ML20248D599: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20248D599
| number = ML20248D599
| issue date = 10/02/1989
| issue date = 10/02/1989
| title = Ack Receipt of 890808 Ltr & Payment of Civil Penalty in Amount of $75,000.In View of Corrective Actions Taken Re Electrical Junction Box,Partial Payment of Civil Penalty Acceptable
| title = Ack Receipt of & Payment of Civil Penalty in Amount of $75,000.In View of Corrective Actions Taken Re Electrical Junction Box,Partial Payment of Civil Penalty Acceptable
| author name = Lieberman J
| author name = Lieberman J
| author affiliation = NRC OFFICE OF ENFORCEMENT (OE)
| author affiliation = NRC OFFICE OF ENFORCEMENT (OE)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = EA-89-059, EA-89-59, NUDOCS 8910040328
| document report number = EA-89-059, EA-89-59, NUDOCS 8910040328
| title reference date = 08-08-1989
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1
Line 32: Line 33:
                       . Mail Code V-27E lE                      Post.0ffice Box 678 Clinton, Illinois: 61727
                       . Mail Code V-27E lE                      Post.0ffice Box 678 Clinton, Illinois: 61727
,                      Gentlemen:
,                      Gentlemen:
This will acknowledge receipt of your. letter dated August 8,1989.and your check for $75,000 in payment for the' civil per.alties proposed by NRC in a                                                                              ,;
This will acknowledge receipt of your. {{letter dated|date=August 8, 1989|text=letter dated August 8,1989}}.and your check for $75,000 in payment for the' civil per.alties proposed by NRC in a                                                                              ,;
:,                  letter dated July 20, 1989.-. We note that despite paying the full arount of the civil penalty for Violation A, you deny that the electrical Junction box example constitutes a-violation. After reviewing your response the HRC staff maintains its position that a violation. occurred. While we agree that equip-t ment located below the accident flood level is of primary concern with respect to submergence, other pieces of equipment that are not in watertight enclosures and that are located above that level are also of concern.
:,                  {{letter dated|date=July 20, 1989|text=letter dated July 20, 1989}}.-. We note that despite paying the full arount of the civil penalty for Violation A, you deny that the electrical Junction box example constitutes a-violation. After reviewing your response the HRC staff maintains its position that a violation. occurred. While we agree that equip-t ment located below the accident flood level is of primary concern with respect to submergence, other pieces of equipment that are not in watertight enclosures and that are located above that level are also of concern.
In absence of a drain path, it would not take a large ancunt of water to .
In absence of a drain path, it would not take a large ancunt of water to .
submerge such components in many plausible circumstances. Operating experience has shown that there are a number of crecible scenarios. In view of the
submerge such components in many plausible circumstances. Operating experience has shown that there are a number of crecible scenarios. In view of the

Latest revision as of 10:40, 16 March 2021

Ack Receipt of & Payment of Civil Penalty in Amount of $75,000.In View of Corrective Actions Taken Re Electrical Junction Box,Partial Payment of Civil Penalty Acceptable
ML20248D599
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/02/1989
From: Lieberman J
NRC OFFICE OF ENFORCEMENT (OE)
To: Hall D
ILLINOIS POWER CO.
References
EA-89-059, EA-89-59, NUDOCS 8910040328
Download: ML20248D599 (1)


Text

o ,

=

T

'}l

7 J =

=

,g ,. .,

.g c **

. OCT 0 2' 19991

-Docket No? 50-461 License No. NPF-62

.EA 89 ,

Illinois Power Company- *

" ATTN: Mr. D. P.. Hall Senior Vice President l'

Clinton Power Station

. Mail Code V-27E lE Post.0ffice Box 678 Clinton, Illinois: 61727

, Gentlemen:

This will acknowledge receipt of your. letter dated August 8,1989.and your check for $75,000 in payment for the' civil per.alties proposed by NRC in a ,;

, letter dated July 20, 1989.-. We note that despite paying the full arount of the civil penalty for Violation A, you deny that the electrical Junction box example constitutes a-violation. After reviewing your response the HRC staff maintains its position that a violation. occurred. While we agree that equip-t ment located below the accident flood level is of primary concern with respect to submergence, other pieces of equipment that are not in watertight enclosures and that are located above that level are also of concern.

In absence of a drain path, it would not take a large ancunt of water to .

submerge such components in many plausible circumstances. Operating experience has shown that there are a number of crecible scenarios. In view of the

. corrective actions taken and the payment.of the civil penalty, we consider this enforcement action closed.

Your corrective actions will be examined during future inspections.

Sincerely, triginalSigned4y James uakermet James Lieberman, Director Office of Enforcement cc: A. B. Davis,.RII.I Distribution JLieberman

.JLuehman JGrobe, RIII Day File

~EA File DCS 1 1

OEh '

JLuehman JLimberman 10tp/89 10/g89

/

8910040328 891002 9 '

PDR ADOCK 05000461 1 o FDc