ML17056B303: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/30/1990
| issue date = 04/30/1990
| title = Revised Monthly Operating Rept for Apr 1990 for Nine Mile Point Nuclear Station Unit 1
| title = Revised Monthly Operating Rept for Apr 1990 for Nine Mile Point Nuclear Station Unit 1
| author name = DAHLBERG K A
| author name = Dahlberg K
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  

Revision as of 16:30, 19 June 2019

Revised Monthly Operating Rept for Apr 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B303
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/30/1990
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200112
Download: ML17056B303 (2)


Text

OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dnhlberg TELEPHONE:

(315)349-2443 1.Unit Name: Nine Mile Point Unit//1 2.Reporting Period: 4/1/90 through 4/30/90 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes[Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (¹t MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MY'8.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (I'ype, Date Refuel outa e started on anua 22 1988.719.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 and Duration of Each): 2,879.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 180,768.2 115,234.3 1,2042 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 62.0 62.0 54.9 54.0 25.1 25.If Shut Down At End of Report Period, Estimated Date of Startup: Ma 23 1990 26.Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRIClTY COMMERCIAL OPERATION 9i02200ii2 910207 PDR AGOCK 05000220 R PDR J'