{{#Wiki_filter:ACCELERATED DISIBUTION DEMONSTRION SYSTEMREGULATORY INFORMATION'DISTRIBUTZON SYSTEM(RIDS)ACCESSION NBR:8804220090 DOC.DATE:
{{#Wiki_filter:ACCELERATED DISIBUTION DEMONSTRION SYSTEM REGULATORY INFORMATION'DISTRIBUTZON SYSTEM (RIDS)ACCESSION NBR:8804220090 DOC.DATE: 88/04/11 NOTARIZED:
88/04/11NOTARIZED:
NO DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana&05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana&05000316 AUTH.NAME AUTHOR AFFILIATION SMITH,W.G.
NODOCKETFACIL:50-315 DonaldC.CookNuclearPowerPlant,Unit1,Indiana&0500031550-316DonaldC.CookNuclearPowerPlant,Unit2,Indiana&05000316AUTH.NAMEAUTHORAFFILIATION SMITH,W.G.
Indiana Michigan Power Co.(formerly Indiana&Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
IndianaMichiganPowerCo.(formerly Indiana&MichiganEleRECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
RO:on880411,fire waterprotection sysnotoperable.
RO:on 880411,fire water protection sys not operable.DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73 Licensee Event Report (LER), Incid nt Rpt, etc.NOTES: RECIPIENT ID CODE/NAME PD3-3 LA STANG,J INTERNAL: ACRS MICHELSON AEOD/DOA AEOD/DS P/ROAB ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB SD NRR/DEST/MEB 9H NRR/DEST/PSB SD NRR/DEST/SGB SD NRR/DLPQ/QAB 10 NRR/DREP/RAB 10 IB 9A REG FI E 02 RES/DB/RGN3 FILE 01 EXTERNAL: EG&G GROH,M H ST LOBBY WARD NRC PDR NSIC MAYS,G COPIES LTTR ENCL 1 1 1 1 1 1 1 1 2 2 1 1 1 0 1 1 1.1 1 1 1 1 1 1 1 1 1 1 1 1-1 1 1 1 4 4 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD3-3 PD ACRS MOELLER AEOD/DSP/NAS AEOD/DS P/TPAB DEDRO NRR/DEST/CEB SH NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB ll NRR/DREP/RPB 10 NRR/PMAS/ILRB12 RES TELFORD,J RES/DRPS DIR FORD BLDG HOY,A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1'2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1-1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 A S j A TOTAL NUMBER OF COPIES REQUIRED: LTTR 45 ENCL 44
DISTRIBUTION CODE:IE22DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:50.73LicenseeEventReport(LER),IncidntRpt,etc.NOTES:RECIPIENT IDCODE/NAME PD3-3LASTANG,JINTERNAL:
~~Indiana Michigan Power Company Cook Nuclear Plant P.O.Box 458 Bridgman, Mi 49106 616 465 5901'pril 11, 1988 INDIANA NICHIGAN POWM Donald C.Cook Nuclear Plant, Unit Nos.1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Attn: A.B.Davis  
ACRSMICHELSON AEOD/DOAAEOD/DSP/ROABARM/DCTS/DAB NRR/DEST/ADS 7ENRR/DEST/ESB SDNRR/DEST/MEB 9HNRR/DEST/PSB SDNRR/DEST/SGB SDNRR/DLPQ/QAB 10NRR/DREP/RAB 10IB9AREGFIE02RES/DB/RGN3FILE01EXTERNAL:
EG&GGROH,MHSTLOBBYWARDNRCPDRNSICMAYS,GCOPIESLTTRENCL11111111221110111.1111111111111-111144111111RECIPIENT IDCODE/NAME PD3-3PDACRSMOELLERAEOD/DSP/NAS AEOD/DSP/TPABDEDRONRR/DEST/CEB SHNRR/DEST/ICSB 7NRR/DEST/MTB 9HNRR/DEST/RSB 8ENRR/DLPQ/HFB 10NRR/DOEA/EAB llNRR/DREP/RPB 10NRR/PMAS/ILRB12 RESTELFORD,J RES/DRPSDIRFORDBLDGHOY,ALPDRNSICHARRIS,JCOPIESLTTRENCL1'2211111111111111111-122111111111111ASjATOTALNUMBEROFCOPIESREQUIRED:
LTTR45ENCL44
~~IndianaMichiganPowerCompanyCookNuclearPlantP.O.Box458Bridgman, Mi491066164655901'pril11,1988INDIANANICHIGANPOWMDonaldC.CookNuclearPlant,UnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Attn:A.B.Davis


