{{#Wiki_filter:OPERATING STATUSOPERATING DATAREPORTDOCKETNO.:50-220DATE:I/31/91COMPLETED BY:K.A.DahlbergTELEPHONE:
{{#Wiki_filter:OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: I/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:
(315)349-24431.UnitName:NineMilePointUnitPl2.Reporting Period:7/I/90through7/31/903.LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):640S.DesignElectrical Rating(NetMWe):6206.MaximumDependable Capacity(GrossMWe):6307.MaximumDependable Capacity(NetMWe):6108.IfChangesOccurinCapacityRatings(itemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative 11.HoursinReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16..GrossThermalEneigyGenerated (MWH)17.GrossElectrical EnergyGenerated (MW@18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(1'ype,Dateand744.029.80.00.00.0115.00.00.00.00.00.00.0100.0DurationofEach):5,087.0,29.8'.00.00.0115.00.00.00.00.00.00.0100.0182,976.2 115,264.1 1,204.2112,117.2 20.4188,473,247.0 62,473,070.0 60,524,382,0 61.361.354.253.426.125.IfShutDownAtEndofReportPeriod,Estimated DateofStartup:PowerAscension Testin26.UnitisTestStatus(PriortoCommercial Operation):
(315)349-2443 1.Unit Name: Nine Mile Point Unit Pl 2.Reporting Period: 7/I/90 through 7/31/90 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 S.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16..Gross Thermal Eneigy Generated (MWH)17.Gross Electrical Energy Generated (MW@18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (1'ype, Date and 744.0 29.8 0.0 0.0 0.0 115.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Duration of Each): 5,087.0, 29.8'.0 0.0 0.0 115.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 182,976.2 115,264.1 1,204.2 112,117.2 20.4 188,473,247.0 62,473,070.0 60,524,382,0 61.3 61.3 54.2 53.4 26.1 25.If Shut Down At End of Report Period, Estimated Date of Startup: Power Ascension Testin 26.Unit is Test Status (Prior to Commercial Operation):
ForecastAchievedIN1TIALCRlTICAL1TY IN1TIALELECTRIClTY COMMERCIAL OPERATION 9102200099 910207PDRADOCK05000220RPDR I'If}}
Forecast Achieved IN1TIAL CRlTICAL1TY IN1TIAL ELECTRIClTY COMMERCIAL OPERATION 9102200099 910207 PDR ADOCK 05000220 R PDR I'I f}}

Revision as of 00:32, 8 July 2018

Revised Monthly Operating Rept for Jul 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B300
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/31/1990
From: DAHLBERG K A
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200099
Download: ML17056B300 (2)


Text

OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: I/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:

(315)349-2443 1.Unit Name: Nine Mile Point Unit Pl 2.Reporting Period: 7/I/90 through 7/31/90 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 S.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16..Gross Thermal Eneigy Generated (MWH)17.Gross Electrical Energy Generated (MW@18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (1'ype, Date and 744.0 29.8 0.0 0.0 0.0 115.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Duration of Each): 5,087.0, 29.8'.0 0.0 0.0 115.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 182,976.2 115,264.1 1,204.2 112,117.2 20.4 188,473,247.0 62,473,070.0 60,524,382,0 61.3 61.3 54.2 53.4 26.1 25.If Shut Down At End of Report Period, Estimated Date of Startup: Power Ascension Testin 26.Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved IN1TIAL CRlTICAL1TY IN1TIAL ELECTRIClTY COMMERCIAL OPERATION 9102200099 910207 PDR ADOCK 05000220 R PDR I'I f