ML20246E478

From kanterella
Revision as of 21:44, 18 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-461/89-03.NRC Understands That Util to Provide Amended Response Addressing Listed Items by 890721,per 890629 & 30 Telcons
ML20246E478
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/06/1989
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hall D
ILLINOIS POWER CO.
Shared Package
ML20246E485 List:
References
NUDOCS 8907120255
Download: ML20246E478 (2)


See also: IR 05000461/1989003

Text

__ __ - _ _ _ _ __ _ __-

_ _ _ - - _ - - -

p

.. ..-

s ' (
-

h

6

W

JUL'6 1989

>-

L Docket No. 50-461

Illinois Power Company

ATTN: Mr. D. P. Hall.

E

'

.

. Executive Vice President

L500 South 27th Street

Decatur IL' 62525

l' Gentlemen:

Thank you for your letter dated June 14, 1989, informing us of the steps you

.have taken to correct the~ violation that we brought to your attention in our

letter dated May 12, 1989.

,We-have reviewed your response to violation 461/89003-01 and consider the-

response acceptable for examples D and E.- However, based on our telephone

h

conversations with Messrs. Holtzscher, Wilson, and others of your staff, on

June 29 and 30, 1989,~we understand that you will provide an amended response

by July 21, 1989, which addresses the following:

l 1. Overall action taken by management to ensure or'substantially improve

procedural compliance at the Clinton Power Station.

'

s

2. iAdditional action to be taken on the first example of the violation,

(461/89003-01A) to ensure that current revisions to documents are included

in MWR packages and that work is performed in accordance with them. We

understand that this amended response will include:

-

evaluation of a computerized system to track document utilization /

location to allow for periodic review and updating of their

currency.

l

-

a schedule for development and implementation of the new computerized

tracking system.

-

the procedures that will.be used in the interim fore the

computerized system is fully implemented.

l 3. . A clarification of the sequence of events involved with the second and

third examples of the violation, 461/89003-01B and 461/89003-01C, including

1 pertinent details that describe how procedural requirements were met.

Based on information supplied by telephone in the referenced conversations,

and acceptable additional clarifications, we will rescind examples B and C

of this violation. Please note that the information supplied in your response

and in'the telephone conversations was not consistent with the information

provided to the inspector and the inspection team during the inspection.

Adequate investigation and clarification of these issues by your staff at

that time could have avoided unnecessary discussions and paper work.

890712O255 890706 i(

FDR ADOCK 05000461

O FDC O v,()]

___

. .

,

-

.

,

Illinois Power Company 2 JUL 6 1989

l

Although the information provided in the response to the last example of the

violation, 461/89003-OlF, appears to differ from that supplied to the inspector

during previous discussions, we consider the response acceptable.

We will examine these matters further during a future inspection.

Sincerely,

[DRIGINAL SIGNED BY. HUBERT J. MILLER

H. J. Miller, Director

Division of Reactor Safety

cc: J. S. Perry, Assistant

Vice President

R. D. Freeman, Manager,

Nuclear Station

Engineering Department

cc w/ltr dtd 06/14/89:

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

J.'W. McCaffrey, Chief, Public

Utilities Division

H. 5. Taylor, Quality Assurance

Division, Sargent & Lundy

Engineers

David Rosenblett, Governor's

Office of Consumer Services

Sheldon Zabel, Esquire,

Schiff, Hardin, & Waite

L. Larson, Project Manager,

General Electric Company

Chairman of DeWitt County

Illinois Department of

Nuclear Safety

D. Schopfer, Project Manager,

Sargent & Lundy Engineers

Y$

RI RI 'I RI RIII y

Y

alker/jk Ja nski

UA5

Grobe

Y Ah

RIIIr

Cooper Iiller

07/05/89 Rngh89

07/o 07 /89 07/5/89 07/05/89 07/gj789

_ - 1