Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr 05000250/LER-1998-006-02, :on 981006,unescorted Access Was Granted to Contractor Employee Who Falsified Background Info.Caused by Individual Who Knowingly Provided False Info.Denied Access to Individual on 981006.With1998-10-27027 October 1998
- on 981006,unescorted Access Was Granted to Contractor Employee Who Falsified Background Info.Caused by Individual Who Knowingly Provided False Info.Denied Access to Individual on 981006.With
ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. 05000250/LER-1998-005-02, :on 980924,suspended Safeguards During Severe Weather Due to Personnel Safety.Caused by Severe Weather Associated with Effects of Hurricane Georges.Fully Instituted Compensatory Measure.With1998-10-16016 October 1998
- on 980924,suspended Safeguards During Severe Weather Due to Personnel Safety.Caused by Severe Weather Associated with Effects of Hurricane Georges.Fully Instituted Compensatory Measure.With
ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr 1999-09-30
[Table view] |
Text
CATEGORY 1 REGUDRT INFORMATION DISTRIBUTIONOCSTEM (RIDE)
I H ACCESSION NBR:9611210008 DOC.DATE: 96/10/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida, Power and Light C 05000250 50;251 Turkey Point Plant, Unit 4, Florida Power and Light C, 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power & Light Co.
HOVEY,R.J. Florida Power a Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Oct 1996 for Turkey Point, Units 1 & 2.W/961113 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIUED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CE 1 1 NRR/DRPM/PECB 1 1 -C7' PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D
NOTE TO ALL NRIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
V NOV] 31999 L-96-306 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort, In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the October 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. Please note that Thermal Power was increased from 2200 to 2300 MW on each unit during the month.
Maximum dependable capacity values have been approximated pending further testing. A revised October report will be provided changes in these values are made.
if significant Very truly yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc:S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9hii2i0008 96i03i PDR ADQCK 05000250 R
<UU>vu an FPL Group company
0 k
II J P
AVERAGE DAI NIT POWER LEVEL DOCKET NO. 50-250 UNIT Turkey Potnt 03 DATE Nov 08, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONTH October, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/96 676 10/02/96 678 10/03/96 677 10/0496 677 10/05/96 678 10/0$ 96 678 10/07/96 674 10/08/96 675 10/09/96 673 10/10/96 672 10/11/96 693 10/12/96 715 10/13/96 718 10/14/96 715 10/15/96 714 10/16/96 712 10/17/96 707 10/18/96 706 10/19/96 709 10/20/96 715 10/21/96 713 10/22/96 711 10/23/96 709 10/24/96 708 10/25/96 708 10/26/96 710 10/27/96 710 10/28/96 711 10/29/96 711 10/30/96 707 10/31/96 704
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point 3 DATE: November 8 1996 COMPLETED BY: Z. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH October 1996 No. Date Duration Reason Hethod of Licensee system ccoyonent Cause S Corrective Action to (Hours) Shutting Event Code4 Code> Prevent Recurrence Dawn Reports Reactor3 N/A 1 2 3 4 5 F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NVREG-0161) restriction 5 - Load Reduction E - Operator Training & 9 - Other (Explain)
License Examination F - Administrative G Operational Error
{Explain)
H - Other (Explain)
OPE ING DATA REPORT DOCKET NO 50 -250 DATE 11/08/96 PREPARED BY J. E. Knorr TELEPHONE (306) 2464767
- t. UNIT NAME:
'. TURKEY POINT REPORTING PERIOD: October, 1996 UNIT 3
- 3. LICENSED THERMAL POWER (MWT): 2300
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICALRATING (NET MWE): 723
- 6. MAXIMUMDEPENDABLE CAPACITY(GROSS MWE): 729
- 7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 696
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: Ratings have changed due to an NRC approved Increase In Thermal Power. Net capacity ratings are approximate pending further testing.
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. RESONS FOR RESTRICTION, IF ANY:
MONTHLY - YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 745.0 7320.0 209577.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7081.6 143987.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE 745.0 7027.4 141923.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1683292 15186257 296217276
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 545254 4929709 95166694
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 520632 4693761 90107147
- 19. UNIT SERVICE FACTOR 100.0 96.0 67.7
- 20. UNIT AVAILABILITY FACTOR 100.0 96.0 67.8
- 21. CAPACITY FACTOR (USING MDC NET) 101.9 96.0 61.9
- 22. CAPACITY FACTOR ( USING DER NET ) 98.0 92.3 59.5
- 23. UNIT FORCED OUTAGE RATE 0.0 4.0 10.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
Refueling scheduled for March 1997
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
t
SUMMARY
OF OPERATING EXPERIENCE l
DOCKET NO. 50-250 UNIT Turke Point ¹3 DATE: November 8, 1996 COMPLETED J. E. Knorr BY'ELEPHONE:
(305) 246-6757 REPORT MONTH October 1996 Unit 3 operated at approximately 100$ reactor power through the month of October. Thermal power was increased from 2200 MW to 2300 MW on October 11, 1996.
