Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr
ML17353A773
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/30/1996
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-181, NUDOCS 9607160151
Download: ML17353A773 (17)


Text

CATEGORY 1 REGULATO INFORMATION DISTRIBUTION YSTEM (RIDS) r ACCESSION NBR;9507<6'0151 DOC.DATE:

FACIL:50-250 Turkey Point Plant, Unit 3, 96/06/30 Florida NOTARIZED: NO DOCKET I Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOWREY,C.L. Florida Power & Light Co.

HOVEYgR,.J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for June 1996 for Turkey Point Units 3 S 4.W/960710 ltr. A DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 E CENTER 01 1 1 NRR/DRPM/PECB 1 1 RGN2 1 1 Y EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 U

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKg ROOM OWFN 5D"5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

  • TOTAL'NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

W 1

~ I

~P

( e,

JUL10 egg L-96-181 j

10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the June 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hov y

~ ~

Vice President Turkey Point Plant CLM Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant f 9b07ibOi5i PbOb30 PDR ADOCK 05000250 i PDR

~~g /i an FPL Group company

I'

'/

r

AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50- 250 UNIT Turkey Point 83 DATE Jul 05, 1996 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH June, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe.Net) 06/01/96 680 06/02/96 686 06/03/96 685 06/04/96 682 06/05/96 678 06/06/96 675 06/07/96 672 06/08/96 673 06/09/96 673 06/10/96 675 06/11/96 679 06/12/96 680 06/13/96 682 06/14/96 681 06/15/96 678 06/16/96 676 06/17/96 675 06/18/96 672 06/19/96 672 06/20/96 677 06/21/96 680 06/22/96 676 06/23/96 674 06/24/96 673 06/25/96 670 06/26/96 669 06/27/96 673 06/28/96 599 06/29/96 306 06/30/96 499

4 OPE NG DATA REPORT DOCKET NO 60-250 DATE 07/08I96 PREPARED BY C. L. Mowrey TELEPHONE (305) 246-6204 PERATIN TAT 1.UNIT NAME: TURKEY POINT UNIT3

2. REPORTING PERIOD: June, 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUMDEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD - CUMULATIVE

11. HOURS IN REPORT PERIOD: 720.0 4367.0 206624.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4196.9 141102.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON I.INE 720.0 4163.1 139058.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1538391 8910245 289941264
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 495627 2916890 93153876
18. NET ELECTRICAL ENERGY GENERATED (MWH) 472176 2780801 88194697
19. UNIT SERVICE FACTOR 100.0 95.3 67.3
20. UNIT AVAILABILITYFACTOR 100.0 95.3 67.3
21. CAPACITY FACTOR (USING MDC NET) 98.5 95.6 64.1
22. CAPACITY FACTOR ( USING DER NET ) 94.6 91.9 61.6
23. UNIT FORCED OUTAGE RATE 0.0 4.7 10.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

~ (,

UNIT SHUTDOWNS AND POWER REDUCTtONS DOCKET NO. 50-250 UNIT NAME: ¹ Turkey Point 3 DATE: Jul 08, 1996 COMPLETED BY: C. L Mowrey REPORT MONTH JUNE 1996 TELEPHONE: (305) 2466204 No. Date Type Duration Reason Method of Licensee System Component Cause and Corrective (Hours) 2 Shutting Down Event Code Code Action to 1

Reactor Report ¹ 4 5 Prevent Recurrence:

00001011 06/28/96 S 0.0 N/A HB VALVEX Turbine Valve Test 00001012 0.0 N/A HH HTEXCH Waterbox Cleaning 00001013 0.0 N/A WG HTEXCH TPCNf Heat Exchanger cleaning

1. F Forced 2. A - Equipment Failure (Explain) 3. 1- Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preperation of Data Enby C - Refueling 3- Automatic Scram Sheets Licensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161)

E - Operator Training License Examination 5 - Load Reduction 5.

F - Administraitive G - Operational Error (Explain) 9- Other (Explain) Exibit I - Same Source H - Other (Explain)

DOCKET NO.

UNIT DATE COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 operated at approximately 100% reactor power for most of the month of June 1996. The unit was reduced in power on June 28 for Turbine Valve testing, on June 29 to clean Circulating Water waterboxes, and on June 30 to clean Turbine Plant Cooling Water heat exchangers.

AVERAGE DAI NIT POWER LEVEL DOCKET NO. 50- 251 UNIT Turkey Potnt k'4 DATE Jul 05, 1996 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH June, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 06/01/96 665 06/02/96 671 06/03/96 671 06/04/96 590 06/05/96 637 06/06/96 659 06/07/96 658 06/08/96 659 06/09/96 660 06/10/96 662 06/11/96 664 06/12/96 666 06/13/96 667 06/14/96 667 06/15/96 663 06/16/96 660 06/17/96 658 06/18/96 655 06/19/96 655 06/20/96 661 06/21/96 663 06/22/96 660 06/23/96 659 06/24/96 658 06/25/96 657 06/26/96 657 06/27/96 660 06/28/96 662 06/29/96 659 06/30/96 661

OPE NG DATA REPORT DOCKET NO 50 -251 DATE 07I08I96 PREPARED BY C. L. Mowrey TELEPHONE (305) 2464204 OPERATING STATU

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: June, 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUMDEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD - CUMULATIVE

11. HOURS IN REPORT PERIOD.'2.

720.0 4367.0 200356.0 NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3550.1 137036.9

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON. LINE 720.0 3484.7 132877.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1574712 7409220 281082477
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 497584 2391392 89912533
18. NET ELECTRICAL ENERGY GENERATED (MWH) 473790 2273947 85158862
19. UNIT SERVICE FACTOR 100.0 79.8 66.3
20. UNIT AVAILABILITYFACTOR 100.0 79.8 66.3
21. CAPACITY FACTOR ( USING MDC NET ) 98.8 78.2 63.8
22. CAPACITY FACTOR ( USING DER NET ) 95.0 76.1 61.3
23. UNIT FORCED OUTAGE RATE 0.0 0.7 10.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: ¹ Turkey Point 4 DATE: Jul 02, 1996 COMPLETED BY: C. L Mavrey REPORT MONTH JUNE 1996 TELEPHONE: (305) 2464204 Date Type Duration Reason Method of LIcensee System Component Cause and Corrective (Hours) Shutting Dovm Event Code Code Action to 2

1 Reactor Report ¹ 4 5 Prevent Recurrence:

0.0 N/A CH HTEXCH 5A Feedwater Heater Tube Leak

1. F Forced 2. A - Equipment Failure (Explain) 3. 1-Manual 4. Exibit G - Instructions for S Scheduled 8 - Maintenance or test 2- Manual Scram Preperatlon of Data Entry C - Refueling 3- Automatic Scram Sheets Licensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161)

E - Operator Training. License Examination 5- Load Reduction F - Administraitive G - Operational Error (Explain) 9- Other (Explain) Exibit I - Same Source H - Other (Explain)

DOCKET NO. ZQ.~U.

UNIT:

DATE COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at approximately 100% reactor power for most of the month of June 'L996. Power was reduced once on June 4, while the 5A Feedwater heater was bypassed to repair a leak.

il, 4~

f