CATEGORY j.
REGULATO.
INFORMATION DISTRIBUTION STEM (RIDS) t ACCESGI/)N NBR:9702200231 DOC.DATE: 97/01/31 NOTARIZED: NO DOCKET FACIL:50-250,,Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 5$ -251;turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME'UTHOR AFFILIATION KNORR,J.E.
Florida Power
& Light Co.
HOVEY,R.J.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT'AFFILIATION
SUBJECT:
Monthly operating repts for Jan 1997 for Turkey Point, Units 2
& 4.W/970213 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 EXTERNAL: LITCO BRYCEgJ H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME CROTEAU,R LE CENTER 0
OC DBA PAD NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
U N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL.
'. 10
FEB 18 1997 L-97-39 10 CFR 550. 36 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4
Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the January, 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, R. J.
Hove Vice President Turkey Point Plant JEK Attachments cc:Luis A. Reyes, Regional Administrator, Region II, USNRC T. P.
- Johnson, Senior Resident Inspector,
- USNRC, Turkey Point Plant 9702 oo 8000250 t","g'pDR, AQGCK, 050
@DR R
<<t an FPL Group company
I I 'g
,( s')
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 01/01/97 01/02/97 01/03/97 01/04/97 01/05/97 01/06/97 01/07/97 01/08/97 01/09/97 01/10/97 01/11/97 01/12/97 01/13/97 01/14/97 01/15/97 01/16/97 01/17/97 01/18/97 01/19/97 01/20/97 01/21/97 01/22/97 01/23/97 01/24/97 01/25/97 01/26/97 01/27/97 01/28/97 01/29/97 01/30/97 01/31/97 710 710 712 712 612 631 708 711 701 718 725 727 728 730 393 0
552 732 738 737 733 726 723 718 720 723 721 719 716 634 483
0 I
OP ING DATAREPORT DOCKET NO DATE PREPARED BY TELEPHONE 50 -250 02/10/97 J. E. Knorr (605) 246-6757
- l. UNITNAME:
TURKEYPOINT UNIT3
- 2. REPORTING PERIOD:
JanuarY, 1997
- 3. UCENSED THERMALPOWER (MWQ:
2300
- 4. NAMEPLATERATING (GROSS MWE):
760
- 5. DESIGN ELECTRICALRATING (NET MWE):
720
- 6. MAXIMUMDEPE NDABLECAPACIIY(GROSS MWE):
726
- 7. MAXIMUMDEPENDABLE CAPACIlY(NET MWE):
693
- 8. IF CHANGES OCCUR IN CAPACllYRATINGS ( ITEMS NUMBER3 THROUGH 7 ) SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVELTO WHICH RESTRICTED, IF ANY(NET MWE)
- 10. RESONS FOR RESTRICTION. IF ANY:
- 11. HOURS IN REPORT PERIOD:
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-UNE
- 15. UNITRESERVE SHUTDOWN HOURS
- 16. GROSS THERMALENERGY GENERATED (MWH)
- 17. GROSS ELECTRICALENERGY GENERATED (MWH)
- 18. NET ELECTRICALENERGY GENERATED (MWH)
- 19. UNITSERVICE FACTOR
- 20. UNITAVAIIABIUIYFACTOR
- 21. CAPACllYFACTOR ( USING MDC NET)
- 22. CAPACIIYFACTOR ( USING DER NET )
- 23. UNITFORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT6 MONTHS:
Refueling scheduled in March 1997 MONTHLY 744')
721.7 0.0 714A 00 1581397 518174 494025 96J) 96.0 95.8 922 4.0
- YTD-744.0 721.7 00 714A OAI 1581397 518174 494025 960 96.0 95.8 922 4.0 CUMUlATIVE 211785 J) 1454772 844A 1434055 121 JI 299625291 96280584 91171112 67.7 67JI 64$
623 103
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH No.
Date Type Duration (Hours)
Reason Method of Shutting Down Reactor'icensee Event Reportf System Code Conponent
. code'ause 4 Corrective Action to Prevent Recurrence 1028 970105 0.0 N/A HB VALVEX
-TURBINE VALVE TEST 1029 970115 0.0 N/A CONROD POWER REDUCTION DUE TO DROPPED ROD 1032 970115 29.6 N/A RB CONROD SHUT DOWN DUE TO DROPPED ROD 1033 970130 0.0 N/A HH PUMPXX REPAIR OF MAIN FEEDWATER PUMP F - Forced S Scheduled Reason A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory restriction E Operator Training 4 License Exanination F Adninistrative G - Operational Error (Explain)
H Other (Explain)
Method 1 - Manual 2 - Manual Scran 3 Autonatic Scran 4 - continued 5 - Load Reduction 9 - Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
DOCKET NO.
