Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr
ML17353A483
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/30/1995
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-330, NUDOCS 9512190010
Download: ML17353A483 (14)


Text

'

PRIDRIWY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9512190010 DOC.DATE: 95/11/30 NOTARXZED: NO . DOCKET N FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power & Light Co.

HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME RECIPXENT AFFILIATION

SUBJECT:

Monthly operating repts for Nov 1995 for Turkey Point Units 3 & 4.N/undated ltr.

DISTRXBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/S PD/RRAB 1 1 'lIfMCENTER 01 1 1 NRR/DRPM/PECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELIKIINATEYOUR. JAME PRO~I DISTRIBUTION LISTS I'OR DOCUMEN'I'S YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

L-95-330 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the November 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

ly yours, C oQQf Robert J. ovey Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant

~ W,/', W 9512i900i0 95ii30 PDR ADOCK 05000250

, R . . . , . PDR an FPL Group company

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/95 689 11/02/95 682 11/03/95 678 11/04/95 680 11/05/95 685 11/06/95 686 11/07/95 606 11/08/95 681 11/09/95 691 11/10/95 698 11/11/95 693 11/12/95 691 11/13/95 691 11/14/95 695 11/15/95 701 11/16/95 704 11/17/95 703 11/18/95 702 11/19/95 700 11/20/95 700 11/21/95 697 11/22/95 701 11/23/95 702 11/24/95 699 11/25/95 698 11/26/95 671 11/27/95 701 11/28/95 698 11/29/95 695 11/30/95 695

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY TELEPHONE:

REPORT MONTH No. Date Duration (Hours)

Reason Method of Shutting Licensee Event Roportf Code'o Code'ause Sys'em ponent 4 Cozrective Action to Prevent Rocurrenco Down Reactor 951107 0.0 N/A CH VALVEX steam generator feedwater control valve repair.

F Forced

- Reason Mothod Exhibit - Instructions Exhibit - Sa=e source S Scheduled A - Equipment Failuro 1 - Manual G

for Preparation of Data 1

B - Maintenance or Tost 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 6 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 12/ 8/95 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: NOVEMBER 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET  : 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MRS: 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 8016 201513.6
12. NUMBER OF HOURS REACTOR 720.0 7183.6 136161.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 720.0 7103. 1 134151.7
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121.8 TPH'893 X3iUU452 279396386
17. GROSS ELECTRICAL ENERGY GENERATED (MW~ 520704 4931733 89693197
18. NET ELECTRICAL ENERGY GENERATED (MWH) 497059 4699706 84894133
19. UNIT SERVICE FACTOR 100.0 88.6 66.6
20. UNIT AVAILABILITYFA 100.0 88.6 66.6
21. CAPACITY FACTOR (USING MD 103.7 88.0 64.3
22. CAPACITY FACTOR (USING DER NET) 99.6 84.6 60.8
23. UNIT FORCED OUTAGE RATE 0.0 0.9 10.8
24. SHUTDOWNS SCHEDULED OVER NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT'ATE'OMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 began the month operating at essentially 100% power. The unit reduced power on November 7, 1995 to repair the 'C'team generator feedwater control valve. The unit returned to essentially 100% power the next day and remained at essentially 100% power for the rest of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/95 684 11/02/95 680 11/03/95 676 11/04/95 676 11/05/95 680 11/06/95 682 11/07/95 681 11/08/95 675 11/09/95 685 11/10/95 692 11/11/95 688 11/12/95 686 11/13/95 690 11/14/95 691 11/15/95 696 11/16/95 700 11/17/95 642 11/18/95 300 11/19/95 382 11/20/95 692 11/21/95 690 11/22/95 695 11/23/95 697 11/24/95 693 11/25/95 693 11/26/95 671 11/27/95 696 11/28/95 693 11/29/95 691 11/30/95 692

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Duration (Hours)

Reason* Method of Reactor'icensee Shutting Event Reportf code'omponent System Code'ause 4 corrective Action to Prevent Recurrence Down 08 951117 0.0 N/A HA VALVEX Turbine valve test 09 951117 0.0 N/A HF HTEXCH Condenser waterbox cleaning F - Forced Reason Method Exhib).t G - Instructions Exhibit - Source S Scheduled A - Equipment Failure 1 - Manual for Preparation of Data 1 Same 8 - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Auto.wtic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training s 5 Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

,OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 12/ 8/95 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: NOVEMBER 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MRS: 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHA'NGES OCCUR IN CAPACITY RATINGS (ITEH~UMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 8016 195245.0
12. NUMBER OF HOURS REACTOR 720.0 7894.1 132741.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 720.0 7885.6 128649.2
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2 77TT3'989 2VZF38698
17. GROSS ELECTRICAL ENERGY GENERATED (MWHJ 500532 5548918 86997568
18. NET ELECTRICAL ENERGY GENERATED (MWH) 477225 5288128 82367714
19. UNIT SERVICE FACTOR 100.0 98.4 65.9
20. UNIT AVAILABILITYFA 100.0 98.4 66.2
21. CAPACITY FACTOR (USING MD 99.5 99.1 64.3
22. CAPACITY FACTOR (USING DER NET) 95.6 95.2 60.9
23. UNIT FORCED OUTAGE RATE 0.0 1.6 10.4
24. SHUTDOWNS SCHEDULED OVER REFUELING OUTAGE SCHEDULED MARCH 1996
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT:

DATE:

COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100% reactor power until November 17, 1995. On November 17, power was reduced to 40% for a turbine valve test. Later that day power wa's increased to 50% power during the cleaning of condenser water boxes. The unit was returned to 100% power on November 19 and remained at essentially that power level through the end of the month.

A

~ ~