IR 05000327/1986004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20210U489
| number = ML20214H869
| issue date = 05/19/1986
| issue date = 11/14/1986
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/86-04 & 50-328/86-04
| title = Ack Receipt of 861017 Response,Supplementing 860430 & 0703 Responses Re Violations Noted in Insp Repts 50-327/86-04 & 50-328/86-04.NRC Disagrees W/Conclusion That Inclusion of Inaccurate Info in Two Responses Not from Similar Causes
| author name = Grace J
| author name = Grace J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 8606020375
| document report number = NUDOCS 8612010069
| title reference date = 04-30-1986
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 2
}}
}}


Line 19: Line 18:


=Text=
=Text=
{{#Wiki_filter:. . . . .
{{#Wiki_filter:. _  __ _ _ . _ . _ -
M's c. 6 \
: ,
MAY 19 B86 Tenness e f Valley Authority ATTN:gr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 -
%      - ()glh NOV 141986
Gentlemen:
!-
<
Tennessee Valley Authority ATTN: Mr. S. A. White Manager of Nuclear Power 6N.38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT: REPORT NOS. 50-327/86-04 AND 50-328/86-04 Thank you for your response of April 30, 1986, to our Notices of Violation issued on March 27, 1986, concerning activities conducted at your Sequoyah facility. We are evaluating your respons ;
,
n Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-04 AND 50-328/86-04 Thank you for .,our response of October 17, 1986, which supplements your responses of April 30 and July 3,1986, with regard to Violation,86-04-02 included in our
; Notice of Violation issued on March 27, 1986, concerning activities conducted at
!
your Sequoyah facility. We have evaluated your responses and found that they meet the requirements of 10 CFR 2.20 We will examine the implementation of
'
your corrective actions during future inspections.
 
'
The NRC is concerned that your supplemental response of July 3,1986, to the Notice of Violation, contained inaccurate information. Ycur September 4, 1986, response to a Notice of . Violation sent to you with Inspection Report 50-327, 328/86-36 also contained inaccurate information. Your letter of October 17,
,
!
1986, indicated that the inclusion of inaccurate information in the two responses did not have a similar cause. The NRC disagrees with your conclusion. In both cases, your management (.ontrols failed to ensure that information provided to the NRC was accurate. Your letters of September 4, and October 17, 1986, provide corrective actions you have taken or will take to improve your performance in
,
*
. this area. The NRC will continue to monitor your performance in this area and 1 will take additional enforcement action, if necessar We appreciate your cooperation in this matte


Sincerely, DRIGIMAl. S!GMED 378
Sincerely, i
l l
!    J. Nelson Grace Regional Administrator cc: . L. Abercrombie, Site Director j) Sequoyah Nuclear
  . R. Wallace, Plant Plaat Manager i
I NJ. A. Kirkebo, Director Nuclear Engineering dR.L.Gridley, Director Nuclear Safety and Licensing s > R. Harding, Site Licensing
~
Manager bec: (See page 2)      (
,
,
1 NEl. SON GRACE J. Nelson Grace  .
  .~.     30 L 8612010069 861114 -
Regional Administrator  l cc: H. L. Abercrombie, Sequoyah Site Director
I PDR ADOCK ODOOO' J 27      -
  . R. Wallace, Plant Manager K. W. Whitt, Director, Nuclear
        ,
/ Managers Review Group l
G PDR .     ,
V D. L. Williams, Jr. , Supervisor    '
l   _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . . _  _
Licensing Section    {
 