AVERAGE DAI NIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Potnt ¹4 DATE Nov 08, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246 - 6757 MONTH October, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/96 668 10/02/96 669 10/03/96 669 10/04/96 670 10/05/96 670 10/06/96 671 10/07/96 592 10/08/96 495 10/09/96 556 10/10/96 669 10/11/96 675 10/12/96 575 10/13/96 679 10/14/96 679 10/15/96 679 10/16/96 676 10/17/96 '73 10/18/96 671 10/19/96 674 10/20/96 678 10/21/96 523 10/22/96 0 10/23/96 0 10/2496 0 10/25/96 627 10/26/96 685 10/27/96 680 10/28/96 683 10/29/96 701 10/30/96 708 10/31 $ 6 708
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: ¹ Turkey Point 4 DATE: Nov 08, 1996 COMPLETED BY: J. E. Knorr REPORT MONTH OCTOBER 1996 TELEPHONE: (305) 2466757 No. Date Type Duration Reason Method of Licensee System Component Cause and Corrective (Hours) 2 Shutting Dovm Event Code Code Action to 1
Reactor Report ¹ 4 5 Prevent Recurrence:
00001024 10/07$ 6 0.0 N/A VALVEX Feedwater heater tube side relief valve liftand repair 00001025 10/09$ 6 0.0 RB INSTRU RPI versus Demand Counter realignment 00001026 10/1286 0.0 N/A CH VALVEX Replacement of Steam Generator Feed Pump relief valve after failure 00001027 10/21 $6 73.8 HTEXCH Isolated the 2A feedwater heat exchanger and plugged tubes
- 1. F Forced 2. A - Equipment Failure (Explain) 3. 1-Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preperation of Data Entry C - Refueling 3- Automatic Scram Sheets Licensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161)
E - Operator Training LIcense Examination 5- Load Reduction F - Administraitive 5.
G - Operational Error (Explain) 9- Other (Explain) Exibit I - Same Source H - Other (Explain)
\
LI
I OPENING DATA REPORT DOCKET NO 60 -251 DATE 11/08/96 PREPARED BY J. E. Knorr TELEPHONE (305) 2464757 1.UNITNAME: TURKEY POINT UNIT4
- 2. REPORTING PERIOD: October, 1996
- 3. LICENSED THERMAL POWER (MWT): 2300
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICALRATING (NET MWE): 723
- 6. MAXIMUMDEPENDABLE CAPACITY(GROSS MWE): 729
- 7. MAXIMUMDEPENDABLE CAPACITY (NET MWE): 696
, B. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS: Ratings have changed due to an NRC approved increase in Thermal Power. Net capacity ratings are approximate pending further testing.
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. RESONS FOR RESTRICTION, IF ANY:
MONTHLY - YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 745.0 7320.0 203309.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6503.2 139989.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LINE 671.2 6308.8 135702.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1436606 13506775 287180032
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 462336 4322698 91861839
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 438687 4109406 86998820
- 19. UNIT SERVICE FACTOR 90.1 86.2 66.7
- 20. UNIT AVAILABILITY FACTOR 90.1 86.2 67.0
- 21. CAPACITY FACTOR ( USING MDC NET ) 88.1 84.3 61.6
- 22. CAPACITY FACTOR ( USING DER NET) 84.7 81.0 59.3
- 23. UNIT FORCED OUTAGE RATE 0.0 0.4 9.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
f
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
(s Z
' ~
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT'ATE:
Turke Point ¹4 November 8, 1996 COMPLETE J. E. Knorr BY'ELEPHONE:
(305) 246-6757 REPORT MONTH October 1996 Unit 4 operated at approximately 100% reactor until October 7, 1996.
Power was reduced to less than 80% to repair a feedwater heater relief valve. During the subsequent return to 100$ power on October 9, a rod position indication misalignment with demand position was realigned and 100% power was reached late that day. Power was reduced to less than 608 power to replace a failed steam generator feedwater, pump suction relief valve on October 12. Power was returned to 100% early the next morning.
On the evening of October 21, the plant was taken to Mode 2 for plugging of tubes in the 2A feedwater heater. The plant was returned to the grid on October 24 and reached 100% power early on October 25. Thermal power was increased from 2200 MW to 2300 MW on October 29, 1996. The plant operated at essentially 100% power through the end of the month.
0 ~
. <X l