{{#Wiki_filter:9.
.,.
                                                    MAR 111988
        Docket No. 50-346
        Toledo Edison Company
        ATTN:    Mr. Donald Shelton
                Vice President
                Nuclear
        Edison Plaza
        300 Madison Avenue
        Toledo, OH 43652
        Gentlemen:
        This refers to the routine safety inspection conducted by Mr. K. D. Ward of
        this office on February 2-4, 9-11, 23-25, and March 7-8, 1988, of activities
        at Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC Operating
        License No. NPF-3 and to the discussion of our findings with Mr. G. Honma at
        the conclusion of the inspection.
        The enclosed copy of our inspection report identifies areas exanined during
        the inspection. Within these areas, the inspection consisted oi a selective
        examination of procedures and representative records, observations, and
        intervi);s with personnel.
        No violations of NRC requirements were identified during the course of this
        inspection.
        In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
        this letter and the enclosed inspection report will be placed in the NRC
        Public Document Room.
        We will gladly discuss any questions you have concerning this inspection.
                                                  Sincerely,
                                                          , (LYM      'L
                                                J.J.    frrison, Chief
                                                  Engineering Branch
        Enclosure: Inspection Report
          No. 50-346/88005(DRS)
        See Attached Distribution
        t"                            '/e3
        RIII            RIII          RIII            RI
        W                olTIM        'Q"*y','O                  V
                          ""'''' "        ''''k*  *'  "'
    /"~"''"'''            3)n/U                                't'
                                        3/a(CX
      8803210276 880311
      PDR    ADOCK 05000346                                                          (
      o                    DCD
                                                                                    3 - g: j
 
                                                          ,
      . f,
  . ,'
            Toledo Edison Company          2
                                              ht4P i 1]988
            Distribution
            cc w/ enclosure:
            L. Storz, Plant Manager
                                                            l
            DCD/DCB (RIDS)
            Licensing Fee Management Branch
            Resident Inspector, RIII
            Harold W. Kohn, Ohio EPA
            James W. Harris, State of Ohio
            Robert M. Quillin, Ohio
              Department of Health
            State of Ohio, Public
              Utilities Commission
i
!
r
!
l
;
1
l
l
}}
}}

Latest revision as of 18:50, 21 July 2020

Forwards Safety Insp Rept 50-346/88-05 on 880202-04,09-11, 23-25 & 0307-08.No Violations Noted
ML20148A965
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/11/1988
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20148A969 List:
References
NUDOCS 8803210276
Download: ML20148A965 (2)


See also: IR 05000346/1988005

Text

9.

.,.

MAR 111988

Docket No. 50-346

Toledo Edison Company

ATTN: Mr. Donald Shelton

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward of

this office on February 2-4, 9-11, 23-25, and March 7-8, 1988, of activities

at Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC Operating

License No. NPF-3 and to the discussion of our findings with Mr. G. Honma at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas exanined during

the inspection. Within these areas, the inspection consisted oi a selective

examination of procedures and representative records, observations, and

intervi);s with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

, (LYM 'L

J.J. frrison, Chief

Engineering Branch

Enclosure: Inspection Report

No. 50-346/88005(DRS)

See Attached Distribution

t" '/e3

RIII RIII RIII RI

W olTIM 'Q"*y','O V

""' " 'k* *' "'

/"~""' 3)n/U 't'

3/a(CX

8803210276 880311

PDR ADOCK 05000346 (

o DCD

3 - g: j

,

. f,

. ,'

Toledo Edison Company 2

ht4P i 1]988

Distribution

cc w/ enclosure:

L. Storz, Plant Manager

l

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

James W. Harris, State of Ohio

Robert M. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Commission

i

!

r

!

l

1

l

l