ML17353A730

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr
ML17353A730
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/31/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-153, NUDOCS 9606200012
Download: ML17353A730 (16)


Text

CATEQOHY j.

REGULATORINFORMATION DISTRIBUTION SYSTEM (RIDE)

ACCESSION'BR:9606200012 DOC.DATE: 96/05/31 NOTARIZED: NO DOCKET g FACIL:50-'50 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.N~P AUTHOR AFFILIATION KNORR,J.E. Florida Power a Light Co.

HOVEYFR.J. Florida Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for May 1996 for Turkey Point Units 3 6 4.W/960612 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT . COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 F LE CENTER 1 1 1 NRR/DRPM/PECB 1 RGB 1 1 EXTERNAL: LITCO BRYCEFJ H 1 NOAC 1 1 NRC PDR 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUiRED: LTTR 9 ENCL 9

~ ~

JUN 1 r >99S L-96-153 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:-

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5 and the guidance of NUREG-0020, attached are the May 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours,

/Ml R. J. Hov y Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant KWY'00042 9bob2000i2 qb50000250 PDR ADOCK 0 an FPL Gioop company

S ~-

~

~

E

~ 5

~

P j

AVERAGE DAILY IT POWER LEVEL DOCKET NO. 50-250 UNIT Turkey Point t3 DATE Jun 11, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246- 6757 MONTH ~Ma, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/96 681 05/02/96 674 05/03/96 680 05/0496 680 05/05/96 682 05l06/96 682 05/07$ 6 684 05/08$ 6 684 05/09/96 685 05/10$ 6 686 05/11/96 684 05/12/96 681 05/13/96 669 05/14$ 6 669 05/15/96 675 05/16/96 678 05/17/96 679 05l18/96 684 05/19/96 683 05/20/96 679 05/21/96 686 05/22/96 686 05/23/96 679 05/24/96 678 05/25/96 677 05/26/96 676 05/27/96 674 05/28/96 674 05/29/96 675 05/30/96 669 05/31/96 675

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: ~ur e Point ¹3 DATE une COMPLETED BY norr TELEPHONE:

REPORT MONTH M~a 1996 No. Date Duration (Hours)

Reasona Hethod of Shutting Licensee Event Reports Code'omponent System Code'ause 4 Corrective Action to Prevent Recurrence Down Reactora N/A 4

F -- Forced Reason

- Hethod Exhibit G - 1nstructions Exhibit 1 - Same Source S Scheduled A Equipment Failure 1 - Hanual for Preparation of Data B - Haintenance or Test 2 - Hanual Scram Entry Sheets Licensee C -- Refueling 3 -

- Automatic Scram Event Report (LER) File D

- Regulatory restriction 4

- Continued (NVREG-0161)

E Operator Training 4 5 Load Reduction License Examination 9 - Other (Explain)

F -- Administrative G Operational Error (Explain)

H - Other (Explain)

iI e

OPE G DATA REPORT DOCKET NO 60 -250 DATE 06/11/96 PREPARED BY J. E. Knorr

'-TELEPHONE (305) 2464757

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: May, 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUMDEPENDABLE CAPACITY(GROSS MWE): 699
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD - CUMULATIVE

11. HOURS IN REPORT PERIOD: 744.0 3647.0 205904.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3476.9 140382.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 3443.1 138338.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
18. GROSS THERMAL ENERGY GENERATED (MWH) 1632301 7371854 288402873
17. GROSS ELECTRICAL ENRGY GENERATED (MWH) 529560 2421263 92658248
18. NET E'CTRICAL ENRGY GENERATED (MWH) 505194 2305097 87718493
19. UNIT SERVICE FACTOR 100.0 94.4 67.2
20. UNIT AVAILABILITY FACTOR 100.0 94.4 67.2
21. CAPACITY FACTOR ( USING MDC NET ) 102.0 94.9 64.0
22. CAPACITY FACTOR ( USING DER NET ) 98.0 91.2 61.5
23. UNIT FORCED OUTAGE RATE 0.0 10.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

0 S

(

DOCKET NO. K}=252 UNIT:

DATE:

TELEPHONE:

REPORT MONTH ~~ reactor power for the month Unit 3 operated at approximately 100%

of May 1996.

AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point I/4 DATE Jun 11 1996

~

COMPLETED BY J. f. Knorr TELEPHONE (305) 246- 6757 MONTH ~Ma,1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01 $6 665 05/02$ 6 660 05/03/96 665 05/04/96 666 05/05$ 6 665 05/06/96 663 ~

05/07/96 653 .

05/08/96 666 05/09/96 670 05/10/96 667 05/11$ 6 668 05/12/96 666 05/13$ 6 659 05/14/96 661 05/15/96 663 05/16/96 667 05/17$ 6 668 05/18/96 670 05/19/96 668 05/20/96 667 05/21/96 671 05/22$ 6 671 05/23/96 666 05/24$ 6 664 05/25/96 663 05/26/96 661 05/27$ 6 660 05/28/96 660 05/29/96 661 05/30/96 663 05/31/96 659

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNXT NAME: ~ur e Point 04 DATE: une COMPLETED BY: . . orr .

REPORT MONTH M~a1996 Ho. Date Typet Duration (Hours)

Reasone Method of Shutting Licensee Event Reportf Sgsten Code'ause Conponent 4 Corrective Action to Prevent Recurrence Down Reactore N/A F -- Forced Reason

- Method Exhibit - Instructions Exhibit - Sane Source 1 - Manual G 1 S Scheduled A Equipment Failure for Preparation of Data B - Maintenance or Test 2 - Manual Scr4un Entry Sheets Licensee C - Refueling 3 - Autonatic ScraEL Event Report (LER) File D - Regulatory restriction 4 - Continued (HVREG-0161)

E - Operator Training 4 5 - Load Reduction License Exaaination 9 - Other (Explain)

F - Adxtinistrative G - Operational Error (Expla'in)

H - Other (Explain)

t o't

OPE G DATA REPORT DOCKET NO 60 -261 DATE 06/11I96 PREPARED BY J. E. Knorr TELEPHONE (306) 2464767

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: May, 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICALRATING (NET MWE): 693
6. MAXIMUMDEPENDABLE CAPACITY(GROSS MWE): 699
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744.0 3647.0 199636.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2831.1 136316.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 744.0 2764.7 132167.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 677.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1630179 6834608 279607766
17. GROSS ELECTRICAL ENRGY GENERATED (MWH) 618780 1893808 89432949
18. NET EI.ECTRICAL ENRGY GENERATED (MWH) 494326 1798968 84683873
19. UNIT SERVICE FACTOR 100.0 76.8 66.2
20. UNIT AVAILABILITY FACTOR 100.0 76.8 66.6
21. CAPACITY FACTOR ( USING MDC NET ) 99.8 74.1 63.7
22. CAPACITY FACTOR ( USING DER NET ) 96.9 71.2 61.2
23. UNIT FORCED OUTAGE RATE 0.0 1.0 10.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT DATE:

COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at approximately g~~

1004 reactor power for the month of May 1996.

4 Ia ll