==DearMr.Davis:==
==Dear Mr.Davis:==
ThisistoconfirmaverbalreportmadetoMr.R.Kazmarofyourstaffat0953hoursonAprilll,1988.AtthattimeMr.KazmarwasinformedthattheFireProtection WaterSystemwasnotoperableasrequiredbyTechnical Specification 3.7.9.1.b duetotheplannedisolation ofaportionofthesouthlegoftheoutsidefireprotection ringheader.Theaffectedportionoftheoutsideringheaderwasisolatedat0350hoursonApril11,1988,tofacilitate theplannedreplacement ofthreeisolation valvesintheoutsidefireprotection ringheader.Replacement ofthevalvesisexpectedtobecompleted byApril18,1988.TheDelugeSystemforthePreferred ReserveSourcePowerTransformer (TR-201-CD) wasremovedfromserviceduetotheisolation ofthissectionoffireprotection piping.Twofirehydrantswithintheprotected areawerealsoremovedfromservice.Backupfireprotection isavailable fromnearbyfirehydrantsandthePlantFireTruck.Thisletterwillfulfilltherequirements ofTechnical Specification 3.7.9.1Actionb.'2bwhichrequiresafollow-up reportnolaterthanthefirstworkingdayfollowing theeventandTechnical Specification 3.7.9.1Actionb.2cwhichrequiresafollow-up reportwithinfourteendays.Respectfully, PlantManage/babcc:SeeAttachedDistribution 8804220090 8804iiPDRADOCK050008158DCD cc;D.H.Williams, Jr.A.B.Davis,RegionIIIM.P.AlexichR.F.KroegerH.B.BruggerR.W.Jurgensen
This is to confirm a verbal report made to Mr.R.Kazmar of your staff at 0953 hours on April ll, 1988.At that time Mr.Kazmar was informed that the Fire Protection Water System was not operable as required by Technical Specification 3.7.9.1.b due to the planned isolation of a portion of the south leg of the outside fire protection ring header.The affected portion of the outside ring header was isolated at 0350 hours on April 11, 1988, to facilitate the planned replacement of three isolation valves in the outside fire protection ring header.Replacement of the valves is expected to be completed by April 18, 1988.The Deluge System for the Preferred Reserve Source Power Transformer (TR-201-CD) was removed from service due to the isolation of this section of fire protection piping.Two fire hydrants within the protected area were also removed from service.Backup fire protection is available from nearby fire hydrants and the Plant Fire Truck.This letter will fulfill the requirements of Technical Specification 3.7.9.1 Action b.'2b which requires a follow-up report no later than the first working day following the event and Technical Specification 3.7.9.1 Action b.2c which requires a follow-up report within fourteen days.Respectfully, Plant Manage/bab cc: See Attached Distribution 8804220090 8804ii PDR ADOCK 05000815 8 DCD cc;D.H.Williams, Jr.A.B.Davis, Region III M.P.Alexich R.F.Kroeger H.B.Brugger R.W.Jurgensen'RC Resident Inspector J.F.Stang R.C.Callen G.Charnoff, Esq.Dottie Sherman, ANI Library D.Hahn INPO PNSRC A.A.Blind P.A.Barrett/P.
'RCResidentInspector J.F.StangR.C.CallenG.Charnoff, Esq.DottieSherman,ANILibraryD.HahnINPOPNSRCA.A.BlindP.A.Barrett/P.
Lauzau H}}
Lauzau H}}

