ML17353A536

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr
ML17353A536
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1995
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-001, L-96-1, NUDOCS 9601230106
Download: ML17353A536 (18)


Text

CATEGORY 1 t REGULATOR INFORMATION DISTRIBUTION STEM (RIDE)

DOCKET g FACIL'.50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power & Light Co.

HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl repts for Dec 1995 for Turkey Point Units 3 6 4. /960112 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR / ENCL / SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 AXLE GENXZ~Ol 1 1 NRR/DRPM/PECB 1 1 RGN2 1 1 EXTERNAL; LITCO BRYCEFJ H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL NRIDSN RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL '.9

~ ~

'JAN I 3 993 L-96-001 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Nos. 50-250 and 50-251

'ocket In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the December 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, Robert J. Hovey Vice President Turkey Point Plant JEK Attachments cc: ST D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 960i230i06 95i23i

,PDRi,, "'ADOCK 05000250 PDR KE >V-oo FPL Group compooy I/ g

l

~ ~

J

(~U UOf'9>

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/95 696 12/02/95 698 12/03/95 697 12/04/95 694 12/05/95 689 12/06/95 691 12/07/95 690 12/08/95 688 12/09/95 690 12/10/95 690 12/11/95 701 12/12/95 704 12/13/95 700 12/14/95 695 12/15/95 693 12/16/95 691 12/17/95 691 12/18/95 692 12/19/95 692 12/20/95 690 12/21/95 698 12/22/95 704 12/23/95 706 12/24/95 705 12/25/95 712 12/26/95 710 12/27/95 709 12/28/95 708 12/29/95 707 12/30/95 705 12/31/95 701

I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH 0

No. Duration (Hours)

Reason* Yethod of Event Code'onponent Systen Code'ause 4 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Dawn Reportt N/A 2

F - Forced Reason Method Exhibit G - Instzuctions Exhibit - Sane Source S - Scheduled A - Equipnent Failure 1 - annal for Preparation of Data 1

B - Naintenance or Test 2 - Nanual Scran Entry Sheets Licensee C - Refueling 3 - Autonatic Scran Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training s 5 - Load Reduction License Exanination 9 - Other (Explain)

F - Adninistrative G - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 1/ 8/96 PREPARED BY J. E. KNORR TELEPHONE 305/246-6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: DECEMBER 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET  : 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITE~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, 1F ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 8760 202257.6
12. NUMBER OF HOURS REACTOR 744. 0 7927.6 136905.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 7847.1 134895.7
15. UNZT RESERVE SHUTDOWN HO 0.0 0.0 121.8 T~633 TEP63'085 ZKU3 1019
17. GROSS ELECTRZCAL ENERGY GENERATED (MWH) 543788 5475521 90236985
18. NET ELECTRICAL ENERGY GENERATED (MWH) 519263 5218969 85413396
19. UNIT SERVICE FACTOR 100.0 89.6 66.7
20. UNIT AVAILABIIITYFA 100.0 89.6 66.8
21. CAPACITY FACTOR (USING MD 104.8 89.5 64.4
22. CAPACITY FACTOR (USING DER NET) 100. 7 86.0 60.9
23. UNIT FORCED OUTAGE RATE 0.0 0.8 10.7
24. SHUTDOWNS SCHEDULED OVER NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

4 DOCKET NO.

UNIT:

~Mal DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 operated at essentially 100% reactor power for the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/95 695 12/02/95 694 12/03/95 694 12/04/95 690 12/05/95 688 12/06/95 686 12/07/95 687 12/08/95 687 12/09/95 686 12/10/95 685 12/11/95 695 12/12/95 698 12/13/95 695 12/14/95 690 12/15/95 688 12/16/95 687 12/17/95 686 12/18/95 686 12/19/95 687 12/20/95 687 12/21/95 692 12/22/95 697 12/23/95 699 12/24/95 701 12/25/95 708 12/26/95 707 12/27/95 705 12/28/95 703 12/29/95 703 12/30/95 702 12/31/95 699

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Type Duration (Hours)

Reason* Ynthod of Reactor'icensee Shutting Event ReportS code'omponent Syste~ code'ause c Corrective Action to Prevent Recurrence Dovn N/A P Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Pailure 1 - Nanual for Preparation of Data B - Naintenance or Test 2 - Nanual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) Pile D - Regulatozy restriction 4 - Continued (NUREC-0161)

E - Operator Training C 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative O - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 251 DATE 1/ 8/96 PREPARED BY J. E. KNORR TELEPHONE 305/246<<6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: DECEMBER 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET  : 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MRE~ 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITER~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.. I

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 8760 195989.0
12. NUMBER OF HOURS REACTOR 744.0 8638.1 133485.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 744.0 8629.6 129393.2
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2
16. GROSS THERMAL ENERGY GENERA T6.%559 TFTPj54 8 2TSE73257
17. GROSS ELECTRICAL ENERGY GENERATED (MWHJ 541573 6090491 87539141
18. NET ELECTRICAL ENERGY GENERATED (MWH) 517201 5805329 82884915
19. UNIT SERVICE FACTOR 100.0 98.5 66.0
20. UNIT AVAILABILITYFA 100.0 98.5 66.3
21. CAPACITY FACTOR (USING MD 104.4 99.5 64.4
22. CAPACITY FACTOR (USING DER NET) 100.3 95.6 61.0
23. UNIT FORCED OUTAGE RATE 0.0 1.5 10.4
24. SHUTDOWNS SCHEDULED OVER REFUELING SCHEDLUED IN MARCH 1996
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

~ ~

~ ~

DOCKET NO.

UNIT DATE

. COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100% reactor power for the month.

l g