Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr
ML17354A622
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/1997
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-230, NUDOCS 9709170242
Download: ML17354A622 (15)


Text

CATEGORY 1 REQUEST(Q TNRORMRTION DZSTRIBUTZONO'STEM (RTDS)

ACCESSION NBR:9709170242 DOC.DATE: 97/08/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50,-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME . AUTHOR AFFILIATION MOWREYIC.L. Florida Power & Light Co.

HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly 'operating repts for Aug 1997 for Turkey Point.

W/970909 ltr. A DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs T NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 0 INTERNAL: AEOD/SPD/RRAB ,1 1 FILE CENTER 1 1 1 NRR/DRPM/PECB 1 1 AD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 U

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS, OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

'DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

SEP 09 1997 L-97-230

@PI 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the August 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, Oi R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant L'i'OO79 9709i70242 97G83i 0500025G IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PDR ADQCK R PDR ~

an FPL Group company

k' I

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE Se tember 3 1997 COMPLETED BY TELEPHONE 305 246-6204 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 4737.3 150188.8
4. Number of Hours Generator Was On Line 725.5 4642.8 148029.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 504273.0,, 3161305.0 94321511.0

AVERAGE DAI NIT POWER LEVEL DOCKET NO. 50- 250 UNIT Turkey Point rt'3 DATE Sep 03, 1997 COMPLETED BY C. L Mowrey TELEPHONE (305) 246- 6204

.MONTH August, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe.Net) 08/01/97 692 08/02/97 698 08/03/97 700 08/04/97 700 08/05/97 698 08/06/97 699 08/07/97 699 08/08/97 699 08/09/97 700 08/10/97 705 08/11/97 702 08/12/97 698 08/13/97 697 08/14/97 302 08/15/97 403 08/16/97 695 ,

08/17/97 699 08/18/97 700 08/19/97 696 08/20/97 696 08/21/97 697 08/22/97 700 08/23/97 701 08/24/97 701 08/25/97 703 08/26/97 704 08/27/97 704 08/28/97 704 08/29/97 705 08/30/97 705 08/31/97 708

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 DNI1' 6MB: T I P I Se tember3 1997 I'ATE:

CDMPLB1'BD BY: C. L.

TBLBPNDNB: N006 <<-I6 00 REPORT MONTH AUGUST 1997 Date Type'uration Reasons Method of 4 Corrective Action Counts

{Hours)

Reactor'ause Shutting Down 1052 8/14/97 18.5 Taken off line to repair leak from High pressure Oil Backup to Generator Air Side Seal Oil system F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training 6 5 - Load Reduction License Examination 9 - Other {Explain)

F - Administrative G - Operational Error t Explain)

H - Other (Explain)

SUMMARY

OF< OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT:

DATE:

T~ki Se tember3 H

1997 COMPLETED BY L. Mowre TELEPHONE: 305 246-6204 HH OllT MONTH k Unit 3 operated at essentially 100% power until August 14, 1997, when the plant was taken ofF line to repair an oil leak. The Main Bearing Oil system supplies high pressure backup oil to the Main Generator Air Side Seal Oil system. The leak was on the backup oil supply line. The unit was returned to service and reached 100% power on August 15. The unit remained at essentially 100% power for the remainder of the month..

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE Se tember3 1997 COMPLETED BY ~C. L. Mowre TELEPHONE (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 5757.0 147210.0
4. Number of Hours Generator Was On Line 744.0 5743.8 142909.8
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 515422.0 4030464.0 92079542.0 r

AVERAGE DAI NIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point k4 DATE Sep 03, 1997 COMPLETED BY C. L Mowrey

~ TELEPHONE (304) 246 - 6204 MONTH August, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 08/01/97 690 08/02/97 , 694 08/03/97 692 08/04/97 692 08/05/97 '691 08/06/97 691 08/07/97 692 08/08/97 692 08/09/97 694 08/10/97 699 08/11/97 695 08/12/97 692 08/13/97 691 08/14/97 ., 690 08/15/97 690 08/16/97 691 08/17/97 693 08/18/97 693 08/19/97 690 08/20/97 688 08/21/97 688 08/22/97 691 08/23/97 686 08/24/97 693 08/25/97 694 08/26/97 694 08/27/97 696 08/28/97 697 08/29/97 697 08/30/97 698 08/31/97 701

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turke Pomt84 DATE: Se tember 3 1997 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH AUGUST 1997 No. Date Dura'tio Reason~ Method 4 Corrective Action to of Prevent Recurrence n

(Hours)

Reactor'ause Shutting Down N/A F - Eorced Reason Method S - Scheduled A - Equipnent Eailure 1 Manual B Maintenance or Test 2 Manual Scram C - Refueling 3 - Autonatic Scran D - Regulatory restriction 4 - Continued E - Operator Training 4 5 - Load Reduction License Examination 9 - Other (Explain)

P - Adninistrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point P4 DATE: Se tember 3 1997 COMPLETE BY: C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH AUGUST 1997 Unit 4 operated at essentially 100% power for the entire month of August.