{{#Wiki_filter:OPERATING STATUSOPERATING DATAREPORTDOCKETNO.:50-220DATE:1/31/91COMPLETED BY:K.A.DahlbergTELEPHONE:
{{#Wiki_filter:OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:
(315)349-24431.UnitName:NineMilePointUnit¹12.Reporting Period:12/1/89through12/31/893.LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):6405.DesignElectrical Rating(NetMWe):6206.MaximumDependable Capacity(GrossMWe):6307.MaximumDependable Capacity(NetMWe):6108.IfChangesOccurinCapacityRatings(ItemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative 11.HoursinReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated
(315)349-2443 1.Unit Name: Nine Mile Point Unit¹1 2.Reporting Period: 12/1/89 through 12/31/89 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (Items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated~19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (I'ype, Date and Refuel outa e started on anua 22 1988.744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Duration of Each): 8,760.0 0.0, 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 177,889.2 115,234.3 1,204.2 112,1174 20A 188,473,132.0 62,473,070.0 60,524,382.0 63.0 63.0 55.8 54.9 23,6 25.If Shut Down At End of Report Period, Estimated Date of Startup: March 7 1990 26.Unit is Test Status (Prior to Commercial Operation):
~19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(I'ype,DateandRefueloutaestartedonanua221988.744.00.00.00.00.00.00.00.00.00.00.00.0100.0DurationofEach):8,760.00.0,0.00.00.00.00.00.00.00.00.00.0100.0177,889.2 115,234.3 1,204.2112,117420A188,473,132.0 62,473,070.0 60,524,382.0 63.063.055.854.923,625.IfShutDownAtEndofReportPeriod,Estimated DateofStartup:March7199026.UnitisTestStatus(PriortoCommercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9102200118 910207 PDR ADOCK 05000220 R PDR 4O 4 ,a}}
ForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 9102200118 910207PDRADOCK05000220RPDR 4O4,a}}

Revision as of 00:32, 8 July 2018

Revised Monthly Operating Rept for Dec 1989 for Nine Mile Point Nuclear Station
ML17056B307
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/31/1989
From: DAHLBERG K A
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200118
Download: ML17056B307 (2)


Text

OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:

(315)349-2443 1.Unit Name: Nine Mile Point Unit¹1 2.Reporting Period: 12/1/89 through 12/31/89 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (Items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated~19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (I'ype, Date and Refuel outa e started on anua 22 1988.744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Duration of Each): 8,760.0 0.0, 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 177,889.2 115,234.3 1,204.2 112,1174 20A 188,473,132.0 62,473,070.0 60,524,382.0 63.0 63.0 55.8 54.9 23,6 25.If Shut Down At End of Report Period, Estimated Date of Startup: March 7 1990 26.Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9102200118 910207 PDR ADOCK 05000220 R PDR 4O 4 ,a