ML17354A573

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr
ML17354A573
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/30/1997
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-176, NUDOCS 9707150193
Download: ML17354A573 (16)


Text

CATEGORY j.

REGULATO INFORMATION DISTRIBUTION TEM (RIDS) 4 ACCE5lON NBR:9707150193 DOC.DATE: 97/06/30 NOTARIZED: NO DOCKET g FACIL:5!);$50.Turkey, Point Plant, Unit 3, Florida Power and Light C 05000250 50425l Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power !; Light Co.

HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for June 1997 for Turkey Point, Units la 2.W/970710 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 1 1 NRR/DRPM/PECB 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL '10

e" 0

I

juL10L-97-176 F99~

PI%II 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 eai e In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the June 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant Attachments cc: L. A. Reyes, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant

&MY'I 9707i50i93 970b30 llllllllllllllllllllllllllllllllllllllll PDR ADQCK 05000250 R PDR an FPL Group company

~ ~

4' M

AVERAGE DAIL NIT POWER LEVEL DOCKET NO. 50- 250 UNIT Turkey Point ¹3 DATE Jul 02, 1997 COMPLETED BY J. E. Knorr TELEPHONE I305I 246 - 6757 MONTH June, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 06/01/97 708 06/02/97 711 06/03/97 706 06/04/97 705 06/05/97 704 06/06/97 704 06/07/97 705 06/08/97 703 06/09/97 710 06/10/97 719 06/1 'I /97 714 06/12/97 708 06/13/97 708 06/14/97 706 06/15/97 708 06/16/97 706 06/17/97 701 06/18/97 698 06/19/97 698 08/20/97 699 06/21/97 699 06/22/97 704 06/23/97 709 06/24/97 706 06/25/97 704 06/26/97 702 08/27/97 700 06/28/97 700 06/29/97 699 06/30/97 697

DOCKET NO. 50-250 UNIT NAME TURKE PO NT UNI DATE I 2 1997 COMPLETED BY J E~Kgrr TELEPHONE 3 24-REPORTING PERIOD Jy~e~)~9 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 hlQ4~I D- IV
3. Number of Hours Reactor Was Critical 720.0 3293.4 148744.9
4. Number of Hours Generator Was On Line 720.0 3273.1 146624.2
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 507285.0 2211533.0 93371739.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Duration (Hours)

Reason'ethod of Event Code'omponent System Code'ause a corrective Action to Prevent Recurrence Reactor'icensee Shutting Report¹ Down N/A F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 - Manual for Preparation of Data 8 - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training a 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

RY F P R TI E P ERIE E DOCKET NO.

T:

~2'll DATE: Q~I2 1997 COMPLETED BY: J~K~nrr TELE EENE:

REPORT MONTH ~i 1997 Unit 3 operated at essentially 100% power for the month.

~ '

AVERAGE DAILY IT POWER LEVEL DOCKET NO. 50- 251 UNIT Turkey Point 44 DATE Jui 02, 1997 COMPLETED BY J. E. Knorr TELEPHONE (305) 346 - 6757 MONTH June, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe.Net) 06/01/97 703 06/02/97 707 06/03/97 703 06/04/97 701 06/05/97 701 06/06/97 701 06/07/97 702 06/08/97 700 06/09/97 706 06/10/97 708 06/11/97 702 06/12/97 695 06/13/97 694 06/14/97 691 06/15/97 691 06/16/97 692 06/17/97 688 06/18/97 682 06/19/97 ,683 06/20/97 683 06/21/97 684 06/22/97 690 06/23/97 694 06/24/97 691 06/25/97 690 06/26/97 688 06/27/97 686 06/28/97 685 06/29/97 684 06/30/97 682

OPERATING DATA REPORT DOCKET NO. 955251 UNIT NAME R EY OI T NIT 4 DATE JgJyg~99 COMPLETED BY TELEPHONE 5 6-REPORTING PERIOD Jgge~9',Q (MonthNear)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693
3. Number of Hours Reactor Was Critical 720.0 4269.0 145722.0
4. Number of Hours Generator Was On Line 720.0 4255.8 141421.8
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 499376.0 3005654.0 91054732.0

I Ill

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED=BY:

TELEPHONE:

REPORT MONTH No. Date Duration Reason'ethod Code'omponent System Cause & Corrective Action to (Hours) of Event Codes Prevent Recurrence Reactor'icensee Shutting Report()

Down N/A F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training & 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

4 Y F PiR TI P RIF E DOCKET NO. '2Sl UNIT: 2~Lkk DATE: ~12 1997 COMPLETE BY: ~EKn rr TELEPHONE:

r (302MJKZ REPORT MONTH ~E~I Unit 4 operated at essentially 100% power for the month.

~ ~