ML17056B303: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/30/1990
| issue date = 04/30/1990
| title = Revised Monthly Operating Rept for Apr 1990 for Nine Mile Point Nuclear Station Unit 1
| title = Revised Monthly Operating Rept for Apr 1990 for Nine Mile Point Nuclear Station Unit 1
| author name = DAHLBERG K A
| author name = Dahlberg K
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATINGSTATUSOPERATINGDATAREPORTDOCKETNO.:50-220DATE:1/31/91COMPLETEDBY:K.A.DnhlbergTELEPHONE:(315)349-24431.UnitName:NineMilePointUnit//12.ReportingPeriod:4/1/90through4/30/903.LicensedThermalPower(MWt):18504.NameplateRating(GrossMWe):6405.DesignElectricalRating(NetMWe):6206.MaximumDependableCapacity(GrossMWe):6307.MaximumDependableCapacity(NetMWe):6108.IfChanges[OccurinCapacityRatings(itemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted,IfAny(¹tMWe):10.ReasonsForRestrictions,IfAny:ThisMonthYr-to-DateCumulative11.HoursinReportingPeriod12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGeneratorOn-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated(MWH)17.GrossElectricalEnergyGenerated(MY'8.NetElectricalEnergyGenerated(MWH)19.UnitServiceFactor20.UnitAvailabilityFactor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.ShutdownsScheduledOverNext6Months(I'ype,DateRefueloutaestartedonanua221988.719.00.00.00.00.00.00.00.00.00.00.00.0100.0andDurationofEach):2,879.00.00.00.00.00.00.00.00.00.00.00.0100.0180,768.2115,234.31,2042112,117.220.4188,473,132.062,473,070.060,524,382.062.062.054.954.025.125.IfShutDownAtEndofReportPeriod,EstimatedDateofStartup:Ma23199026.UnitisTestStatus(PriortoCommercialOperation):ForecastAchievedINITIALCRITICALITYINITIALELECTRIClTYCOMMERCIALOPERATION9i02200ii2910207PDRAGOCK05000220RPDR J'}}
{{#Wiki_filter:OPERATING DATA REPORT                          DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
: 1. Unit Name: Nine Mile Point Unit //1
: 2. Reporting Period: 4/1/90 through 4/30/90                                      Notes
: 3. Licensed Thermal Power (MWt):                         1850
: 4. Nameplate Rating (Gross MWe):                         640
: 5. Design Electrical Rating (Net MWe):                   620
: 6. Maximum Dependable Capacity (Gross MWe):               630
: 7. Maximum Dependable Capacity (Net MWe):                 610
: 8. If Changes[Occur in Capacity Ratings (items Number    3 through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,   If Any (¹t MWe):
: 10. Reasons For Restrictions,   IfAny:
This Month          Yr-to-Date      Cumulative
: 11. Hours  in Reporting Period                                  719.0              2,879.0        180,768.2
: 12. Number  of Hours Reactor Was Critical                        0.0                  0.0        115,234.3
: 13. Reactor Reserve Shutdown Hours                                0.0                  0.0          1,2042
: 14. Hours Generator On-Line                                        0.0                  0.0        112,117.2
: 15. Unit Reserve Shutdown Hours                                    0.0                  0.0              20.4
: 16. Gross Thermal Energy Generated (MWH)                          0.0                  0.0    188,473,132.0
: 17. Gross Electrical Energy Generated                              0.0                  0.0      62,473,070.0 (MY'8.
Net Electrical Energy Generated (MWH)                         0.0                  0.0      60,524,382.0
: 19. Unit Service Factor                                            0.0                  0.0              62.0
: 20. Unit Availability Factor                                      0.0                  0.0              62.0
: 21. Unit Capacity Factor (Using MDC Net)                          0.0                  0.0              54.9
: 22. Unit Capacity Factor (Using DER Net)                          0.0                  0.0              54.0
: 23. Unit Forced Outage Rate                                      100.0                100.0              25.1
: 24. Shutdowns Scheduled Over Next 6 Months (I'ype, Date and Duration    of Each):
Refuel outa e started on anua            22 1988.
: 25. IfShut Down At End of Report Period, Estimated Date of Startup:    Ma 23 1990
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast          Achieved INITIALCRITICALITY INITIALELECTRIClTY COMMERCIAL OPERATION 9i02200ii2 910207 PDR      AGOCK      05000220 R                          PDR
 
J '}}

Latest revision as of 07:41, 30 October 2019

Revised Monthly Operating Rept for Apr 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B303
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/30/1990
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200112
Download: ML17056B303 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit //1
2. Reporting Period: 4/1/90 through 4/30/90 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes[Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (¹t MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 719.0 2,879.0 180,768.2
12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,2042
14. Hours Generator On-Line 0.0 0.0 112,117.2
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
17. Gross Electrical Energy Generated 0.0 0.0 62,473,070.0 (MY'8.

Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0

19. Unit Service Factor 0.0 0.0 62.0
20. Unit Availability Factor 0.0 0.0 62.0
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 54.9
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 54.0
23. Unit Forced Outage Rate 100.0 100.0 25.1
24. Shutdowns Scheduled Over Next 6 Months (I'ype, Date and Duration of Each):

Refuel outa e started on anua 22 1988.

25. IfShut Down At End of Report Period, Estimated Date of Startup: Ma 23 1990
26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRIClTY COMMERCIAL OPERATION 9i02200ii2 910207 PDR AGOCK 05000220 R PDR

J '