IR 05000298/1978015: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 2: Line 2:
| number = ML20197B824
| number = ML20197B824
| issue date = 10/25/1978
| issue date = 10/25/1978
| title = Ack Receipt of 781003 Ltr Informing NRC of Steps Taken to Correct Deviations Noted in Inspec Rept#50-298/78-15
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Inspec Rept#50-298/78-15
| author name = Madsen G
| author name = Madsen G
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7811080106
| document report number = NUDOCS 7811080106
| title reference date = 10-03-1978
| package number = ML20197B829
| package number = ML20197B829
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Revision as of 00:44, 9 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Inspec Rept#50-298/78-15
ML20197B824
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/25/1978
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20197B829 List:
References
NUDOCS 7811080106
Download: ML20197B824 (1)


Text

. . _ . . _ _

gR $Ec ue UNITED STAT ES

[ 'o NUCLEAR REGULATORY COMMISSnON

!"

$ e' s

.$

REciON iv 611 RYAN PLA"'A DRIVE, SUITE 1000

,

G ,MA

  • ' '

o [ ARLINGTON, TEXAS 76011

%, u s y

          • October 25, 1978 In Reply Refer To:

g Docket No. 50-298/78-15 Nebraska Public Power District ATTN: Mr. J. M. Pilant, Director Licensing and Quality Assurance P. O. Box 499 Columbus, Nebraska 68601 Gentlemen:

Thank you for your letter of October 3,1978 in response to our letter and Notice of Deviation aated September 12, 1978. We have no further questions at this time and we will review the actions you have taken to satisfy the NFPA Code requirements during a future inspectio

Sincerely, f"7?/x.4 v--

G. L. Madsen, Chief, Reactor Operaticns and Nuclear Support Branch cc:

L. C. Lessor, Superintendent Cooper Nuclear Station P. O. Box 98 Brownville, Nebraska 68321 781108 o/ 0 C,