CATEGORY 1 REGUDRT INFORMATION DISTRIBUTIONOCSTEM (RIDE)

I H ACCESSION NBR:9611210008 DOC.DATE: 96/10/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida, Power and Light C 05000250 50;251 Turkey Point Plant, Unit 4, Florida Power and Light C, 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power & Light Co.

HOVEY,R.J. Florida Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Oct 1996 for Turkey Point, Units 1 & 2.W/961113 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIUED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CE 1 1 NRR/DRPM/PECB 1 1 -C7' PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

V NOV] 31999 L-96-306 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort, In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the October 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. Please note that Thermal Power was increased from 2200 to 2300 MW on each unit during the month.

Maximum dependable capacity values have been approximated pending further testing. A revised October report will be provided changes in these values are made.

if significant Very truly yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc:S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9hii2i0008 96i03i PDR ADQCK 05000250 R

<UU>vu an FPL Group company

0 k

II J P

AVERAGE DAI NIT POWER LEVEL DOCKET NO. 50-250 UNIT Turkey Potnt 03 DATE Nov 08, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONTH October, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/96 676 10/02/96 678 10/03/96 677 10/0496 677 10/05/96 678 10/0$ 96 678 10/07/96 674 10/08/96 675 10/09/96 673 10/10/96 672 10/11/96 693 10/12/96 715 10/13/96 718 10/14/96 715 10/15/96 714 10/16/96 712 10/17/96 707 10/18/96 706 10/19/96 709 10/20/96 715 10/21/96 713 10/22/96 711 10/23/96 709 10/24/96 708 10/25/96 708 10/26/96 710 10/27/96 710 10/28/96 711 10/29/96 711 10/30/96 707 10/31/96 704

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point 3 DATE: November 8 1996 COMPLETED BY: Z. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH October 1996 No. Date Duration Reason Hethod of Licensee system ccoyonent Cause S Corrective Action to (Hours) Shutting Event Code4 Code> Prevent Recurrence Dawn Reports Reactor3 N/A 1 2 3 4 5 F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NVREG-0161) restriction 5 - Load Reduction E - Operator Training & 9 - Other (Explain)

License Examination F - Administrative G Operational Error

{Explain)

H - Other (Explain)

OPE ING DATA REPORT DOCKET NO 50 -250 DATE 11/08/96 PREPARED BY J. E. Knorr TELEPHONE (306) 2464767

t. UNIT NAME:

'. TURKEY POINT REPORTING PERIOD: October, 1996 UNIT 3

3. LICENSED THERMAL POWER (MWT): 2300
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICALRATING (NET MWE): 723
6. MAXIMUMDEPENDABLE CAPACITY(GROSS MWE): 729
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 696
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: Ratings have changed due to an NRC approved Increase In Thermal Power. Net capacity ratings are approximate pending further testing.
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 745.0 7320.0 209577.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7081.6 143987.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 745.0 7027.4 141923.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1683292 15186257 296217276
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 545254 4929709 95166694
18. NET ELECTRICAL ENERGY GENERATED (MWH) 520632 4693761 90107147
19. UNIT SERVICE FACTOR 100.0 96.0 67.7
20. UNIT AVAILABILITY FACTOR 100.0 96.0 67.8
21. CAPACITY FACTOR (USING MDC NET) 101.9 96.0 61.9
22. CAPACITY FACTOR ( USING DER NET ) 98.0 92.3 59.5
23. UNIT FORCED OUTAGE RATE 0.0 4.0 10.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

Refueling scheduled for March 1997

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

t

SUMMARY

OF OPERATING EXPERIENCE l

DOCKET NO. 50-250 UNIT Turke Point ¹3 DATE: November 8, 1996 COMPLETED J. E. Knorr BY'ELEPHONE:

(305) 246-6757 REPORT MONTH October 1996 Unit 3 operated at approximately 100$ reactor power through the month of October. Thermal power was increased from 2200 MW to 2300 MW on October 11, 1996.

