- t AVERAGE DAILY UNir POWER LEVEL

_=

  • v DOCKET NO. 50-250 UNIT Turkey Point #3 DATE 6- 15-84 COMPLETED sy _ N.W. Grant TELEPilONE (305) 552-3675' MONTH May, 1984 .

DAY AVERAGE DAILY POWER LEVEL DAY IMWe Net)

' AVERAGE DAILY POWER LEVEL

-(MWe-Neil 1

If 62 2' 684 18

~

3 g9 688 4 -

683 20

'S 680 6

22 674 7

23 672 s 667 24 9 666 23 I 670 26 _

~

83 676 3, ,

l'~

28 679 .

575 682 13 ,,

g4 673 679 30 668 672 Is 3' 666 ,

16 9

INSTRUCTIONS h[,i

$'8 d'ilY unit Pwer lesel in MWe.Nei for each day in the repiiriing in.inth. Ciinipuie to he n are . 3sy3 jeF288FOgggggo PDR I& d b

- ,--,e.- - . , - __ _ _

i~

w OPERATING DATA REPORT DOCKET NO. 50-250 DATE _6-15-84 COMPLETED BY .N U TELEPHONE (305) Gra"h675 bbz-OPERATING STATUS Turkey Point Unit #3 Notes

1. Unit Name:

May _1984

2. Reportins Period: Unit #3 operated at full
3. Liesased Thermal Power (MWt): 2.200 power except as indicated in
4. Nameplate Rating (Gross MWe): 760 the " unit shutdowns and power
5. Design Electrical Rating (Net MWe): 693 reductions" report.
6. Maximum Dependable Capacity (Gross MWe): 700
7. Maximum Dependable Capacity (Net MWe): 696
8. If Changes Occu:in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr to Date Cmnulatise

11. Hours in Reporting Period 744 1.647 inn;719 A
12. Number Of Hours Reactor Was Critical 460.9 2.814.5 69.120.7
13. Resetor Reserve Shutdown Hours 0 0 844.4
14. Hows Generator On-Line 4bb.5 2,728.5 68,650.5 0 0 121.8
15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWH) 9945815 5,807.169 141:295.761 -
17. Gross Electrical Energy Genersted (MWH) 320,610 1.877.7/0 45.088.335 303,554_ ,_, 1,775,974 42,688,991
18. Net Electrical Energy Generated (MWH)'
19. Unit Service Factor 61.2 _ 74.8 68.2
20. Unit Availability Factor 61.2 74.8 68.3
21. Unit Capacity Factor (Using MDC Net) -

61.3 73.1 6L4

22. Unit Capacity Factor (Using DER Net) 58.9 70.3 61.2
23. Unit Forced Outage Rate 38.8 19.0 6.0
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units in Test Status (Prior to Comrr.ercial Operation): Forecast Aci ined INITIAL CRITICALITY ._ _

INITIAL ELECTRICITY COMMERCIAL OPER ATION _

. (9/77)

DOCKET NO.

50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point #3 DATE 6-15-84 REPORT MONTH !!ay, 1984 N DW N1 Gmnt TELEPHONE (305) 552-3675

,-  !? 3 Ik Licensee [*, *L Cause & Corrective

. No. Date i 3g F, .g s & Event p mO Acthe to

$. E j gji.g Report

  • g Prevent Recurrence d

12 840426 S 288.5 B 1 ZZ ZZZZZZ Unit #3 taken off line for Unit #4 safeguards test, snubber inspection and steam generator.feedwater nozzle inspections.

4 4

e i

i I 2 3 4 1 F: Forced Reason: Method: Exhibit G-Instructions .

S. Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data

B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-i D-Regulatory Restriction 9-Other (Explain) 0161) ,
E. Operator Training & Ucense Examination ,

F-Administrative 5 G Ope.atismal Frror (F xplain) x _ /. 4o Asewca..e# Eshibit I - Same Souree l't/77) Ilother (Euplain) i 1

, .- ~ - --. - - . . . . - - - - - - - . -. , . - - - -

i.

f- .

SUMMARY

OF OPERATING XPERIENCE DOCKET.NO. _ 50-250 UNIT Turkey Point Unit #3 DATE June 15, 1984 COMPLETED BY N.W. Grant

~

TELEPHONE REPORT HONTH Ma y. 1984 Unit #3 operated at essentially full power except as indicated in the

."Unit Shutdowns and Power, Reduction" Report.

