Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr
ML17353A354
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/1995
From: Knorr J, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-255, NUDOCS 9509180238
Download: ML17353A354 (13)


Text

PRIORITY 1

{ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 P 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251

  • AUTH.NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co.

PLUNKETT,T.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFXLIATXON I

SUBJECT:

Monthly repts for Aug 1995 for Turkey Point Units 0 3 6 4. 950912 r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL t SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPXENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 FILE C NTE 01 1 NRR/DIS P/PI PB RGN2 1

1 1

1 1

/DRPM/PECB 1 11 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC "

1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5DS (415 2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

j

~ t 1

SEP 12 'l995 L-95-255 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the August 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant I

QQ 9509180238 95083i an FPL Group company PDR ADOCK 05000250 R , , PDR

I 1 I

~ ~ Q~ <<$ ~ ~

, pP

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 8/01/95 673 8/02/95 549 8/03/95 670 8/04/95 681 8/05/95 680 8/06/95 674 8/07/95 669 8/08/95 666 8/09/95 662 8/10/95 660 8/11/95 674 8/12/95 662 8/13/95 658 8/14/95 659 8/15/95 662 8/16/95 661 8/17/95 6S9 8/18/95 659 8/19/95 660 8/20/95 658 8/21/95 655 8/22/95 659 8/23/95 659 8/24/95 672 8/25/95 677 8/26/95 673 8/27/95 669 8/28/95 664 8/29/95 663 8/30/95 663 8/31/95 661

t g

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Type'uration (Hours)

Reasons Method of Shutting Licensee Event Reportt Code'omponent System Code'ause 4 Corrective Action to Prevent Recurrence Down Reactor N/A F - Fozced Reason Method Exhihit C - Instructions Exhibit - Same Source s scheduled A - Equipment Failure 1 - Manual for Preparation of Data 1

B - Maintenance or Test 2 Manual Scram Entry sheets Licensee C - Refueling 3 Automatic Scram Event Report (LER) File D - Regulatory zestriction 4 - Continued (NUREG-0161)

E - Operator Training 6 5 - Load Reduction License Examination 9 Other (Explain)

F - Administrative C - Operational Erzor (Explain)

H - Other (Explain)

OPERATZNG DATA REPORT DOCKET NO 50 - 250 DATE 9/ 8/95 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: AUGUST 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET  : 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATZNGS (ITf~)MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN'EPORT PERIOD: 744 5831 199328.6
12. NUMBER OF HOURS REACTOR 744.0 5795.7 134774.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 5791.0 132839.7
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121. 8

%76754445

17. GROSS ELECTRICAL ENERGY GENERATED (MWH7 517099 4072085 88833549
18. NET ELECTRZCAL ENERGY GENERATED (MWH) 492271 3880334 84074761
19. UNIT SERVICE FACTOR 100.0 99.3 66.6
20. UNIT AVAILABILITYFA 100.0 99.3 66.7
21. CAPACITY FACTOR (USING MD 99.3 99.9 64.3
22. CAPACITY FACTOR (USING DER NET) 95.5 96.0 60.9
23. UNIT FORCED OUTAGE RATE 0.0 0.7 10.9
24. SHUTDOWNS SCHEDULED OVER REFUELING OUTAGE SCHEDULED SEPTEMBER 1995
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit. 3 operated at essentially 100% reactor power for the month of August. A small decrease in power was made on August 2 to repair the Northeast intercept valve on the main turbine.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE AVERAGE DAILY POWER LEVEL (MWe-Net) 8/01/95 676 8/02/95 674 8/03/95 680 8/04/95 684 8/05/95 683 8/06/95 676 8/07/95 672 8/08/95 669 8/09/95 665 8/10/95 662 8/11/95 664 8/12/95 666 8/13/95 662 8/14/95 663 8/15/95 660 8/16/95 660 8/17/95 662 8/18/95 663 8/19/95 664 8/20/95 660 8/21/95 658 8/22/95 601 8/23/95 296 8/24/95 598 8/25/95 678 8/26/95 676 8/27/95 674 8/28/95 669 8/29/95 669 8/30/95 668 8/31/95 668

UNIT SHUTDOWNS MD POWER REDUCTIONS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE:

REPORT MONTH No Date Type Duration (Hours)

Reason'ethod of Shutting Licensee Event Reports Code'omponent Sys'em Code'ause 6 Corzective Action to Prevent Recurrence Down Reactors 07 950822 0.0 N/A HC/HJ VALVEX/ Turbine valve test, cleaning condenser HTEXCH watezboxes and turbine plant cooling water heat. exchangers F Forced Reason Method Exhibit G - Instructions Exhibit - Same Source s - Scheduled A Equipment Failure 1 Manual for Preparation of Data 1

B - Maintenance or Test 2 Manual Scram Entry Sheets Licensee C Refueling 3 - Automatic Scram Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 6 5 - Load Reduction License Examination 9 Other (Explain)

F - Administrative G Operational Erzor (Explain)

H Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 9/ 8/95 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: AUGUST 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET  : 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MRS: 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES, OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5831 193060.0
12. NUMBER OF HOURS REACTOR 744. 0 5709.1 130556.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LZNE 744.0 5700.6 126464.2 15.

17.

UNIT RESERVE SHUTDOWN HO GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 I3%3598 509701

~> 0.0 5965 4009576 577.2 257290674 85458226

18. NET ELECTRICAL ENERGY GENERATED (MWH) 485227 3820665 80900251
19. UNIT SERVICE FACTOR 100.0 97.8 65.5
20. UNIT AVAILABILITYFA 100.0 97.8 65.8
21. CAPACITY FACTOR (USING MD 97.9 98.4 63.9
22. CAPACITY FACTOR (USING DER NET) 94.1 94.6 60.5
23. UNIT FORCED OUTAGE RATE 0.0 2' 10.6
24. SHUTDOWNS SCHEDULED OVER NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT DATE:

COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100% reactor power for the month of August except for a short reduction in power on August 22 through August 24 for turbine valve testing, condenser waterbox cleaning and turbine plant cooling water heat exchanger cleaning.