Revision as of 08:30, 6 July 2018

Ro:On 880411,fire Protection Water Sys Not Operable Per Tech Spec 3.7.9.1.b.Caused by Planned Isolation of Portion of South Leg of Outside Fire Protection Ring Header.Backup Fire Protection Available from Nearby Fire Dept
ML17325A680
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/11/1988
From: SMITH W G
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DAVIS A B
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8804220090
Download: ML17325A680 (4)


Text

ACCELERATED DISIBUTION DEMONSTRION SYSTEM REGULATORY INFORMATION'DISTRIBUTZON SYSTEM (RIDS)ACCESSION NBR:8804220090 DOC.DATE: 88/04/11 NOTARIZED:

NO DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana&05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana&05000316 AUTH.NAME AUTHOR AFFILIATION SMITH,W.G.

Indiana Michigan Power Co.(formerly Indiana&Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

RO:on 880411,fire water protection sys not operable.DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73 Licensee Event Report (LER), Incid nt Rpt, etc.NOTES: RECIPIENT ID CODE/NAME PD3-3 LA STANG,J INTERNAL: ACRS MICHELSON AEOD/DOA AEOD/DS P/ROAB ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB SD NRR/DEST/MEB 9H NRR/DEST/PSB SD NRR/DEST/SGB SD NRR/DLPQ/QAB 10 NRR/DREP/RAB 10 IB 9A REG FI E 02 RES/DB/RGN3 FILE 01 EXTERNAL: EG&G GROH,M H ST LOBBY WARD NRC PDR NSIC MAYS,G COPIES LTTR ENCL 1 1 1 1 1 1 1 1 2 2 1 1 1 0 1 1 1.1 1 1 1 1 1 1 1 1 1 1 1 1-1 1 1 1 4 4 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD3-3 PD ACRS MOELLER AEOD/DSP/NAS AEOD/DS P/TPAB DEDRO NRR/DEST/CEB SH NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB ll NRR/DREP/RPB 10 NRR/PMAS/ILRB12 RES TELFORD,J RES/DRPS DIR FORD BLDG HOY,A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1'2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1-1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 A S j A TOTAL NUMBER OF COPIES REQUIRED: LTTR 45 ENCL 44

~~Indiana Michigan Power Company Cook Nuclear Plant P.O.Box 458 Bridgman, Mi 49106 616 465 5901'pril 11, 1988 INDIANA NICHIGAN POWM Donald C.Cook Nuclear Plant, Unit Nos.1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Attn: A.B.Davis

Dear Mr.Davis:

This is to confirm a verbal report made to Mr.R.Kazmar of your staff at 0953 hours0.011 days <br />0.265 hours <br />0.00158 weeks <br />3.626165e-4 months <br /> on April ll, 1988.At that time Mr.Kazmar was informed that the Fire Protection Water System was not operable as required by Technical Specification 3.7.9.1.b due to the planned isolation of a portion of the south leg of the outside fire protection ring header.The affected portion of the outside ring header was isolated at 0350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> on April 11, 1988, to facilitate the planned replacement of three isolation valves in the outside fire protection ring header.Replacement of the valves is expected to be completed by April 18, 1988.The Deluge System for the Preferred Reserve Source Power Transformer (TR-201-CD) was removed from service due to the isolation of this section of fire protection piping.Two fire hydrants within the protected area were also removed from service.Backup fire protection is available from nearby fire hydrants and the Plant Fire Truck.This letter will fulfill the requirements of Technical Specification 3.7.9.1 Action b.'2b which requires a follow-up report no later than the first working day following the event and Technical Specification 3.7.9.1 Action b.2c which requires a follow-up report within fourteen days.Respectfully, Plant Manage/bab cc: See Attached Distribution 8804220090 8804ii PDR ADOCK 05000815 8 DCD cc;D.H.Williams, Jr.A.B.Davis, Region III M.P.Alexich R.F.Kroeger H.B.Brugger R.W.Jurgensen'RC Resident Inspector J.F.Stang R.C.Callen G.Charnoff, Esq.Dottie Sherman, ANI Library D.Hahn INPO PNSRC A.A.Blind P.A.Barrett/P.

Lauzau H