Inspection and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company conmitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

5

AVERAGE DAILY UNIT POWER LEVEL 50-251 DOCKET NO.

UNIT Turkey Point Unit C DATE 6-15-84 COMPLETED sy N.W. Grant TELEPilONE (305) f,52-3675'

. MONTH May, 1984 DAY AVERACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) -(MWe-Neti I' -

g7 _

~

2 gg

~

3 19 .-

~

~

4 20 5 33

~

~

6 22 7 33

~

8 24

~

9 25

~

~

~

10 -

26 11 37

~~ ~

~

12 28

'13 -

39 _

~

~

14 30 15 _ 3;

~

16 I

INSTRUCTIONS

- On this forenat. list the aserage daily unit power leselin MWeSes for each day in the reporting month. Compute to the nearest whiite omgawatt.

(9/771

---.-n-- ..---

I OPERATING DATA REPORT I I

DOCKET NO.

DATE 6-15-84 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 '

OPERATING STATUS ,

. i Turkey Point Unit d4 Notes

1. Unit Name:

May 1984

2. Reporting Period: Unit #4 prepared to return  !
3. Licensed Thermal Power (MWt): 2.200 to power fol. lowing refueling 760
4. Nameplate Rating (Gross MWe): and schedaled maintenance.

693 ,

5. Design Electrical Rating (Net MWe):

. 6. Maximum Dependable Capacity (Gross MWe): 700 7.~ Maximum Dependable Capacity (Net MWe): 666

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since I.ast Report, Give Reasons: ,

[

9. Power Level To Which Restricted,If Any (Net MWe): -
10. Reasons For Restrictions.lf Any: l t

This Month Yr to.Date Omnulative l

11. Hours in Reporting Period 744 3,647 94;444
12. Number Of Hours Reactor Was Critical 52.1 1,368.7 66,00/.3
13. Reactor Resem Shutdown Hours 0 0 16i;_6
14. Hours Generator On.Line 3.7 1,273 63.741.1 0 0 31.2 ,
15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWH) 240,328 3.002.229 144 7an A7n -
17. Gross Electrical Energy Generated (MWH) 530 ,. 898.915 42 820:217

-3,916 843,253 40,547.312

18. Net Electrical Energy Generated (MWH)'
19. Unit Service Factor .5 34.9 67.5
20. Unit Availability Factor .5 34.9 67.5  :
21. Unit Capacity Factor (Using MDC Net) .

0 34.7 66.3 }

22.' Unit Capacity Factor (Using DER Net) 0 33.4 62.0  !

23. Unit Forced Outage Rate 0 21.1 4.8
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units la Test Status (Prior ta Commercial Operation): Forecast Achined INITIAL CRITICALITY . _ _ _

INITIAL ELECTRICITY COMMERCIAL OPER ATION ,,_

l

. (9/771 j

DOCRET NO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS ,

Turkey Point #4 UNIT NAME DATE _fi_15-R4 ColWLE1ED BY ' N.W. Grant

. REPORT MONTH MaY, 1984 (305) 552-3675

-TELEPHONE

. "i -

, - 3? 3f; hYk Licensee . Eg  !"L Cause & Corrective

. No. Date g 3g jg5 Event u '2 83 Action to

  • 5 Repori
  • cE 0 Preven; Recurrence c5 E jdi.g f' 6

07 840308 S 740.3 C 4 RC FUELXX Unit #4 remained off line for refueling and scheduled maintenance.

I i

I j

t i i 2 3 4

F: Forced Reason: Method: Exhibit G -Instructions 4

S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee 3-Automatic Scram. Event Report (LE R) File (NUREG-

  • C Refueling D-Regulatory Restriction @-O her(Explain) 0161) .

E-Operator Training & Ucense Examination, p ,

F-Administrative 5 G-Operational Error (F splain) 4. Ao4. A.smuc.v..c/ Exhibit I - Same Source (9/77) Il Other (Explain)

SUMMARY

OF~ OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point-Unit #4

.DATE June 15, 1984 COMPLETED BY. N.W. Grant TELEPHONE (305)552-3675 REPORT MONTH May, 1984 Unit 4 prepared to return to power following refueling and scheduled maintenance outage'. ,

Inspections.and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.