Gentlemen:
Gentlemen:
i This is to acknowledge receipt of your letter dated July 31, 1987, which transmitted Revision 82 to the Big Rock Point Site Emergency Plan, Volume 9.
i This is to acknowledge receipt of your {{letter dated|date=July 31, 1987|text=letter dated July 31, 1987}}, which transmitted Revision 82 to the Big Rock Point Site Emergency Plan, Volume 9.
                   ~ This submission included a revision of Chapter 5, Organization Control of-Emergencies. . Included in this revision was a new tabular format listing the minimum shift staffing requirements to conform with the guidance of Table B-1 of'NUREG-0654, Revision 1. This change of format for listing minimum shift staffing was recommended in a letter'of March 5, 1987 from
                   ~ This submission included a revision of Chapter 5, Organization Control of-Emergencies. . Included in this revision was a new tabular format listing the minimum shift staffing requirements to conform with the guidance of Table B-1 of'NUREG-0654, Revision 1. This change of format for listing minimum shift staffing was recommended in a letter'of March 5, 1987 from
                   -W.- D. Shafer, Chief, Emergency. Preparedness and Radiological Protection
                   -W.- D. Shafer, Chief, Emergency. Preparedness and Radiological Protection

Latest revision as of 13:52, 9 March 2021

Advises That 870731 Rev 82 to Plant Site Emergency Plan Consistent W/Provisions of 10CFR50.54(q) & Acceptable
ML20238A747
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/03/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Buckman F
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8709090408
Download: ML20238A747 (2)


Text

_ _ _ _ _ _

  1. .e ,

pp{g I 1

. SEP 0 3 198'1 Docket No. 50-155 Consumers Power Company 3 h

ATTN: Dr. F. W. Buckman .)

.Vice President  !

Nuclear Operations  ;

212 West. Michigan Avenue J Jackson, MI 49201 ]

Gentlemen:

i This is to acknowledge receipt of your letter dated July 31, 1987, which transmitted Revision 82 to the Big Rock Point Site Emergency Plan, Volume 9.

~ This submission included a revision of Chapter 5, Organization Control of-Emergencies. . Included in this revision was a new tabular format listing the minimum shift staffing requirements to conform with the guidance of Table B-1 of'NUREG-0654, Revision 1. This change of format for listing minimum shift staffing was recommended in a letter'of March 5, 1987 from

-W.- D. Shafer, Chief, Emergency. Preparedness and Radiological Protection

. Branch, Region'III.

Our review has indicated that these changes to the Big Rock Point Site Emergency. Plan,-Revision 82, are consistent with the requirements of 10 CFR 50.54(q) and do not decrease the effectiveness of your plan.

Your revised listing of minimum shift staffing to include 30 minute and 60 minute. response capability in one table has been considered satisfactory.

Please be' reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan. However, if your safety review indicates no decrease in emergency preparedness effectiveness, then changes can be made without prior NRC approval. In all cases, you must furnish copies of each proposed change to the NRC in )

accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan l Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V (Implementing Procedures).

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC's Public Document Room.

'If you have any questions concerning this letter, please contact Mr. James P. Patterson of my staff at (312) 790-5536.

Sincerely,

} } ) hva6Y

'd. D. Shafer, Chief e709090408 870903 Emergency Preparedness and PDR.

F ADOCK 05000155 PDR Radiological Protection Branch ,

1 g/l 3[

See Attached Distribution l RIIIgff-Patterson cr RII F RII Snell J a-

.h,,/

Shy er W Y

\k l 98 / O M7 '

o I'

g Consumers Powr Comp'aoy SEP 0S;19Tl i l

Distribution s s,

,.3 cc: Mr. Kenneth W."Borry, Director "

Nuclear Licenen)'

ThomasW.Elwary,P*lant Manager

DCS/RSB (RIOS)

Licensing FeeiMenagement Branch Resident Inspbetor, RIII Ronald Callen, Michigan Publig Service Commission Michiganf0etartment of '

., j Public Health R. L. LnFreniere, RIII /

W. Weaver, FEMA Region V U. Matthews, NRR, EPB g.

s N

l b

s

!P.I  ;

' lt

. d', ,.

0

fs

  • w

\

.j V

j-f

( .'

t

.B l- .,

t I

s 1

l l'ti k i l<.

l:

1-Ott h V 8- d3S L8bt S0-0EWSQ

._ _ _ - _ _ - - _ _ .