  . B. Kirk, Compliance Staff Supervisor  i
      . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
  . E. Wills, Project Engineer    l bec: . R. Denton, NRR
  . .,
. L. Thompson, NRR     l
Tennessee Valley Authority 2 bec:'f G. G. Zech, RII H. R. Denton, NRR
      '
  .J Q H..L. Thompson, NRR UJ . M. Taylor, IE
. M. Taylor, IE
  .U . B. Hayes, 01
. B. Hayes, 0I
  . R. Connelly 01A (. P. Barr, RII'
. R. Connelly, 0IA d RC Resident Inspector VDocument Control Desk
J RC Resident Inspector NRC Document Control Desk State of Tennessee      .
/StateofTennessee 8606020375 860519 PDR ADOCK 05000327 G  PDR B s.saj  s v ,,7 5/ /86 5//J/86 5/) 86 g 1 I D t
RII RII RII RIl R RI
L50l l
  &
RWeddington o >
fpt L J1YL-<-
DCollin/vJPStohr B
      .
o' s ar 10/'g7 /86 F 10/21/86 10/2ej/86 10//f/86 1(1/(/86 1(/( /86 R RII GJe'nki
  \ % / /86 If/j4/86 l
. . . . . . . . . . . . . . .
}}
}}

Latest revision as of 15:38, 18 December 2021

Ack Receipt of 861017 Response,Supplementing 860430 & 0703 Responses Re Violations Noted in Insp Repts 50-327/86-04 & 50-328/86-04.NRC Disagrees W/Conclusion That Inclusion of Inaccurate Info in Two Responses Not from Similar Causes
ML20214H869
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/14/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8612010069
Download: ML20214H869 (2)


Text

. _ __ _ _ . _ . _ -

,

% - ()glh NOV 141986

!-

Tennessee Valley Authority ATTN: Mr. S. A. White Manager of Nuclear Power 6N.38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

,

n Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-04 AND 50-328/86-04 Thank you for .,our response of October 17, 1986, which supplements your responses of April 30 and July 3,1986, with regard to Violation,86-04-02 included in our

Notice of Violation issued on March 27, 1986, concerning activities conducted at

!

your Sequoyah facility. We have evaluated your responses and found that they meet the requirements of 10 CFR 2.20 We will examine the implementation of

'

your corrective actions during future inspections.

'

The NRC is concerned that your supplemental response of July 3,1986, to the Notice of Violation, contained inaccurate information. Ycur September 4, 1986, response to a Notice of . Violation sent to you with Inspection Report 50-327, 328/86-36 also contained inaccurate information. Your letter of October 17,

,

!

1986, indicated that the inclusion of inaccurate information in the two responses did not have a similar cause. The NRC disagrees with your conclusion. In both cases, your management (.ontrols failed to ensure that information provided to the NRC was accurate. Your letters of September 4, and October 17, 1986, provide corrective actions you have taken or will take to improve your performance in

,

. this area. The NRC will continue to monitor your performance in this area and 1 will take additional enforcement action, if necessar We appreciate your cooperation in this matte

Sincerely, i

l l

! J. Nelson Grace Regional Administrator cc: . L. Abercrombie, Site Director j) Sequoyah Nuclear

. R. Wallace, Plant Plaat Manager i

I NJ. A. Kirkebo, Director Nuclear Engineering dR.L.Gridley, Director Nuclear Safety and Licensing s > R. Harding, Site Licensing

~

Manager bec: (See page 2) (

,

.~. 30 L 8612010069 861114 -

I PDR ADOCK ODOOO' J 27 -

,

G PDR . ,

l _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . . _ _

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. .,

Tennessee Valley Authority 2 bec:'f G. G. Zech, RII H. R. Denton, NRR

.J Q H..L. Thompson, NRR UJ . M. Taylor, IE

.U . B. Hayes, 01

. R. Connelly 01A (. P. Barr, RII'

J RC Resident Inspector NRC Document Control Desk State of Tennessee .

RII RII RII RIl R RI

&

RWeddington o >

fpt L J1YL-<-

DCollin/vJPStohr B

.

o' s ar 10/'g7 /86 F 10/21/86 10/2ej/86 10//f/86 1(1/(/86 1(/( /86 R RII GJe'nki

\ % / /86 If/j4/86 l

. . . . . . . . . . . . . . .