ML20137W073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:.
.
                                      SEP 3 01985
    Docket No. 50-461
    Illinois Power Company
    ATTN:    Mr. W. C. Gerstner
              Executive Vice President
    500 South 27th Street
    Decatur, IL 62525
    Gentlemen:
    This refers to the special safety inspection conducted by Mr. J. W. Muffett of
    this office on September 11, 1985, of activities at Clinton Nuclear Power
    Station, Unit 1, authorized by NRC Construction Permit No. CPPR-137 and to the
    discussion of our findings with Ms. K.'A. Baker at the conclusion of the
    inspection.
    The enclosed copy of our inspection report identifies areas examined during
    the inspection. Within these areas, the inspection consisted of a selective
    examination of procedures and representative records, observations, and
    interviews with personnel.
    No violations of NRC requirements were identified during the course of this
    inspection.
    In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
    this letter and the enclosed inspection report will be placed in the NRC's
    Public Document Room.
    We will gladly discuss any questions you have concerning this inspection.
                                            Sincerely,
                                            6;;h:1 S;cr.:d by 3. J. Ihn um
                                            J. J. Harrison, Chief
                                            Engineering Branch.
    ' Enclosure: Inspection Report
        No. 50-461/85049(DRS)
    See Attached List For Distribution
      8510040215 850930
      $DR ADOCK 05000461  PDR
                                                                                    \\
                                                                                st 6cf
 
      .
. . .
        -Illinois' Power Company            2          -SEP 3 01985
          Distribution
          cc w/ enclosure:
        .DCS/RSB (RIDS)
          Licensing Fee Management Branch
          Resident Inspector, RIII.
          Richard Hubbard
          Gary N. Wright, Manager
              Nuclear Facility Safety
          Jean Foy, Prairie Alliance
          Allen Samelson, Assistant
            Attorney General,
              Environmental Control Division
          H. S. Taylor, Quality Assurance
            Division
        RIII                  RIII          RIII
        dws/\
        Murfett/1s
                                Ayvf
                                Dani,eIson    ;
                                                    (v  RII{4b
                                                          Ha&
                                                lonski    rrison
        09/26/85                ggg            30/g:7    y go
                                                                    l
}}
}}

Latest revision as of 18:04, 30 June 2020

Forwards Safety Insp Rept 50-461/85-49 on 850911.No Violation Noted
ML20137W073
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/30/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20137W078 List:
References
NUDOCS 8510040215
Download: ML20137W073 (2)


See also: IR 05000461/1985049

Text

.

.

SEP 3 01985

Docket No. 50-461

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the special safety inspection conducted by Mr. J. W. Muffett of

this office on September 11, 1985, of activities at Clinton Nuclear Power

Station, Unit 1, authorized by NRC Construction Permit No. CPPR-137 and to the

discussion of our findings with Ms. K.'A. Baker at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

6;;h:1 S;cr.:d by 3. J. Ihn um

J. J. Harrison, Chief

Engineering Branch.

' Enclosure: Inspection Report

No. 50-461/85049(DRS)

See Attached List For Distribution

8510040215 850930

$DR ADOCK 05000461 PDR

\\

st 6cf

.

. . .

-Illinois' Power Company 2 -SEP 3 01985

Distribution

cc w/ enclosure:

.DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII.

Richard Hubbard

Gary N. Wright, Manager

Nuclear Facility Safety

Jean Foy, Prairie Alliance

Allen Samelson, Assistant

Attorney General,

Environmental Control Division

H. S. Taylor, Quality Assurance

Division

RIII RIII RIII

dws/\

Murfett/1s

Ayvf

Dani,eIson  ;

(v RII{4b

Ha&

lonski rrison

09/26/85 ggg 30/g:7 y go

l