Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr
ML17354A298
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0020, RTR-NUREG-20 L-96-266, NUDOCS 9610230098
Download: ML17354A298 (14)


Text

CATEGORY 1.

REGULRT INFORMATION DISTRIBUTION%'STEM (RIDE) 4 ACCESSION NBR 9610230098 'DOC.DATE: 96/09/30 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light' 05PPP25P 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power a Light Co.

HOVEY,R.J. Florida Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 0 1 1 NRR/DRPM/PECB 1 1 PA 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCEFJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I

%a

OCT14 >SS6 L-96-266 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control . Desk Washington, D. C. 20S55 Re: Turkev Point Units 3 and 4 Docket Nos. 50-250 and SO-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the September 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R.

Ql J. Hove Vice Presi ent Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9'6L0230098 9'h09'30 PDR ADOCK 05000250 g~~~'/(

R PDR

~gQO'72 an FPL Group company

"s I

II dl

AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50-250 UNIT Turkey Point I/3 DATE Oct 08, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246- 6757 MONTH Se tember, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 09/01/96 667 09/02/96 667 09/03/96 664 09/04/96 666 09/05$ 6 669 09/06/96 668 09/07/96 666 09/08/96 667 09/09/96 673 09/10$ 6 676 09/11$ 6 674 09/12/96 671 09/13/96 669 09/14/96 668 09/15/96 666 09/16/96 669 09/17/96 670 09/18/96 668 09/19/96 668 09/20/96 668 09/21/96 667 09/22/96 667 09/23/96 663 09/24$ 6 91 09/25/96 0 09/26/96 0 09/27/96 0 09/28/96 556 09/29/96 674 09/30/96 674

I OPE NG DATA REPORT DOCKET NO 50 -250 DATE 10/10/96 PREPARED BY J. E. Knorr TELEPHONE (305) 2464757

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: September, 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICALRATING (NET MWE): 693
6. MAXIMUMDEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720.0 6575.0 208832.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 651.6 6336.6 143242.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.2
14. HOURS GENERATOR ON-LINE 631.3 6282.4 141178.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1387030 13505852 294536871
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 438277 4384455 94621440
18. NET ELECTRICAL ENERGY GENERATED (MWH) 415364 4176647 89590543
19. UNIT SERVICE FACTOR 87.7 95.5 67.6
20. UNIT AVAILABILITY FACTOR 87.7 95.5 67.6
21. CAPACITY FACTOR ( USING MDC NET ) 86.6 95.3 64.4
22. CAPACITY FACTOR ( USING DER NET ) 83.2 91.7 61.9
23. UNIT FORCED OUTAGE RATE 12.3 10.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

Refueling shutdown scheduled March of 1997

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turkey Point ¹ 3 DATE: Oct 08, 1996 COMPLETED BY: J. E. Knorr REPORT MONTH SEPTEMBER 1996 TELEPHONE: (305) 2466757 Date Type Duration Reason Method of LIcensee System Component Cause and Corrective (Hours) 2 Shutting Dovm Event Code Code Action to 1

Reactor Report ¹ 4 5 Prevent Recurrence:

00001022 09/24/96 F A 96-010 INSTRU Shutdovm due to tve dropped rods 00001023 09/24/96 S 0.0 RB INSTRU Repair control cards for two dropped rods

1. F Forced 2. A - Equipment Failure (Explain) 3. 1-Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preparation of Data Entry C - Refueling 3- Automatic Scram Sheets LIcensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG41 61)

E - Operator Training LIcense Examination 5 - Load Reduction 5.

F - Administraitive 9 - Other (Explain) Exibit I - Same Source G - Operational Error (Explain)

H - Other (Explain)

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 operated at approximately 100% reactor power until September 23, 1996. On the morning of September 24 two rods were dropped due to a control card failure in the control rod drive cabinet for those rods. Shortly afterward, the unit was taken to Mode 3 to replace the control card. Unit 3 was taken to Mode 2 early in the morning of September 27 and to Mode 1 late that evening. The unit returned to 100% reactor power late in the morning of September 28, 1996 and continued at essentially that power level thru the end of the month.

AVERAGE DAI NIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point N4 DATE Oct 08, 1996 COMPLETED BY J. E. Knorr TfLEPHONE (305) 246-6757 MONTH Se tember, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 09/01/96 660 09/02$ 6 659 09/03/96 656 09/0496 659 09/05$ 6 662 09/06/96 660 09/07/96 656 09/08/96 659 09/09/96 660 09/10/96 670 09/11/96 665 09/12/96 663 09/13/96 660 09/14/96 428 09/1 5/96 405 09/16/96 661 09/17/96 662 09/18/96 660 09/19/96 658 09/20$ 6 660 09/21/96 660 09/22/96 657 09/23/96 659 09/24$ 6 661 09/25/96 666 09/26/96 660 09/27/96 668 09/28/96 668 09/29/96 666 09/30/96 666

OPE ING DATA REPORT DOCKET NO 60 -251 DATE 10/08/96 PREPARED BY J. E. Knorr TELEPHONE (305) 2464757

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: September, 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUMDEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVELTO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD - CUMUlATIVE

11. HOURS IN REPORT PERIOD: 720.0 6576.0 202664.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5758.2 139244.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 720.0 6637.6 135030.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1547341 12070842 285744099
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 487947 3860362 91381503
18. NET ELECTRICAL ENERGY GENERATED (MWH) 464431 3671917 86556832
19. UNIT SERVICE FACTOR 100.0 86.7 66.7 FACTOR
20. UNIT AVAILABILITY 100.0 85.7 66.7
21. CAPACITY FACTOR (USING MDC NET) 96.9 83.9 64.2
22. CAPACITY FACTOR ( USING DER NET ) 93.1 80.6 61.7
23. UNIT FORCED OUTAGE RATE 0.0 1.4 9.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turkey Point ¹ 4 DATE: Oct 10, 1996 COMPLETED BY: J. E. Knorr REPORT MONTH SEPTEMBER 1996 TELEPHONE: (305) 24i6757 Date Type Duration Reason Method of IJcensee System Component Cause and Corrective (Hours) 2 Shutting Dovm Event Code Code Action to 1

Reactor Report ¹ 4 5 Prevent Recurrence:

00001021 09/1496 S 0.0 HH VALVEX Repair failed feedwater pump suction relief valve and perform turbine valve testing

1. F Forced 2. A - Equipment Failure (Explain) 3. 1- Manual 4. Exibit G - Insbuctions for S Scheduled B - Maintenance or test 2- Manual Scram Preperation of Data Entry C - Refueling 3- Automatic Scram Sheets IJcensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161)

E - Operator Training License Examination 5- Load Reduction F - Administraitive 9 - Other (Explain) Exibit I - Same Source G - Operational Error (Explain)

H - Other (Explain)

r l'e DOCKET NO.

UNIT:

DATE:

COMPLETE BY:

TELEPHONE:

1 Unit 4 operated at approximately 100% reactor power until September 14, 1996. That morning, power was reduced to 60% power to repair a relief valve on a main feedwater pump suction line and to perform turbine valve testing. Power was returned to 100% reactor power late in the afternoon on September 15. The Unit remained at essentially that power level for the remainder of the month.