ML20203A721: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:.      .
                    .                    ..            .      .-
  .
        9  .
                                                      APR 011986
                In Reply Refer To:
                Docket: STN 50-482/86-04
                                                                                                            i
                Kansas Gas and Electric Company
                ATTN: Glenn L. Koester
                        Vice President - Nuclear
                P. O. Box 208
                Wichita, Kansas 67201
                Gentl emen:
                This refers.to the inspection conducted by Messrs. J. E. Cumins and B. L.
                Bartlett of this office during the period February 1 to 28,1986, of activities
                authorized by NRC Operating License No. NPF-42 for the Wolf Creek Generating
                Station, and to the discussion of our findings with Mr. F. T. Rhodes and other
                members of your staff at the conclusion of the inspection.
                Areas examined during the inspection included plant status, followup on
                previously identified NRC items, operational safety verification, engineered
                safety features system walkdown, onsite followup of events, fire protection, IE
,
                Bulletin followup, monthly surveillance observation, and plant tours. Within
                these areas, the inspection consisted of selective examination of procedures
                and representative records, interviews with personnel, and observations by the
                inspectors. These findings are documented in the enclosed inspection report.
                During this inspection, it was found that certain of your activities were in
                violation of NRC requirements. Consequently, you are required to respond to
,                                                  in accordance with the provisions of
l              these violations,
                Section              in NRC's
                          2.201 of the  writing,ules
                                                R          of Practice," Part 2, Title 10, Code of
j              Federal Regulations. Your response should be based on the specifics contained
3
!
                in the Notice of Violation enclosed with this letter.
                We have also examined actions you have taken with regard to a previously
                identified NRC item. The status of this item is identified in paragraph 3 of
1
                the enclosed report.
                The response directed by this letter and the accompanying Notices are not
                subject to the clearance procedures of the Office of Management and Budget as
                required by the Paperwork Reduction Act of 1980, PL 96-511.
,
                RIV: SRI
                JECur;rnins/$g
                                        RI h
                                        BLBartilett
                                                            RPB/Bh
                                                            DMHunnicutt
                                                                              RPB
                                                                              JEGagliardo
                3 /lg/86                3 /JS/86            ,3//g/86          3 /// /86
                  8604170184 860401 2
'
                  PDR  ADOCK 0500
!                  a
i
                                                                                                        ?
;
                                                                                                      V, ' (
:    _.      .  .
                        - _ -                        -.-              . ___
                                                                                        _ . __ - . . --
 
            ..                            .                        .
t e
    Kansas Gas and Electric Company          -2-
    Should you have any questions concerning this inspection, we will be pleased to
    discuss them with you.
                                        Sincerely,
                                            Orinitu Sbned By
                                            ). E; Gagliardo
                                        J. E. Gagliardo, Chief
                                        Reactor Projects Branch
    Enclosures:
    1.    Appendix A - Notice of Violation
    2.    Appendix B - NRC Inspection Report
            50-482/86-04
    cc w/ enclosures:
    Kansas Gas and Electric Company
    ATTN: Otto L. Maynard, Manager
              of Licensing
    P. O. Box 309 (Sharp Road)
    Wichita, Kansas    67201
    Forrest Rhodes, Plant Superintendent
    Wolf Creek Generating Station
    P. O. Box 309
    Burlington, Kansas 66839
    bec to DMB (IE01)
    bec distrib. by RIV:
    *RPB                          Myron Karman, ELD,liNBB (1)
    * Resident Inspector          R. D. Martin, RA
    *Section Chief, (RPB/B)        DRSP
    *R&SPB                        RIV File
    *RSB                          MIS System
    *RSTS Operator                D. Weiss, LFMB (AR-2015)
    *w/766
      -                                              -
                                                                .-                -.
}}
}}

Latest revision as of 06:48, 1 January 2021

Forwards Insp Rept 50-482/86-04 on 860201-28 & Notice of Violation
ML20203A721
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/01/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Koester G
KANSAS GAS & ELECTRIC CO.
Shared Package
ML20203A728 List:
References
NUDOCS 8604170184
Download: ML20203A721 (2)


See also: IR 05000482/1986004

Text

. .

. .. . .-

.

9 .

APR 011986

In Reply Refer To:

Docket: STN 50-482/86-04

i

Kansas Gas and Electric Company

ATTN: Glenn L. Koester

Vice President - Nuclear

P. O. Box 208

Wichita, Kansas 67201

Gentl emen:

This refers.to the inspection conducted by Messrs. J. E. Cumins and B. L.

Bartlett of this office during the period February 1 to 28,1986, of activities

authorized by NRC Operating License No. NPF-42 for the Wolf Creek Generating

Station, and to the discussion of our findings with Mr. F. T. Rhodes and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included plant status, followup on

previously identified NRC items, operational safety verification, engineered

safety features system walkdown, onsite followup of events, fire protection, IE

,

Bulletin followup, monthly surveillance observation, and plant tours. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

inspectors. These findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

, in accordance with the provisions of

l these violations,

Section in NRC's

2.201 of the writing,ules

R of Practice," Part 2, Title 10, Code of

j Federal Regulations. Your response should be based on the specifics contained

3

!

in the Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to a previously

identified NRC item. The status of this item is identified in paragraph 3 of

1

the enclosed report.

The response directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

,

RIV: SRI

JECur;rnins/$g

RI h

BLBartilett

RPB/Bh

DMHunnicutt

RPB

JEGagliardo

3 /lg/86 3 /JS/86 ,3//g/86 3 /// /86

8604170184 860401 2

'

PDR ADOCK 0500

! a

i

?

V, ' (

_. . .

- _ - -.- . ___

_ . __ - . . --

.. . .

t e

Kansas Gas and Electric Company -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Orinitu Sbned By

). E; Gagliardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-482/86-04

cc w/ enclosures:

Kansas Gas and Electric Company

ATTN: Otto L. Maynard, Manager

of Licensing

P. O. Box 309 (Sharp Road)

Wichita, Kansas 67201

Forrest Rhodes, Plant Superintendent

Wolf Creek Generating Station

P. O. Box 309

Burlington, Kansas 66839

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB Myron Karman, ELD,liNBB (1)
  • Resident Inspector R. D. Martin, RA
  • Section Chief, (RPB/B) DRSP
  • R&SPB RIV File
  • RSB MIS System
  • RSTS Operator D. Weiss, LFMB (AR-2015)
  • w/766

- -

.- -.