ML17056B318

From kanterella
Revision as of 06:41, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jan 1989 for Nine Mile Point Nuclear Station Unit 1
ML17056B318
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 01/31/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200138
Download: ML17056B318 (2)


Text

'PERATING DATA REPORT DOCKET NO.: 50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit //I
2. Reporting Period: 1/1/89 through I/31/89 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744.0 744.0 169,873.2
12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
14. Hours Generator On-Line 0.0 0.0 112,117.2
15. Unit Reserve Shutdown Hours ,, 0.0 0.0 20.4
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0
19. Unit Service Factor 0.0 0.0 66.0
20. Unit Availability Factor 0.0 0.0 66.0
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 58.4
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 57.5
23. Unit Forced Outage Rate 0.0 0.0 14.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuel outa e started on anuar 22 1 88.

25. IfShut Down At End of Report Period, Estimated Date of Startup: Indeterminate
26. Unit is Test Status (Prior to Commercial Operation): . Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 9i02200i$ 8 9i0207 05000220 PDR ADOCK PDR R

(>

h k