Responds to 780912 NRC Ltr Re Deviation Noted in Inspec Rept 50-298/78-15.Corrective Actions:Hose Removed from Doorway
ML20197B846
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/03/1978
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20197B829 List:
References
NUDOCS 7811080112
Download: ML20197B846 (2)


Text

- _ _ _ . ...

O ;P '

r f,&; coonca noctenn s rnrion e.o. nox 98. naownvittc, stonassa ca32:

ic 1ctornonci4023 2s.3.i1 Q. Nebraska Public Power Distr.

===n== _ = ,= n t= n n g = -= -=g = = = = - - ..

October 3, 1978 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Suite 1000 Arlington, Texas 76011

Subject:

NPPD Response to IE Inspection Report 50-298/78-15

Dear Mr. Seyfrit:

This letter is written in response to the letter dated September 12, 1978, transmitting IE Inspection Report 50-298/78-15 which indicatad that one of our activities was not carried out in accordance with an industry approved code.

Statement of Deviation Section 14-1.2 of NFPA 80-1977, " Fire Doors and Windows," requires, in part, that all fire doors be operable at all times and that they shall be kept closed and latched or arranged for automatic closing.

Contrary to this requirement, it was noted on August 28, 1978 that the fire door in the reactor building, 903 level leading to the southwest quadrant, was blocked open by a hose, rendering this door inoperable.

This condition was noted af ter normal working hours, and no fire watch was present.

Actions Taken to Satisfy the Requirements of this Code The hose was removed from the doorway when pointed out by the Inspector.

A memo has been written to the Department Supervisors on the subject of fire doors. The memo has also been posted on bulletin boards, r y.

781108 oll L 1

Mr. Karl V. Seyfrit October 3, 1978 Page 2.

Date When the Above Actions Will Be Completed The above actions have been completed as of this date, October 3, 1978.

Should you have any questions or comments regarding th!s response, please do not hesitate to contact us.

Sincerely,

/fa) ud O X%u~

c 'l J. M. Pilant I Director of Licensing and Quality Assurance JMP:LCL:cg