AVERAGE DAI NIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Potnt ¹4 DATE Nov 08, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246 - 6757 MONTH October, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/96 668 10/02/96 669 10/03/96 669 10/04/96 670 10/05/96 670 10/06/96 671 10/07/96 592 10/08/96 495 10/09/96 556 10/10/96 669 10/11/96 675 10/12/96 575 10/13/96 679 10/14/96 679 10/15/96 679 10/16/96 676 10/17/96 '73 10/18/96 671 10/19/96 674 10/20/96 678 10/21/96 523 10/22/96 0 10/23/96 0 10/2496 0 10/25/96 627 10/26/96 685 10/27/96 680 10/28/96 683 10/29/96 701 10/30/96 708 10/31 $ 6 708

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: ¹ Turkey Point 4 DATE: Nov 08, 1996 COMPLETED BY: J. E. Knorr REPORT MONTH OCTOBER 1996 TELEPHONE: (305) 2466757 No. Date Type Duration Reason Method of Licensee System Component Cause and Corrective (Hours) 2 Shutting Dovm Event Code Code Action to 1

Reactor Report ¹ 4 5 Prevent Recurrence:

00001024 10/07$ 6 0.0 N/A VALVEX Feedwater heater tube side relief valve liftand repair 00001025 10/09$ 6 0.0 RB INSTRU RPI versus Demand Counter realignment 00001026 10/1286 0.0 N/A CH VALVEX Replacement of Steam Generator Feed Pump relief valve after failure 00001027 10/21 $6 73.8 HTEXCH Isolated the 2A feedwater heat exchanger and plugged tubes

1. F Forced 2. A - Equipment Failure (Explain) 3. 1-Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preperation of Data Entry C - Refueling 3- Automatic Scram Sheets Licensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161)

E - Operator Training LIcense Examination 5- Load Reduction F - Administraitive 5.

G - Operational Error (Explain) 9- Other (Explain) Exibit I - Same Source H - Other (Explain)

\

LI

I OPENING DATA REPORT DOCKET NO 60 -251 DATE 11/08/96 PREPARED BY J. E. Knorr TELEPHONE (305) 2464757 1.UNITNAME: TURKEY POINT UNIT4

2. REPORTING PERIOD: October, 1996
3. LICENSED THERMAL POWER (MWT): 2300
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICALRATING (NET MWE): 723
6. MAXIMUMDEPENDABLE CAPACITY(GROSS MWE): 729
7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 696

, B. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS: Ratings have changed due to an NRC approved increase in Thermal Power. Net capacity ratings are approximate pending further testing.

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 745.0 7320.0 203309.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6503.2 139989.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 671.2 6308.8 135702.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1436606 13506775 287180032
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 462336 4322698 91861839
18. NET ELECTRICAL ENERGY GENERATED (MWH) 438687 4109406 86998820
19. UNIT SERVICE FACTOR 90.1 86.2 66.7
20. UNIT AVAILABILITY FACTOR 90.1 86.2 67.0
21. CAPACITY FACTOR ( USING MDC NET ) 88.1 84.3 61.6
22. CAPACITY FACTOR ( USING DER NET) 84.7 81.0 59.3
23. UNIT FORCED OUTAGE RATE 0.0 0.4 9.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

f

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

(s Z

' ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT'ATE:

Turke Point ¹4 November 8, 1996 COMPLETE J. E. Knorr BY'ELEPHONE:

(305) 246-6757 REPORT MONTH October 1996 Unit 4 operated at approximately 100% reactor until October 7, 1996.

Power was reduced to less than 80% to repair a feedwater heater relief valve. During the subsequent return to 100$ power on October 9, a rod position indication misalignment with demand position was realigned and 100% power was reached late that day. Power was reduced to less than 608 power to replace a failed steam generator feedwater, pump suction relief valve on October 12. Power was returned to 100% early the next morning.

On the evening of October 21, the plant was taken to Mode 2 for plugging of tubes in the 2A feedwater heater. The plant was returned to the grid on October 24 and reached 100% power early on October 25. Thermal power was increased from 2200 MW to 2300 MW on October 29, 1996. The plant operated at essentially 100% power through the end of the month.

0 ~