Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr
ML17354A363
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/30/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0020, RTR-NUREG-20 L-96-322, NUDOCS 9612180049
Download: ML17354A363 (14)


Text

CATEGORY 1 REGULATO INFORMATION DISTRIBUTION aTEM (RIDS)

ACCESSION NBR:9612180049 DOC.DATE: 96/11/30 NOTARIZED: NO DOCKET FAC1L:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4,,Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power & Light Co.

HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts Units 3 a 4.W/961211 ltr.for Nov 1996 for Turkey Point DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2'-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 1 1 NRR/DRPM/PECB 1 1 PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL . 10

OF:C 1 l 't996 L-96-322 PPL 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the November 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hove Vice President Turkey Point Plant JEK Attachments cc:S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point. Plant 96f2f80049 rlr6fi30 PDR ADQCK 05000250j R PDR

>70035 an FPL Group company

0 pf

AVERAGE DAI NIT POWER LEVEL DOCKET NO. 50- 250 UNIT Turkey PoInt N3 DATE Dec 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246- 6757 MONTH November, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/96 705 11/02/96 704 11/03/96 705 11/0496 711 11/05/96 713 11/06$ 6 709 11/07$ 6 708 11/08$ 6 711 11/09$ 6 716 11/10$ 6 727 11/11/96 731 11/12/96 729 11/13$ 6 727 11/14$ 6 727 11/15$ 6 726 11/16$ 6 727 11/17$ 6 727 11/18$ 6 727 11/19/96 724 11/20/96 719 11/21/96 716 11/22$ 6 715 11/23/96 717 11/24/96 721 11/25/96 721 11/26/96 718 11/27/96 720 11/28/96 725 11/29/96 725 11/30/96 725

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point 3 DATE: December 9 1996 COMPLETED BY: Z. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH November 1996 Date Duration Reason Method of Licensee System Component Cause C Corrective Action to (Hours) Shutting Event Codee Code> Prevent Recurrence Down Reportf Reactor>

N/A 1 2 3 4 5 F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S Scheduled A - Equipment Failure 1 Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C Refueling 3 Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NUREG-0161) restriction 5 - Load Reduction E - Operator Training & 9 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

OP ING DATA REPORT DOCKET NO 50 -260 DATE 12/06I96 PREPARED BY J. E. Knorr TELEPHONE (305) 2464757

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: November, 1996
3. LICENSED THERMAL POWER (MWT): 2300
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 720
6. MAXIMUMDEPENDABLE CAPACITY (GROSS MWE): 726
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 693
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: Final changes hasve been made for the thermal power uprate.
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720.0 8040.0 210297.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7801.6 144707.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 720.0 7747.4 142643.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1661799 16838056 297869076
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 641666 5471276 95708260
18. NET ELECTRICAL ENERGY GENERATED (MWH) 517871 5211622 90625018
19. UNIT SERVICE FACTOR 100.0 96.4 67.8
20. UNIT AVAILABILITY FACTOR 100.0 96.4 67.9
21. CAPACITY FACTOR ( USING MDC NET ) 103.8 96.7 62.3
22. CAPACITY FACTOR ( USING DER NET ) 99.9 93.0 59.9
23. UNIT FORCED OUTAGE RATE 0.0 3.6 10.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

Refueling outage scheduled for March 1997.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT: Turke Point 53 December 9, 1996 TELEPHONE'0-250 DATE'OMPLETED BY: J. E. Knorr (305) 246-6757 REPORT MONTH November 1996 Unit 3 operated at approximately 100% reactor power through the month of November.

AVERAGE DAI NIT POWER LEVEL DOCKET NO. 50 - 251 UNIT Turkey Point P4 DATE Deo 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONTH November, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/96 710 11/0286 709 11/03/96 709 11/0496 706 11/05/96 706 11/06/96 705 11/07$ 6 710 11/08$ 6 711 11/09/96 719 11/10/96 730 11/11$ 6 732 11/12/96 731 11/13/96 729 11/1496 728 11/15/96 729 11/16/96 729 11/17/96 729 11/18/96 728 11/19/96 726 11/20/96 722 11/21/96 719 11/22/96 718 11/23/96 718 11/2496 722 11/25/96 721 11/26/96 718 11/27/96 721 11/28/96 725 11/29/96 726 11/30/96 725

~+ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turke Point 4 DATE: December 9 1996 COMPLETED BY: J. E. Knorr TELEPHONE:

REPORT MONTH November 1996 No. Date Duration Reason Method of Licensee System Component Cause c Corrective Action to (Hours) Shutting Event Code4 Code> Prevent Recurrence Kewn Reports Reactor3 N/A 1 2 3 4 5 F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S Scheduled A - Equipment Failure 1 Manual for Preparation of Data B Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (HUREG-0161) restriction 5 - Load Reduction E - Operator Training & 9 - Other tExplain)

License Examination F - Administrative G - Operational Error tExplain)

H - Other tExplain)

b t

OP ING DATA REPORT DOCKET NO 50 -261 DATE 12106i86 PREPARED BY J. E. Knorr TELEPHONE (306) 2464757

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: November, 1996
3. LICENSED THERMAL POWER (MWT): 2300
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICALRATING (NET MWE): 720
6. MAXIMUMDEPENDABLE CAPACITY (GROSS MWE): 726
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 693
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: Final changes have been made for the thermal power uprate.
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720.0 8040.0 204029.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7223.2 140709.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 720.0 7028.8 136422.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 677.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1663891 16160667 288833924
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 642161 4864869 92404000
18. NET ELECTRICAL ENERGY GENERATED (MWH) 618628 4627933 . 87617348
19. UNIT SERVICE FACTOR 100.0 87.4 66.9
20. UNIT AVAILABILITYFACTOR 100.0 87.4 67.1
21. CAPACITY FACTOR (USING MDC NET) 103.9 86.1 62.0
22. CAPACITY FACTOR ( USING DER NET) 100.0 82.7 69.7
23. UNIT FORCED OUTAGE RATE 0.0 0.4 9.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT: Turke 'Point 54 DATE December 9, 1996

.TELEPHONE'0-251 COMPLETE BY: J. E. 'Knorr (305) 246-6757 REPORT MONTH November 1996 Unit 4 operated at approximately 100% reactor power through the month of November 1996.