UNIT:
DATE:
TELEPHONE:
REPORT MONTH Unit 3 began operation for the month at 100% reactor power.
Power was reduced to 40% for a turbine valve test on January 5.
Power was returned to 100% power the next day.
The unit remained at essentially 100% power until January 15.
That day, reactor power was reduced to approximately 60% due to a dropped rod.
Later on January 15, the reactor was shutdown to troubleshoot the cause of the dropped rod.
A reactor startup was begun on January 16 and the unit was returned to service later that day.
The unit reached 100% power on January 17, and continued at approximately that level until January 30.
Power was then reduced to approximately 54% to repair a steam generator feedwater pump.
The unit was returned to 100% power on January 31.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 01/01/97 01/02/97 01/03/97 01/04/97 01/05/97 01/06/97 01/07/97 01/08/97
,01/09/97 01/10/97 01/11/97 01/12/97 01/13/97 01/14/97 01/15/97 01/16/97 01/17/97 01/18/97 01/19/97 01/20/97 01/21/97 01/22/97 01/23/97 01/24/97 01/25/97 01/26/97 01/27/97 01/28/97 01/29/97 01/30/97 01/31/97 713 713 711 711 711 710 710 712 707 721 727 729 729 730 729 726 730 737 739 738 735 732 726 722 723 725 724 723 720 720 723
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY'ELEPHONE:
REPORT MONTH No.
Date Type'uration (Hours)
Reason Method of Shutting Down Reactor Licensee Event Reports System Code'omponent Code'ause S Corrective Action to Prevent Recurrence N/A F Forced S - Scheduled Reason A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training 4 License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 Continued 5 Load Reduction 9 - Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
~
~
OP ING DATAREPORT DOCKET NO DATE PREPARED BY TELEPHONE 50 -251 02/07/97 J.E. Knorr (305) 246-6757
- l. UNITNAME:
TURKEYPOINT UNff4
- 2. REPORTING PERIOD:
January, 1997
- 3. UCENSED THERMALPOWER (MVW):
2300
- 4. NAMEPlATERATING (GROSS MWE):
760
- 5. DESIGN ELECTRICALRATING (NET MWE):
720
- 6. MAXIMUMDEPENDABLE CAPACflY(GROSS MWE):
726
- 7. MAXIMUMDEPENDABLE CAPACIlY(NET MWE):
693
- 8. IF CHANGES OCCUR IN CAPACllYRATINGS ( ITEMS NUMBER3 THROUGH 7 ) SINCE LAST REPORT.
GIVE REASONS:
- 9. POWER LEVELTOWHICH RESTRICTED. IF ANY(NET MWE)
- 10. RESONS FOR RESTRICTION, IF ANY:
- 11. HOURS IN REPORT PERIOD:
- 12. NUMBEROF HOURS REACTOR WAS CRIHCAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-UNE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMALENERGY GENERATED (MWH)
- 17. GROSS ELECTRICALENERGY GENERATED (MWH)
- 18. NET ELECTRICALENERGY GENERATED (MWH)
- 19. UNITSERVICE FACTOR
- 20. UNITAVAILABILllYFACTOR
- 21. CAPACfIYFACTOR ( USING MDC NET)
- 22. CAPACflYFACTOR ( USING DER NET )
- 23. UNITFORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT6 MONTHS None MONTHLY 744A1 744A)
OAI 744AI 0.0 1708330 563255 538716 100A)
IOOA) 1045 100.6 OAI
- YfD-744.0 744AI 00 744A)
OAI 1708330 563255 538716 100AI 100AI 1045 100.6 OA)
CUMULATIVE 205517.0 141501.0 166.6 137214AI 5772 290722137 93020553 88107530 66.8 67A) 64.6 62.0 9AI
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DOCKET NO.
UNIT:
DATE'OMPLETE BY:
TELEPHONE:
REPORT MONTH Unit 4 operated at essentially 100% reactor power for the month.