ML20195H332: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:- _ _ - _ _ _
NOV 161988 Board of Selectmen ATTN: Mr. Frank R. Mazzilli Chai rman Town Hall Main Street Carver, Massachusetts 02330
 
==Dear Mr. Mazzilli:==
 
This letter forwards a copy of the transcripts of the Public Meeting held by the Nuclear Regulatory Commission (NRC) on September 29, 1988, at Memorial Hall, Plymouth, Massachusetts, to describe the bases for the NRC staff's con-clusion regarding technical and management issues at the Pilgrim Nuclear Power l                  Station (PNPS), and of the public meeting held by NkC on October 5,1988, in Rockville, Maryland, on the status of readiness for restart of PNPS.
This material is provided for your infornation.          Copies of this material have l                  also been sent to the Public Libraries within the Emergency Planning Zone l                  (EPZ), which had previously received copies of the PNPS Restart Plan and Self-Assessment Report, for public review.
l l                  Your continuing cooperation and interest in this matter is appreciated.
Sincerely.
ORIGm1 SIGifED BY Samuel J. Collins, Deputy Director Division of Reactor Projects
 
==Enclosures:==
 
As stated cc w/o encls:
Public Document Room (PDR)
Local Public Document Room (LPDR) bec w/o encis:
L. T. Doerflein, DRP M. J. DiDonato DRP M. T. Miller, SLO OFFICIAL RECORD COPY SELECTMEN CARVER - 0001.0.0 11/16/88 p2Ta:I          "dapaa                                                      io
 
.    .u.
8r. Fr:nx R. sazziiii                  2 g
l C/                        dd (
RI:0RP                  RI:URP              RI:DRP L0oerflein/mjd        gRBlough          .S^JWiggins            ,
ins 11/lb /88              11/to/88            11/}b/88          11/\b/88 0FFICIAL RECORD COPY SELECTMEN CARVER - 0001.1.0 11/16/88}}

Latest revision as of 17:52, 13 November 2020

Forwards Transcripts of 880929 Public Meeting in Plymouth,Ma Re Bases for NRC Conclusions Re Technical & Mgt Issues at Facility & 881005 Public Meeting in Rockville,Md on Status of Readiness for Restart of Plant.W/O Encls
ML20195H332
Person / Time
Site: Pilgrim
Issue date: 11/16/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mazzilli F
CARVER, MA
References
NUDOCS 8811300347
Download: ML20195H332 (2)


Text

- _ _ - _ _ _

NOV 161988 Board of Selectmen ATTN: Mr. Frank R. Mazzilli Chai rman Town Hall Main Street Carver, Massachusetts 02330

Dear Mr. Mazzilli:

This letter forwards a copy of the transcripts of the Public Meeting held by the Nuclear Regulatory Commission (NRC) on September 29, 1988, at Memorial Hall, Plymouth, Massachusetts, to describe the bases for the NRC staff's con-clusion regarding technical and management issues at the Pilgrim Nuclear Power l Station (PNPS), and of the public meeting held by NkC on October 5,1988, in Rockville, Maryland, on the status of readiness for restart of PNPS.

This material is provided for your infornation. Copies of this material have l also been sent to the Public Libraries within the Emergency Planning Zone l (EPZ), which had previously received copies of the PNPS Restart Plan and Self-Assessment Report, for public review.

l l Your continuing cooperation and interest in this matter is appreciated.

Sincerely.

ORIGm1 SIGifED BY Samuel J. Collins, Deputy Director Division of Reactor Projects

Enclosures:

As stated cc w/o encls:

Public Document Room (PDR)

Local Public Document Room (LPDR) bec w/o encis:

L. T. Doerflein, DRP M. J. DiDonato DRP M. T. Miller, SLO OFFICIAL RECORD COPY SELECTMEN CARVER - 0001.0.0 11/16/88 p2Ta:I "dapaa io

. .u.

8r. Fr:nx R. sazziiii 2 g

l C/ dd (

RI:0RP RI:URP RI:DRP L0oerflein/mjd gRBlough .S^JWiggins ,

ins 11/lb /88 11/to/88 11/}b/88 11/\b/88 0FFICIAL RECORD COPY SELECTMEN CARVER - 0001.1.0 11/16/88