returned to power on October 8, 1995. The unit remained at 30%

power or less for a secondary water chemistry hold, testing and turbine balancing until October 14. The plant was returned to 100% power and remained so until a manual reactor trip was initiated after the inadvertant drop of four control rods on October 17. The plant was returned to 100% power on October 18, and remained at essentially that level through the end of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/95 671 10/02/95 672 10/03/95 672 10/04/95 674 10/05/95 678 10/06/95 680 10/07/95 679 10/08/95 678 10/09/95 677 10/10/95 677 10/11/95 677 10/12/95 676 10/13/95 676 10/14/95 681 10/15/95 684 10/16/95 682 10/17/95 680 10/18/95 679 10/19/95 681 10/20/95 667 10/21/95 674 10/22/95 680 10/23/95 683 10/24/95 679 10/25/95 681 10/26/95 679 10/27/95 677 10/28/95 675 10/29/95 678 10/30/95 684 10/31/95 686

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Da'te Typo Duration (Hours)

Reason Yethod of shutting Licensee Event Roportt Code'omponent System Code'ause s Corrective Action to Prevent Recurrence Down Reactor N/A F - Forced Reason Yethod Exhibit G - Instructions Exhibit 1 - Same Source s scheduled A - Equipmont Failure 1 - Nanual for Preparation of Data B - Maintenance or Tost 2 - Yanual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training S 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 251 DATE 11/ 7/95 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

l. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: OCTOBER 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760 5 ~ DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT. GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 745 7296 194525.0
12. NUMBER OF HOURS REACTOR WAS CRITICAI 745.0 7174. 1 132021.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 745.0 7165 ' 127929.2

'15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2

16. GROSS THERMAL ENERGY GENERATED (MWH) 1634517 15582769 270507478
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 529638 5048386 86497036
18. NET ELECTRICAL ENERGY GENERATED (MWH) 505079 4810903 81890489
19. UNIT SERVICE FACTOR 100.0 98.2 65.8
20. UNIT AVAILABILITYFACTOR 100.0 98.2 66.1
21. CAPACITY FACTOR (USING MDC NET) 101. 8 99.0 64.2
22. CAPACITY FACTOR (USING OER NET) 97.8 95. 1 60.7
23. UNIT FORCED OUTAGE RATE 0.0 1.8 10.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING SCHEDULED FOR MARCH 1996
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

r ~

DOCKET NO.

UNIT:

DATE:

COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100% reactor power for the month of October.