Forwards Safety Evaluation & EGG-NTA-8341 on Generic Ltr 83-28,Item 4.5.3 Re Reactor Trip Sys Reliability.Existing Intervals for on-line Functional Testing of Reactor Trip Sys Consistent W/Achieving High Reactor Trip Sys Availability
ML20247J720
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/25/1989
From: Paulson W
Office of Nuclear Reactor Regulation
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20247J729 List:
References
GL-83-28, TAC-61035, NUDOCS 8906010114
Download: ML20247J720 (3)


Text

,-

u i

Dy d g

E(paasc (o, -

( ,g UNITED STATES NUCLEAR REGULATORY COMMISSION

, ' g/ . p WASHINGTON, D. C. 20555 i

May 25,1989

! , \ ... A/

i Docket No. 50-458 Gulf States Utilities ATTN: Mr. James C. Deddens Senior Vice President (RBNG)

Post Office Box 220 St. Francisville, Lou lsiana 70775

Dear Mr. Deddens:

SUBJECT:

RIVER BEND STATION - GENERIC LETTER 83-28, ITEM 4.5.3 -

REACTOR TRIP SYSTEM REilABILITY - INTERVALS FOR ON-LINE FUNCTIONALTESTING-(TACNO.6I035)

Tne NRC staff has completed its review of the above subject it.em in Generic Letter 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Based on the review of the Owner Groups' analyses, including the BWR Owners Group, the independent analysis performed by the staff's contractrar, Idaho National Engineering Laboratory, and the findings noted in NUREG-0460, Anticipated Transients Without Scram for Light Water Reactors, the staff finds that existing intervals for on-line functional testing of the reactor trip system are consistent with achieving high reactor trip system availability.

This completes the staff's action for Item 4.5.3 of Generic Letter 83-28.

Copies of the related safety evaluation and the Technical Evaluation Report prepared by the staff's contractor, Idaho National Engineering Laboratory, are enclosed. By letter dated November 23, 1988, the staff inferred you that actior for Item 4.5.2 of Generic Letter 83-28 had been completed.

Sincerely, ,,

(hbW Walter A. Paulson, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosures:

As stated cc w/ enclosures:

See next page

/\

rO t

8906010114 890525 .

DR ADOCK 0500 B.

  • ~

May 250 1989 Docket No. 50-458

. Gulf States Utilities ATTN: Mr. James C. Deddens Senior Vice President (RBNG)

Post Office Box 220 St. Francisville, Louisiana 70775

Dear Mr. Deddens:

SUSJECT: RIVER BEND STATION - GENERIC LETTER 83-28, ITEM 4.5.3 -

REACTOR TRIP SYSTEM RELIABILITY - INTERVALS FOR ON-LINE FUNCTIONAL TESTING (TAC NO. 61035)

The NRC staff has completed its review of the above subject item in Generic Letter 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Based on the review of the Owner Groups' analyses, including the BWR Owners Group, the independent analysis perfomred by the staff's contractor, Idaho National Engineering Laboratory, and the findings noted in NUREG-0460, Anticipated Transients Without Scram for Light Water Reactors, the staff finds that existing intervals for on-line functional testing of the reactor trip system are consistent with achieving high reactor trip system availability.

This completes the staff's action for Item 4.5.3 of Generic Letter 83-28.

Copies of the related safety evaluation and the Technical Evaluation Report prepared by the staff's contractor, Idaho National Engineering Laboratory, are

-enclosed. By letter dated November 23, 1988, the staff informed you that '

action for Item 4.5.2 of Generic Letter 83-28 had been completed.

Sincerely,

/s/

Walter A. Paulson, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation l

Enclosures:

j As stated l

cc w/e./;losures:

See next page

. DISTRIBUTION

-Dociet File:' NRC PDR Local PDR PD4 Reading G. Holahan" L. Rubenstein F. Hebdon E. Jordan l P. Noonan W. Paulson OGC-Rockville B. Grimes ACRS (10) PD4 Plant File DOCUMENT NAME: RB LTR/ TAC 610.5 PD4/LA i PD ef PNoona J WPaulson:bj fHebdon Op /89 05/1)/89 05/Jr/89

- __ _- _ i

yy ,

2. -  : .

3 kyi 4 ' (

r --

' Mr. . James C. Deddens-Gulf States. Utilities Company River Bend Nuclear Plant I

?

cc:

Troy B. Conner Jr., Esq. . Mr. J. E. Booker.

Conner and Wetterhahn Manager-River Bend Oversight 1747 Pennsylvania Avenue, NW P. O. Box 2951

-Washington, D.C. 20006 Beaumont, TX 77704 Mr. Les England: Mr. William H. Spell. Administrator Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Office of Environmental ~ Affairs P. 0. Box 220 P. O. Box 14690

~St. Francisville, LA 70775 Baton Rouge, Louisiana -70898 o Richard M. Troy, Jr. , Esq.

L- Assistant Attorney General in Charge Mr. J.~ David McNeill, III State of Louisiana Department of Justice William G. Davis, Esq.

~234-Loyola Avenue- Department of Justice

~ New Orleans, Lcuisiana 70112 Attorney General's Office 7434 Perkins Road Resident Inspector Baton Rouge, Lcuisiana 70808

.P. 0.-Box 1051 St. Francisville, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive Gretchen R. Rothschild-Reinike Baton Rouge,. Louisiana 70806 Louisianians for. Safe Energy,, Inc.

2108' Broadway Street-New Orleans, Louisiana 70118-5462 President of West Feliciana Police Jury Regional Administrator, Region IV P. O. Box 1921 U.S. Nuclear Regulatory Commission St. Francisville, Louisiana 70775 Office of Executive Director for Operations Mr. Frank J. Uddo 611 Ryan Plaza Drive, Suite 1000 Uddo & Porter Arlington, Texas 76011 6305 Elysian Fields Avenue Suite 400-Philip G.' Harris New Orleans, Louisiana 70122 Cajun Electric Power Coop. Inc.

10719 Airline Highway P. O. Box 15540 Baton Rouge, LA 70895 1

i