Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr
ML17353A560
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/31/1996
From: Jim Hickey, Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-030, L-96-30, NUDOCS 9602230181
Download: ML17353A560 (15)


Text

CATEGORY 1 REGULATIO INFORMATION DISTRIBUTION%STEM (RIDE)

DOCKET I FACIE:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HICKEY,J.A.

HOVEY,R.J.

RECIP.NAME

'loridaFlorida Power & Light Co.

Power a Light Co.

RECIPIENT AFFILIATION

SUBJECT:

Monthl ting repts for Jan 1996 for Turkey Points 3 &

/960213 1 r.

DISTRIBUTION CODE'E24D COPIES RECEIVED'LTR Monthly Operating Report (per Tech Specs)

L ENCL SIZE'ITLE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTE U,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 4;~LE ~Cggg~0~1 1 1 NRR/DRPM/PECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 .1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

LTTR

'ENCL' "9' TOTAL NUMBER OF COPIES REQUIRED 9

l

~

g t

~ p~

F Eai f~ggt.

L-96-030 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the January 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

~l~

Very truly yours, Robert J. Hovey, Vice President Turkey Point Plant Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 23p pp~

'7602230i8i 960i3i PDR ADQCK OM00250 g pg~l R PDR an FPL Group company

k C-I I l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE Feb. 7 1996 COMPLETED BY Z. A. Hicke TELEPHONE 305-246-6668 MONTH Janua 1996 AVERAGE DAILY POWER LEVEL (MWe-Net) 01/01/96 698 01/02/96 691 01/03/96 691 01/04/96 699 01/05/96 702 01/06/96 703 01/07/96 700 01/08/96 704 01/09/96 710 01/10/96 708 01/11/96 705 01/12/96 702 01/13/96 706 01/14/96 705 01/15/96 702 01/16/96 695 01/17/96 690 01/18/96 686 01/19/96 684 01/20/96 686 01/2 1/96 685 01/22/96 683 01/23/96 687 01/24/96 688 01/25/96 686 01/26/96 683 01/27/96 684 01/28/96 684 01/29/96 686 01/30/96 683 01/3 1/96 637

~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point 3 DATE: Feb. 7 1996 COMPLETED BY: J. A. Hicke TELEPHONE: 305 246-6668 REPORT MONTH JANUARY 1996 No. Date Type ~ Duration (Hours)

Reason* Method of Licensee Event Code'omponent System Code'ause Sr, Corrective Action to Prevent Recuzrence Shutting Reports Doen Reactor*

01 013196 N/A WA FILTERS GRASS FOULING OF INTAKE SCREENS/STRAINERS F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled h - Equipment Failure 1 - Manual for Prepazation of Data B - Maintenance or Test 2 Manual Sczam Entry Sheets Licensee C - Refueling, 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training, &, 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 2/ 7/96 PREPARED BY J. A. HICKEY TELEPHONE 305/246/6668 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: JANUARY 3.996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MRS: 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 744 203001.6
12. NUMBER OF HOURS REACTOR 744.0 744. 0 137649.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744. 0 744.0 135639.7
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121.8 TK3T459 TE3T459 2KK62478
17. GROSS ELECTRICAL ENERGY GENERATED (hSGg 538784 538784 90775769
18. NET ELECTRICAL ENERGY GENERATED (MWH) 514799 514799 85928195
19. UNIT SERVICE FACTOR 100.0 100.0 66.8
20. UNIT AVAILABILITYFA 100. 0 100.0 66.9
21. CAPACITY FACTOR (USING MD 103.9 103. 9 64.5
22. CAPACITY FACTOR (USING DER NET) 99.8 99.8 61.1
23. UNIT FORCED OUTAGE RATE 0.0 0.0 10.6
24. SHUTDOWNS SCHEDULED OVER NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

4~

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point 3 DATE Feb. 7 1996 COMPLETED BY: J. A. Hicke TELEPHONE: 305 246-6668 REPORT MONTH JANUARY 1996 Unit 3 operated at essentially 1004 reactor power for the month.

However, late on January 31 a large grass influx forced a unit.

load reduction to 604 power.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE Feb. 7 1996 COMPLETED BY J. A. Hicke TELEPHONE 305-246-6668 MONTH JANUARY 1996 AVERAGE DAILY POWER LEVEL (MWe-Net) 01/01/96 696 01/02/96 689 01/03/96 689 01/04/9 6 697 01/05/9 6 702 01/06/96 702 01/07/96 699 01/08/96 703 01/09/96 708 01/10/96 707 01/11/96 700 01/12/96 701 01/13/96 705 01/14/96 705 01/15/96 704 01/16/96 700 01/17/96 697 01/18/96 692 01/19/96 690 01/20/96 692 01/21/96 691 01/22/96 689 01/23/96 691 01/24/96 692 01/25/96 691 01/26/96 690 01/27/96 692 01/28/96 692 01/29/96 695 01/30/96 691 01/3 1/96 689

0

~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS i DOCKET NO. 50-251 UNIT NAME: Turke Point 4 DATE: Feb 7 1996 COMPLETED BY: J. A. Hicke REPORT MONTH JANUARY 1996 No. Date Type Duration Reasons Method Licensee System Code'omponent Cause 6, Corrective Action to (Houzs) of Event Code* Prevent Recurzence ShuttinS Report@

Down Reacto&

N/A F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 - Manual i'or Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - RefuelinB 3 - Automatic Scram Event Report (LER) File D - Regulatory zestriction 4 - Continued (NUREG-0161)

E - Operator TraininB Er, 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT

'OCKET NO 50 -. 251 .

DATE 2/ '7/96 PREPARED, BY; J. A. HICKEY,,>>

  • TELEPHONE 305/246/6668 OPERATING STATUS
l. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: JANUARY 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760

,5. DESIGN ELECTRICAL RATING (NET  : 693

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE~ 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~UMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 ~.744 196733.0
12. NUMBER OF HOURS REACTOR 744.0 .

- 744.0 134229.8

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 ~,~ 0.0 166.6 14.

15.

HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HO 744 . 0 0.0

g'744 . 0 0.0 130137.2 577.2 2733'07252

17. GROSS ELECTRICAL ENERGY GENERATED (MWHJ 542251.- "=

542251 4,88081392

18. NET ELECTRICAL ENERGY GENERATED (MWH) 517868-; 517868 83402783
19. UNIT SERVICE FACTOR 100. 0: ~,i 100. 0 66.1
20. UNIT AVAILABILITYFA 100.0 . 100.0 66.4 21 CAPACITY FACTOR (USING MD 104 5 q,j 104 5 64.6
22. CAPACITY FACTOR (USING DER NET) 100.4, '" ~> 100.4 61.2
23. UNIT FORCED OUTAGE RATE 0.0 0.0 10.2

-24. SHUTDOWNS SCHEDULED OVER REFUELING OUTAGE OUTAGE SCHEDULED MARCH 1996

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE: Feb. 7 1996 COMPLETE BY: J. A. Hicke TELEPHONE: 305 246-6668 REPORT MONTH JANUARY 1996 Unit 4 operated at essentially 100% reactor power for the month.

1 I4 I

g ~